123 resultados para consultation service
Resumo:
In June 2009, the Iowa Department of Human Service (IDHS) developed a Child and Family Service Plan (CFSP) that sets forth the Department’s vision and goals to be accomplished for FYs 2010 through 2014. The purpose of the CFSP is to strengthen the States’ overall child welfare system and to facilitate the state’s integration of the programs that serve children and families into a comprehensive and continuum array of child welfare services from prevention and protection through permanency. These programs include title IV-B, subparts 1 and 2 of the Act, the Child Abuse Prevention and Treatment Act (CAPTA), the Chafee Foster Care Independence Program (CFCIP), and the Education and Training Vouchers (ETV) programs for older and/or former foster care youth. IDHS administers the IV-B, CAPTA, CFCIP and the ETV programs described within Iowa’s CFSP. Iowa’s Annual Progress and Services Report (APSR) provides an annual update on the progress made toward accomplishing the goals and objectives identified in the state’s CFSP for the previous fiscal year (2009-2010) and the planned activities for next fiscal year (2010-2011) .
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2011
Resumo:
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2011
Resumo:
Agreed upon procedures report on the six Library Service Areas in the State of Iowa for the period July 1, 2010 through June 30, 2011
Resumo:
Since the introduction of expanded levels of intrastate service on October 30, 2006, Amtrak trains in Illinois have produced impressive gains in both ridership and ticket revenue. This success and continuing stakeholder support has given rise to a formal request from the Illinois Department of Transportation (“Ill. DOT”) to Amtrak to develop a feasibility study regarding possible service consisting of a morning and an evening train in each direction between Chicago and the Quad Cities. The area between Chicago and the Quad Cities includes many rapidly growing communities. From Chicago toward the West and South, many towns and cities have experienced double digit growth increases in population since the year 2000. Southern DuPage, Cook and Will counties have seen especially strong growth, pressuring highway infrastructure, utilities, and schools. Community development and highway congestion are readily apparent when traveling the nearly 3 hour, 175 mile route between Chicago and the Quad Cities. As information, there are only three weekday round trip bus frequencies available between Chicago and the Quad Cities. The Quad City International Airport offers a total of 10 daily scheduled round trip flights to Chicago's O'Hare International Airport via two separate carriers flying regional jets. The Quad Cities (Davenport, Moline, Rock Island, and Bettendorf) are located along the Mississippi River. Nearly 60% of its visitors are from the Chicago area. With dozens of miles of scenic riverfront, river boating, casinos, and thousands of acres of expansive public spaces, the Quad Cities area is a major draw from both Iowa and Illinois. The huge Rock Island Arsenal, one of the largest military arsenals in the country and located along the river, is transitioning to become the headquarters of the United States First Army. As will be discussed later in the report, there is only one logical rail route through the Quad Cities themselves. The Iowa Interstate Railroad operates through the Quad Cities along the river and heads west through Iowa. The Quad Cities are considering at least three potential locations for an Amtrak station. A study now underway supported by several local stakeholders will recommend a site which will then be considered, given available local and other financial support. If Amtrak service were to terminate in the Quad Cities, an overnight storage track of sufficient length along with ample parking and certain other requirements covered elsewhere in the report would be required.
Resumo:
Soon after the Illinois Department of Transportation (“Ill. DOT”) requested Amtrak to conduct a feasibility study on proposed Amtrak service between Chicago and the Illinois Quad Cities, the Iowa Department of Transportation (“Iowa DOT”) asked that the study be extended to Iowa City and later to Des Moines. This report examines the feasibility of extending service to Iowa City. The completed report for the proposed Chicago – Quad Cities’ service was delivered to Ill. DOT in early January 2008. It assumes a stand-alone train operation strictly within the State of Illinois and makes no reference to extending the service into the State of Iowa. Therefore, there is no discussion about potential cost sharing allocations for capital improvements or operating losses between the two states which will become a matter of future negotiations between the two jurisdictions. That being said, this report on extending the service to Iowa City is simply an addendum to the Quad Cities report and covers such topics as additional capital infrastructure improvements that would be required in Iowa, impacts on operating expenses, revised ridership and revenue projections, and the like. With one minor exception, the recommended level of capital improvements within Illinois will still be required if the service to Iowa City is initiated. It is thus important for the readers of this report to refer to the Illinois study for detailed information on that state’s portion of the route alternatives.
Resumo:
Audit report on the Regional Utility Service Systems Commission for the year ended June 30, 2011
Resumo:
Iowa railroad service map of Iowa trains in color.
Resumo:
This report provides the status of the Passenger Rail Service Revolving Fund and the development and operation of the midwest regional rail system and the state's passenger rail service.
