64 resultados para cost-effective
Resumo:
Due to the low workability of slipform concrete mixtures, the science of rheology is not strictly applicable for such concrete. However, the concept of rheological behavior may still be considered useful. A novel workability test method (Vibrating Kelly Ball or VKelly test) that would quantitatively assess the responsiveness of a dry concrete mixture to vibration, as is desired of a mixture suitable for slipform paving, was developed and evaluated. The objectives of this test method are for it to be cost-effective, portable, and repeatable while reporting the suitability of a mixture for use in slipform paving. The work to evaluate and refine the test was conducted in three phases: 1. Assess whether the VKelly test can signal variations in laboratory mixtures with a range of materials and proportions 2. Run the VKelly test in the field at a number of construction sites 3. Validate the VKelly test results using the Box Test developed at Oklahoma State University for slipform paving concrete The data collected to date indicate that the VKelly test appears to be suitable for assessing a mixture’s response to vibration (workability) with a low multiple operator variability. A unique parameter, VKelly Index, is introduced and defined that seems to indicate that a mixture is suitable for slipform paving when it falls in the range of 0.8 to 1.2 in./√s.
Resumo:
This report summarizes the analysis of transverse cracking in asphalt pavement by a five state study team from Iowa, Kansas, Nebraska, North Dakota, and Oklahoma. The study was initiated under the sponsorship of the Federal Highway Administration and four evaluation conferences were held during the course of the study. Each state conducted a crack inventory on their asphalt pavement. An effort was made to correlate this inventory with numerous factors that were considered to be pertinent to the cracking problem. One state did indicate that there was a correlation between transverse cracking severity and the subsurface geology. The other states were unable to identify any significant factors as being the primary contributors. The analysis of the problem was divided into, (1) mix design, (2) maintenance, and (3) 3R rehabilitation. Many potential factors to be considered were identified under each of these three study divisions. There were many conclusions as to good and bad practices. One major conclusions was that a more effective crack maintenance program with early sealing was essential. Some new practices were suggested as potentially more cost effective in design, construction and maintenance. The interchange of methods and procedures by individual states yielded benefits in that other states selected practices that would be an improvement to their program.
Resumo:
The road paving cost continues to increase and the backlog of projects waiting for funding is growing. Finding a more cost-effective way to use the available money to pave roads will result in more miles of road being paved with the same amount of money. This project is in Cass County on G35 between US 71 and Norway-Center. It consists of a thin layer of asphalt over a base designed to achieve stability while having some permeability. This project was paved in 1996. An asphalt cement concrete pavement was chosen for the project based on cost, convenience, and historic portland cement concrete problems in Cass County. The new pavement gives quicker access time to farms and residences.
Resumo:
The 1982 cost of a two-inch asphaltic concrete overlay, with fabric, was an average of 85% of the cost of a three-inch overlay (see attached calculations). A structural number can be assigned to the extra inch of overlay, whereas it is doubtful that any number can be assigned to the fabric. The observations made on the projects in this report leave little reason to be optimistic on the use of fabrics under asphalt overlays. This is especially true of the Floyd, Dallas and Clarke county projects. A great amount of fabric is being used nationwide for this purpose, probably more from sales promotion than from actual documented performance. Full scale field testing is continuing each time a project is let utilizing fabric reinforcement under asphaltic concrete overlays. It has already become apparent that the use of fabrics in AC overlays is not always cost effective.
