66 resultados para educational projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A compilation of sample pages from various employment statistical reports issued by Iowa Workforce Development (IWD), including URLs for locating electronic versions of the reports online at the IWD website

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa Code section 70A.25(3)(b) states the department shall report the direct and indirect costs of educational leave and educational assistance granted to its employees during the preceding fiscal year. The report shall include the number of employees granted educational leave and the amount of tuition reimbursement allowed; the number of employees granted leave from work to attend classes and who continued to receive their salary and the number of hours of work which those employees were excused; and the number of employees granted a temporary leave of absence from work to attend the classes without pay and the amount of time missed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

River Action is requesting funds for a project that offers design, technical and financial assistance to residential and commercial landowners and municipalities for the installation of buffers along Duck Creek and its tributaries. The buffers will improve water quality, reduce erosion on stream banks and provide habitat for wildlife. The projects will be planned and implemented through public meetings and educational workshops. This method of community involvement will increase awareness and education concerning the impairments in Duck Creek in Davenport and Bettendorf in Scott County, Iowa and promote personal responsibility and stewardship of watersheds.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Office of Treasurer of State, Iowa Educational Savings Plan Trust for the year ended June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual directory of PreK-12, area education agencies, universities, colleges, and the Iowa Department of Education

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In work-zone configurations where lane drops are present, merging of traffic at the taper presents an operational concern. In addition, as flow through the work zone is reduced, the relative traffic safety of the work zone is also reduced. Improving work-zone flow-through merge points depends on the behavior of individual drivers. By better understanding driver behavior, traffic control plans, work zone policies, and countermeasures can be better targeted to reinforce desirable lane closure merging behavior, leading to both improved safety and work-zone capacity. The researchers collected data for two work-zone scenarios that included lane drops with one scenario on the Interstate and the other on an urban arterial roadway. The researchers then modeled and calibrated these scenarios in VISSIM using real-world speeds, travel times, queue lengths, and merging behaviors (percentage of vehicles merging upstream and near the merge point). Once built and calibrated, the researchers modeled strategies for various countermeasures in the two work zones. The models were then used to test and evaluate how various merging strategies affect safety and operations at the merge areas in these two work zones.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere. The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes. The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Office of Treasurer of State, Iowa Educational Savings Plan Trust (Trust) for the year ended June 30, 2015

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The pathways for academic career and employment program (PACE) is established to provide funding to community colleges for the development of projects that will lead to gainful, quality, in-state employment for members of target populations by providing them with both effective academic and employment training to ensure gainful employment and customized support services.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Department of Education, Division of Community Colleges, will annually provide the State Board of Education with the Workforce Training and Economic Development Fund Annual Progress Report. Administration and oversight responsibility for the fund was transferred from the Iowa Economic Development Authority to the Iowa Department of Education effective July 1, 2013 (FY 2014). This report is the first annual progress report produced and distributed by the Iowa Department of Education. The full report outlines the programs, projects, and initiatives that the community colleges have implemented during the past fiscal year.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dry Run Creek Watershed was designated an impaired waterbody by DNR in 2002, following an assessment of the biota in the stream by DNR Biologist, Tom Wilton. Subsequent studies by IOWATER Snapshot effort in 2003, found e-coli bacteria concentrations and high nitrate readings in excess of the State of Iowa limits for recreational streams. The Dry Run Creek Watershed Improvement Project is comprised of five major components. Three components will feature demonstrations of structural best management practices (BMPs) to protect water quality in Dry Run Creek. The fourth is an educational workshop to "kick-off" the initiative and background the stakeholders of the watershed in new stormwater management strategies for water quality protection. The fifth is a monitoring program that will provide data on the effectiveness of the practices to be demonstrated. Measurable outcomes from these projects include monitoring to document the effectiveness of infiltration­ based BMPs to reduce pollutant loading in urban stormwater runoff and reducing the volume of stormwater discharged directly into Dry Run Creek via storm sewer flows. Understanding of and social acceptance of new stormwater strategies and practices will also be monitored by surveys of watershed stakeholders and compared to findings of a survey done before the start of the project.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Managing existing and newly constructed highway corridors has recently become a significant concern in many states, including Iowa. As urban land and land on the urban fringe develops, there is pressure to add features such as commercial driveways, at-grade public road intersections, and traffic signals to arterial highway routes that should primarily serve high-speed traffic. This diminishes the speed and traffic capacity of such roadways and can also cause significant safety issues. if mobility and safety are diminished, the value of the highway investment is diminished. Since a major highway corridor improvement may cost tens of millions of dollars or more, corridor management is as critical to preserving that investment as is more "hard side" management practices such as pavement or bridge management. Corridor management is a process that applies access management principles to highway corridors in an attempt to balance the competing needs of traffic service, safety, and support for land development. This project helped to identify routes that should be given high priority for corridor management. The pilot study in the form of two corridor management case studies provides an analytical process that can be replicated along the other Iowa commuting corridors using commonly available transportation and land use data resources. It also offers a general set of guidelines for the Iowa Department of Transportation to use in the development of its own comprehensive corridor management program.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Summary of Applications that are awarded projects through the state of Iowa. Produced by Agriculture and Land Stewardship.