56 resultados para large infrastructure
Resumo:
Major maintenance; health, safety, loss of use; and Americans with Disabilities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Tenth Annual Report to the Governor, dated December 15, 2008.
Resumo:
Major maintenance; health, safety, loss of use; and Americans with Disabilities Act deficiencies at the Capitol Complex and statewide for twelve agencies and divisions participating in the Vertical Infrastructure Program in collaboration with the Governor's Vertical Infrastructure Advisory Committee, including the Department of Administrative Services; the Department of Commerce, Alcoholic Beverages Division; the Department of Corrections; the Department of Cultural Affairs; the Department of Education, including Iowa Public Television and Iowa Vocational Rehabilitation Services; the Department of Human Services; Iowa Law Enforcement Academy; the Department of Public Safety; Terrace Hill; Iowa Veterans Home and Iowa Workforce Development. The advisory committee meets on a monthly basis to review the progress of the work and to make recommendations on procedures and priorities. Additional information on major maintenance projects is available in the advisory committee's Tenth Annual Report to the Governor, dated December 15, 2008.
Resumo:
The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The pmpose of the Watershed Improvement Fund is to enhance the water quality and flood prevention efforts in the state through a variety of impairment-based, locally directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2).
Resumo:
The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enlmnce the water quality and flood prevention efforts in the state through a variety of impairment-based, locally directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest eamed on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.
Resumo:
The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.
Resumo:
The Watershed Improvement Fund and the Watershed Improvement Review Board (WIRB) were created in 2005. This statute is now codified in Iowa Code Chapter 466A. The purpose of the Watershed Improvement Fund is to enhance the water quality in the state through a variety of impairment-based, locally-directed watershed improvement projects. These projects are awarded grants through a competitive application process directed by the WIRB. Appropriations to the Fund do not revert except for the Capital Revenue Bonds II (RCB2) appropriation. Interest earned on the moneys on the Fund are also retained in the Fund and are used to fund projects or pay per diem and expenses of the WIRB members. Starting July 1, 2012, the Fund is also receiving Animal Agriculture Compliance Fund Penalties. In state fiscal years 2009 (SFY2009) and 2010 (SFY2010), the Watershed Improvement Fund was appropriated $5,000,000 from the Rebuild Iowa Infrastructure Fund (RIIF). In SFY2011, the Watershed Improvement Fund was appropriated $2,000,000 from the Revenue Bonds Capitals II Fund (RBC2). No appropriation was received in fiscal year 2012. In SFY 2013, the Watershed Improvement Fund was appropriated $1,000,000 from the RIIF.
Resumo:
Many state, county, and local agencies are faced with deteriorating bridge infrastructure composed of a large percentage of relatively short to medium span bridges. In many cases, these older structures are rolled or welded longitudinal steel stringers acting compositely with a reinforced concrete deck. Most of these bridges, although still in service, need some level of strengthening due to increases in legal live loads or loss of capacity due to deterioration. Although these bridges are overstressed in most instances, they do not warrant replacement; thus, structurally efficient but cost-effective means of strengthening needs to be employed. In the past, the use of bolted steel cover plates or angles was a common retrofit option for strengthening such bridges. However, the time and labor involved to attach such a strengthening system can sometimes be prohibitive. This project was funded through the Federal Highway Administration’s Innovative Bridge Research and Construction program. The goal is to retrofit an existing structurally deficient, three-span continuous steel stringer bridge using an innovative technique that involves the application of post-tensioning forces; the post-tensioning forces were applied using fiber reinforced polymer post-tensioning bars. When compared to other strengthening methods, the use of carbon fiber reinforced polymer composite materials is very appealing in that they are highly resistant to corrosion, have a low weight, and have a high tensile strength. Before the post-tensioning system was installed, a diagnostic load test was conducted on the subject bridge to establish a baseline behavior of the unstrengthened bridge. During the process of installing the post-tensioning hardware and stressing the system, both the bridge and the post-tensioning system were monitored. The installation of the hardware was followed by a follow-up diagnostic load test to assess the effectiveness of the post-tensioning strengthening system. Additional load tests were performed over a period of two years to identify any changes in the strengthening system with time. Laboratory testing of several typical carbon fiber reinforced polymer bar specimens was also conducted to more thoroughly understand their behavior. This report documents the design, installation, and field testing of the strengthening system and bridge.