Resumo:
As streets age, officials must deal with rehabilitating and reconstructing these pavements to maintain a safe and comfortable ride. In light of nationwide budget shortfalls, cost-effective methods of extending pavement service life must be developed or the overall condition of street systems will continue to fall. Thin maintenance surfaces (TMSs) are a set of cost-effective preventive maintenance surfacing techniques that can be used to extend the life of bituminous pavement—pavement built with hot mix asphalt, hot mix asphalt overlays of portland cement concrete pavements, built-up seal coat (chip seal), stabilized materials, or a combination of these. While previous phases of TMS research have provided information about the uses of thin maintenance surfaces in rural settings, urban areas have different road maintenance challenges that should be considered separately. This research provides city street officials with suggestions for TMS techniques that street departments can easily test and include into their current programs. This research project facilitated the construction of TMS test sections in Cedar Rapids, Council Bluffs, and West Des Moines (all urban settings in Iowa). Test section sites and surfaces were selected to suit the needs of municipalities and were applied to roads with an array of various distresses and maintenance needs. Condition surveys of each test section were performed before construction, after construction, and after the first winter to record the amount and severity of existing distress and calculate the pavement condition index. Because conditions of the test sections varied greatly, determining which surface was most successful by comparing case studies was not feasible. However, some general conclusions can be made from this research. TMSs are suitable preventive maintenance techniques for a municipal street department’s program for preserving existing pavements. Careful attention should be paid to proper planning, quality control during construction, aggregate and binder selection, and aggregate embedment in order to support successful TMS application.
Resumo:
A good system of preventive bridge maintenance enhances the ability of engineers to manage and monitor bridge conditions, and take proper action at the right time. Traditionally infrastructure inspection is performed via infrequent periodical visual inspection in the field. Wireless sensor technology provides an alternative cost-effective approach for constant monitoring of infrastructures. Scientific data-acquisition systems make reliable structural measurements, even in inaccessible and harsh environments by using wireless sensors. With advances in sensor technology and availability of low cost integrated circuits, a wireless monitoring sensor network has been considered to be the new generation technology for structural health monitoring. The main goal of this project was to implement a wireless sensor network for monitoring the behavior and integrity of highway bridges. At the core of the system is a low-cost, low power wireless strain sensor node whose hardware design is optimized for structural monitoring applications. The key components of the systems are the control unit, sensors, software and communication capability. The extensive information developed for each of these areas has been used to design the system. The performance and reliability of the proposed wireless monitoring system is validated on a 34 feet span composite beam in slab bridge in Black Hawk County, Iowa. The micro strain data is successfully extracted from output-only response collected by the wireless monitoring system. The energy efficiency of the system was investigated to estimate the battery lifetime of the wireless sensor nodes. This report also documents system design, the method used for data acquisition, and system validation and field testing. Recommendations on further implementation of wireless sensor networks for long term monitoring are provided.
Resumo:
For several years, the Iowa Department of Transportation has constructed bypasses along rural highways. Most bypasses were constructed on the state’s Commercial Industrial Network (CIN). Now that work on the CIN has been completed and the system is open to traffic, it is possible to study the impacts of bypasses. In the past, construction of highway bypasses has led community residents and business people to raise concerns about the loss of business activity. For policy development purposes, it is essential to understand the impacts that a bypass might have on safety, the community, and economics. By researching these impacts, policies can be produced to help to alleviate any negative impacts and create a better system that is ultimately more cost-effective. This study found that the use of trade area analysis does not provide proof that a bypass can positively or negatively impact the economy of a rural community. The analysis did show that, even though the population of a community may be stable for several years and per capita income is increasing, sales leakage still occurs. The literature, site visits, and data make it is apparent that a bypass can positively affect a community. Some conditions that would need to exist in order to maximize a positive impact include the installation of signage along the bypass directing travelers to businesses and services in the community, community or regional plans that include the bypass in future land development scenarios, and businesses adjusting their business plans to attract bypass users. In addition, how proactive a community is in adapting to the bypass will determine the kinds of effects felt in the community. Results of statistical safety analysis indicate that, at least when crashes are separated by severity, bypasses with at-grade accesses appear to perform more poorly than either the bypasses with fully separated accesses or with a mix of at-grade and fully separated accesses. However, the benefit in terms of improved safety of bypasses with fully separated accesses relative to bypasses with a mixed type of accesses is not statistically conclusive.