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2012
Resumo:
Audit report on the South Central Iowa Regional E-911 Service Board for the year ended June 30, 2012
Resumo:
Audit report on the Regional Utility Service Systems Commission for the year ended June 30, 2012
Resumo:
Audit report on the Appanoose County Service Agency in Centerville, Iowa for the year ended June 30, 2012
Resumo:
The bearing capacity and service life of a pavement is affected adversely by the presence of undrained water in the pavement layers. In cold winter climates like in Iowa, this problem is magnified further by the risk of frost damage when water is present. Therefore, well-performing subsurface drainage systems form an important aspect of pavement design by the Iowa Department of Transportation (DOT). However, controversial findings are also reported in the literature regarding the benefits of subsurface drainage. The goal of this research was not to investigate whether subdrains are needed in Iowa pavements, but to conduct an extensive performance review of primary interstate pavement subdrains in Iowa, determine the cause of the problem if there are drains that are not functioning properly, and investigate the effect of poor subdrain performance due to improper design, construction, and maintenance on pavement surface distresses, if any. An extensive literature review was performed covering national-level and state-level research studies mainly focusing on the effects of subsurface drainage on performance of asphalt and concrete pavements. Several studies concerning the effects of a recycled portland cement concrete (RPCC) subbase on PCC pavement drainage systems were also reviewed. A detailed forensic test plan was developed in consultation with the project technical advisory committee (TAC) for inspecting and evaluating the Iowa pavement subdrains. Field investigations were conducted on 64 selected (jointed plain concrete pavement/JPCP and hot-mix asphalt/HMA) pavement sites during the fall season of 2012 and were mainly focused on the drainage outlet conditions. Statistical analysis was conducted on the compiled data from field investigations to further investigate the effect of drainage on pavement performance. Most Iowa subsurface drainage system outlet blockage is due to tufa, sediment, and soil. Although higher blockage rates reduce the flow rate of water inside outlet pipes, it does not always stop water flowing from inside the outlet pipe to outside the outlet pipe unless the outlet is completely blocked. Few pavement surface distresses were observed near blocked subsurface drainage outlet spots. More shoulder distresses (shoulder drop or cracking) were observed near blocked drainage outlet spots compared to open ones. Both field observations and limited performance analysis indicate that drainage outlet conditions do not have a significant effect on pavement performance. The use of RPCC subbase in PCC pavements results in tufa formation, a primary cause of drainage outlet blockage in JPCP. Several useful recommendations to potentially improve Iowa subdrain performance, which warrant detailed field investigations, were made
Resumo:
The bearing capacity and service life of a pavement is affected adversely by the presence of undrained water in the pavement layers. In cold winter climates like in Iowa, this problem is magnified further by the risk of frost damage when water is present. Therefore, well-performing subsurface drainage systems form an important aspect of pavement design by the Iowa Department of Transportation (DOT). However, controversial findings are also reported in the literature regarding the benefits of subsurface drainage. The goal of this research was not to investigate whether subdrains are needed in Iowa pavements, but to conduct an extensive performance review of primary interstate pavement subdrains in Iowa, determine the cause of the problem if there are drains that are not functioning properly, and investigate the effect of poor subdrain performance due to improper design, construction, and maintenance on pavement surface distresses, if any. An extensive literature review was performed covering national-level and state-level research studies mainly focusing on the effects of subsurface drainage on performance of asphalt and concrete pavements. Several studies concerning the effects of a recycled portland cement concrete (RPCC) subbase on PCC pavement drainage systems were also reviewed. A detailed forensic test plan was developed in consultation with the project technical advisory committee (TAC) for inspecting and evaluating the Iowa pavement subdrains. Field investigations were conducted on 64 selected (jointed plain concrete pavement/JPCP and hot-mix asphalt/HMA) pavement sites during the fall season of 2012 and were mainly focused on the drainage outlet conditions. Statistical analysis was conducted on the compiled data from field investigations to further investigate the effect of drainage on pavement performance. Most Iowa subsurface drainage system outlet blockage is due to tufa, sediment, and soil. Although higher blockage rates reduce the flow rate of water inside outlet pipes, it does not always stop water flowing from inside the outlet pipe to outside the outlet pipe unless the outlet is completely blocked. Few pavement surface distresses were observed near blocked subsurface drainage outlet spots. More shoulder distresses (shoulder drop or cracking) were observed near blocked drainage outlet spots compared to open ones. Both field observations and limited performance analysis indicate that drainage outlet conditions do not have a significant effect on pavement performance. The use of RPCC subbase in PCC pavements results in tufa formation, a primary cause of drainage outlet blockage in JPCP. Several useful recommendations to potentially improve Iowa subdrain performance, which warrant detailed field investigations, were made.
Resumo:
The Iowa Department of Corrections (DOC) and the Department of Human Rights, Division of Criminal and Juvenile Justice Planning (CJJP) entered into a contract for services from September 12, 2007 to June 30, 2009 for the purposes of assisting in the evaluation component for the two-year Iowa Prisoner Re-Entry Initiative (PRI) Rural Service Delivery Model. This contract was extended to November 2009. The Rural PRI grant period ran from July 1, 2007 to June 30, 2009 and was extended to November 30, 2009. The purpose of the program was to improve community safety by providing pre-release services and successful transition planning and aftercare services to offenders released from state institutions to the Second Judicial District Department of Correctional Services. Participants included all offenders released to the Second Judicial District during the grant period.
Resumo:
This map shows operational and abandoned service rail lines in Iowa.