Resumo:
This research project was intended to produce a strategy for addressing current and future access management problems on state highway routes located just outside urban areas that serve as major routes for commuting into and out of major employment centers in Iowa. There were two basic goals: (1) to develop a ranking system for identifying high-priority segments for access management treatments on primary highways outside metro and urban areas and (2) to focus efforts on routes that are major commuting routes at present and in the future. The project focused on four-lane expressways and two-lane arterials most likely to serve extensive commuter traffic. Available spatial and statistical data were used to identify existing and possible future problem corridors with respect to access management. The research team developed a scheme for ranking commuter routes based on their need for attention to access management. This project was able to produce rankings for corridors based on a variety of factors, including proportion of crashes that appear to be access-related, severity of those crashes, and potential for improvement along corridors. Frequency and loss were found to be highly rank correlated; because of this, these indicators were not used together in developing final priority rankings. Most of the highest ranked routes are on two-lane rural cross sections, but a few are four-lane expressways with at-grade private driveways and public road intersections. The most important conclusion of the ranking system is that many of the poor-performing corridors are located in a single Iowa Department of Transportation district near two urban areas--Des Moines and Ames. A comprehensive approach to managing access along commuting corridors should be developed first in this district since the potential benefits would be highest in that region.
Resumo:
The City of Marquette lies in the 65,000 acre Mississippi River watershed, and is surrounded by steep bluffs. Though scenic, controlling water runoff during storm events presents significant challenges. Flash-flooding from the local watershed has plagued the city for decades. The people of Marquette have committed to preserve the water quality of key natural resources in the area including the Bloody Run Creek and associated wetlands by undertaking projects to control the spread of debris and sediment caused by excess runoff during area storm events. Following a July 2007 storm (over 8” of rain in 24 hours) which caused unprecedented flood damage, the City retained an engineering firm to study the area and provide recommendations to eliminate or greatly reduce uncontrolled runoff into the Bloody Run Creek wetland, infrastructure damage and personal property loss. Marquette has received Iowa Great Places designation, and has demonstrated its commitment to wetland preservation with the construction of Phase I of this water quality project. The Bench Area Storm Water Management Plan prepared by the City in 2008 made a number of recommendations to mitigate flash flooding by improving storm water conveyance paths, detention, and infrastructure within the Bench area. Due to steep slopes and rocky geography, infiltration based systems, though desirable, would not be an option over surface based systems. Runoff from the 240 acre watershed comes primarily from large, steep drainage areas to the south and west, flowing to the Bench area down three hillside routes; designated as South East, South Central and South West. Completion of Phase I, which included an increased storage capacity of the upper pond, addressed the South East and South Central areas. The increased upper pond capacity will now allow Phase II to proceed. Phase II will address runoff from the South West drainage area; which engineers have estimated to produce as much water volume as the South Central and South East areas combined. Total costs for Phase I are $1.45 million, of which Marquette has invested $775,000, and IJOBS funding contributed $677,000. Phase II costs are estimated at $617,000. WIRB funding support of $200,000 would expedite project completion, lessen the long term debt impact to the community and aid in the preservation of the Bloody Run Creek and adjoining wetlands more quickly than Marquette could accomplish on its own.
Resumo:
This is the Iowa Department of Transportation's summary of project status for infrastructure projects that have been appropriated revenue from various funds including Rebuild Iowa Infrastructure, Health Restricted Capitals, Revenue Bonds Capitals and Revenue Bonds Capitals II.
Resumo:
This is the annual appropriations report submitted on behalf of the Watershed Improvement Review Board (WIRB).