Resumo:
Many state, county, and local agencies are faced with deteriorating bridge infrastructure composed of a large percentage of relatively short to medium span bridges. In many cases, these older structures are rolled or welded longitudinal steel stringers acting compositely with a reinforced concrete deck. Most of these bridges, although still in service, need some level of strengthening due to increases in legal live loads or loss of capacity due to deterioration. Although these bridges are overstressed in most instances, they do not warrant replacement; thus, structurally efficient but cost-effective means of strengthening needs to be employed. In the past, the use of bolted steel cover plates or angles was a common retrofit option for strengthening such bridges. However, the time and labor involved to attach such a strengthening system can sometimes be prohibitive. This project was funded through the Federal Highway Administration’s Innovative Bridge Research and Construction program. The goal is to retrofit an existing structurally deficient, three-span continuous steel stringer bridge using an innovative technique that involves the application of post-tensioning forces; the post-tensioning forces were applied using fiber reinforced polymer post-tensioning bars. When compared to other strengthening methods, the use of carbon fiber reinforced polymer composite materials is very appealing in that they are highly resistant to corrosion, have a low weight, and have a high tensile strength. Before the post-tensioning system was installed, a diagnostic load test was conducted on the subject bridge to establish a baseline behavior of the unstrengthened bridge. During the process of installing the post-tensioning hardware and stressing the system, both the bridge and the post-tensioning system were monitored. The installation of the hardware was followed by a follow-up diagnostic load test to assess the effectiveness of the post-tensioning strengthening system. Additional load tests were performed over a period of two years to identify any changes in the strengthening system with time. Laboratory testing of several typical carbon fiber reinforced polymer bar specimens was also conducted to more thoroughly understand their behavior. This report documents the design, installation, and field testing of the strengthening system and bridge.
Resumo:
The Rathbun Land and Water Alliance and partners have undertaken a highly effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This application proposes to assist landowners to construct five large sediment retention basins that will reduce sediment and phosphorus delivery from priority land in targeted sub-watersheds. The Alliance, with previous WIRB support, demonstrated that construction of these basins at strategically selected sites is one of the most cost effective measures to reduce sediment and phosphorus delivery to Rathbun Lake. Features of this project are: (1) use of geographic information system (GIS) analysis to identify potential basin sites; (2) assistance for landowners to construct 5 basins that will reduce the annual delivery of sediment by 1,500 tons and phosphorus by 5,000 pounds; (3) evaluation of the benefits from basin construction using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs including sediment retention basins to protect water quality.
Resumo:
Clear Lake, Iowa's third largest natural lake, is a premier natural resource and popular recreational destination in north central Iowa. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. Local communities have been working towards the goal of making improvements at all 30 storm water outlets that have a drainage area of five acres or more and have a cost effective solution. Many improvements have already been made, and now there are only seven storm water outlet sites remaining that still need protection in order to meet the goal. The storm water improvements have been very effective in reducing contaminants in urban runoff, achieving reduction levels in the 50-80% range. The proposed Clear Lake Storm Water Improvement Project will address the remaining seven outlet sites and take place over three years. The first year will consist of performing engineering and design of storm water best management practices (BMPs) at the seven outlet sites to determine if a cost effective solution exists for each. Years two and three will consist of installing two storm water improvements each year to implement the most cost effective BMPs at a minimum of four of the seven sites. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.
Resumo:
Global positioning systems (GPS) offer a cost-effective and efficient method to input and update transportation data. The spatial location of objects provided by GPS is easily integrated into geographic information systems (GIS). The storage, manipulation, and analysis of spatial data are also relatively simple in a GIS. However, many data storage and reporting methods at transportation agencies rely on linear referencing methods (LRMs); consequently, GPS data must be able to link with linear referencing. Unfortunately, the two systems are fundamentally incompatible in the way data are collected, integrated, and manipulated. In order for the spatial data collected using GPS to be integrated into a linear referencing system or shared among LRMs, a number of issues need to be addressed. This report documents and evaluates several of those issues and offers recommendations. In order to evaluate the issues associated with integrating GPS data with a LRM, a pilot study was created. To perform the pilot study, point features, a linear datum, and a spatial representation of a LRM were created for six test roadway segments that were located within the boundaries of the pilot study conducted by the Iowa Department of Transportation linear referencing system project team. Various issues in integrating point features with a LRM or between LRMs are discussed and recommendations provided. The accuracy of the GPS is discussed, including issues such as point features mapping to the wrong segment. Another topic is the loss of spatial information that occurs when a three-dimensional or two-dimensional spatial point feature is converted to a one-dimensional representation on a LRM. Recommendations such as storing point features as spatial objects if necessary or preserving information such as coordinates and elevation are suggested. The lack of spatial accuracy characteristic of most cartography, on which LRM are often based, is another topic discussed. The associated issues include linear and horizontal offset error. The final topic discussed is some of the issues in transferring point feature data between LRMs.
Resumo:
Controlling and managing manure-contaminated runoff is a responsibility of every livestock producer. The minimum requirement of all confined feeding operations in Iowa, regardless of size, is to settle solids. Two separate watershed assessments conducted in 2003-2004 by the Lyon SWCD of 141 feedlot sites indicated only 29% have solid settling basins in place. Regulating agencies generally recommend a holding pond followed by irrigation land application which require large capital investments, specialized machinery and additional management skill sets. Producers are looking for more cost-effective alternatives for controlling feedlot runoff and regulating agencies need to know these alternatives will protect the environment.
Resumo:
The goal of this project is to help residents of the Hewitt Creek watershed identify themselves as a watershed community and use cost-effective approaches to control non-point source nutrient and sediment contaminants according to collective science-based environmental goals. The project will tap the low-cost, high-return human resources of local knowledge and resident leadership for economical and sustainable solutions. A watershed council will implement an incentive program to engage their watershed community in locally-acceptable practices and performance (outcome) measures for environmental stewardship that have reasonable cost and are linked with accountable crop and livestock management decisions. The Iowa and Dubuque County Farm Bureau have supported one year of management practice incentives. The performance incentive program will take this effort to the next level, to focus on outcomes.
Resumo:
This project proposes a unique approach to addressing one of the more challenging issues facing efforts to protect water quality in Rathbun Lake; reducing sediment and phosphorus delivery from land on which best management practices (BMPs) will not be applied. This project will construct ten impoundments at key locations in the watershed to reduce the annual delivery of 2,970 tons of sediment and 12,100 pounds of phosphorus to Rathbun Lake. Features of this approach are: (a) impoundments will be constructed at sites below areas with high concentrations of priority land that has the greatest potential to deliver sediment and phosphorus to Rathbun Lake and on which landowners are unable or unwilling to apply BMPs and (b) strategically placed, large impoundments can be a cost effective means of reducing the sediment and phosphorus delivered to Rathbun Lake from priority land on which BMPs will not be applied. This project will significantly enhance the success of efforts underway in the Rathbun Lake Special Project as it addresses a critical water quality protection need that is not being met by current Special Project activities.
Resumo:
Clear Lake, Iowa's third largest natural lake, is located in Cerro Gordo County in north-central Iowa. The lake is a premier natural resource and popular recreational destination in north central Iowa, providing more than $40 million dollars annually to the local economy. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full recreational potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. There are over 68 storm water outlet points in the Clear Lake watershed that allow untreated urban runoff to empty directly into Clear Lake. Local governments have been very active in installing storm water Best Management Practices (BMPs) at as many of the outlets that current funding allows. To date, 11 of the 68 sites (16%) have been protected. These improvements have been very effective in reducing contaminants in the storm water runoff, but the remaining outlets still need protection. The first phase of this grant request is for an investigation of 10 storm water outlet sites to determine the most cost effective BMP for each site. The second phase of the grant request is to implement the BMPs deemed most cost effective at 5 of the 10 sites investigated. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.