124 resultados para arterial road
Resumo:
In the November 2011 report issued by the Governor’s Transportation 2020 Citizen Advisory Commission (CAC), the commission recommended the Iowa Department of Transportation (DOT), at least annually, convene meetings with the cities and counties to review the operation, maintenance and improvement of Iowa’s public roadway system to identify ways to jointly increase efficiency. In response to this recommendation, Gov. Branstad directed the Iowa DOT to begin this effort immediately with a target of identifying $50 million of efficiency savings that can be captured from the $1.2 billion of Road Use Tax Funds (RUTF) provided to the Iowa DOT, cities and counties to administer, maintain and improve the public roadway system. This would build upon past joint and individual actions that have reduced administrative costs and resulted in increased funding for system improvements. Efficiency actions should be quantified, measured and reported to the public on a regular basis. Beyond the discussion of identifying funding solutions to our road and bridge needs, it is critical that all jurisdictions that own, maintain and improve the nation’s road and bridge systems demonstrate to the public these funds are utilized in the most efficient and effective manner. This requires continual innovation in all aspects of transportation planning, design, construction and maintenance - done in a transparent manner to clearly demonstrate to the public how their funds are being utilized. The Iowa DOT has identified 13 efficiency measures separated into two distinct categories – Program Efficiencies and Partnership Efficiencies. The total value of the efficiency measures is $50 million. Many of the efficiency items will need input, refinement and partnership from cities, counties, other local jurisdictions, and stakeholder interest groups. The Iowa DOT has begun meetings with many of these groups to help identify potential efficiency measures and strategies for moving forward. These partnerships and discussions will continue through implementation of the efficiency measures. Dependent on the measures identified, additional action may be required by the legislature, Iowa Transportation Commission, and/or other bodies to implement the action. In addition, a formal process will be developed to quantify, measure and report the results of actions taken on a regular basis.
Resumo:
The University of Iowa Office of the State Archaeologist (OSA) is delighted to welcome RAGBRAI riders to Iowa and we’re pleased to share a few details of our fascinating past as you ride across the state. We hope this booklet enhances your enjoyment and helps you learn something new each day of your ride, from the ancient site at Cherokee to the late 1800s lost town site of Bowen’s Prairie.
Resumo:
Describing promising technologies that can be used now to enhance concrete paving practices.
Resumo:
Describing promising technologies that can be used now to enhance concrete paving practices.
Resumo:
Describing promising technologies that can be used now to enhance concrete paving practices.
Resumo:
Describing promising technologies that can be used now to enhance concrete paving practices
Resumo:
The Iowa Department of Transportation (DOT) requested a road safety audit (RSA) of the US 59/IA 9 intersection in northwestern Iowa, just south of the Minnesota border, to assess intersection environmental issues and crash history and recommend appropriate mitigation to address the identified safety issues at the intersection. Although the number of crashes at the location has not been significantly higher than the statewide average for similar intersections, the severity of these crashes has been of concern. This RSA was unique in that it included intersection video observation and recorded traffic conflict data analysis, along with the daylight and nighttime field reviews. This report outlines the findings and recommendations of the RSA team for addressing the safety concerns at this intersection.
Resumo:
Develop, in conjunction with the regional planning affiliations and metropolitan planning organizations and other stakeholder groups, a process to exchange STP federal funds for Primary Highway System funds for the purpose of reducing the number of small projects that have to meet onerous federal requirements. In order to implement this recommendation, legislative action is required to eliminate the restriction on using Primary Road Fund revenue on local jurisdiction roadways in exchange for a portion of their federal STP funding. This past session, Iowa DOT worked with legislators to introduce a bill in both the House and the Senate to eliminate this Code restriction. Bills were discussed at the subcommittee level in both the House and Senate but did not proceed because of the need to have further discussions with impacted parties. Prior to next session, discussions will occur amongst all impacted parties to reach consensus on how this recommendation could be implemented. With that consensus in place prior to next session, it is anticipated that the bills can be reintroduced next session.
Resumo:
Senate File 2314, 84th General Assembly, states the Iowa Department of Transportation shall submit quarterly reports regarding the implementation of efficiency measures identified in the “Road Use Tax Fund Efficiency Report,” January 2012. This report shall provide details of activities undertaken in the previous quarter relating to one-time and long-term program efficiencies and partnership efficiencies. Issues covered include savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
Program from the dedication of Boyson Road to Iowa 101 on Interstate I-380.
Resumo:
Senate File 2314, 84th General Assembly, states the Iowa Department of Transportation shall submit quarterly reports regarding the implementation of efficiency measures identified in the "Road Use Tax Fund Efficiency Report," January 2012. This report shall provide details of activities undertaken in the previous quarter relating to one-time and long-term program efficiencies and partnership efficiencies. Issues covered include savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
In response to local concerns, the Iowa Department of Transportation (DOT) requested a road safety audit (RSA) for the IA Highway 28 corridor through the City of Norwalk in Warren County, Iowa, from the south corporate limits of Norwalk through the IA 5 interchange in Polk County, Iowa. The audit included meeting with City staff to discuss concerns, review crash history and operational issues, observe the route under daylight and nighttime conditions, and analyze available data. This report outlines the findings and recommendations of the audit team for addressing the safety concerns and operational matters along this corridor.
Resumo:
To date there have been few investigations of the substructures in low-volume road (LVR) bridges. Steel sheet piling has the potential to provide an economical alternative to concrete bridge abutments, but it needs investigation with regard to vertical and lateral load resistance, construction methods, and performance monitoring. The objectives of this project were to develop a design approach for sheet pile bridge abutments for short-span low-volume bridges, formulate an instrumentation and monitoring plan to evaluate performance of sheet pile abutment systems, and understand the cost and construction effort associated with building the sheet pile bridge abutment demonstration project. Three demonstration projects (Boone, Blackhawk, and Tama Counties) were selected for the design, construction, and monitoring of sheet pile abutments bridges. Each site was unique and required site-specific design and instrumentation monitoring. The key findings from this study include the following: (1) sheet pile abutment bridges provide an effective solution for LVR bridges, (2) the measured stresses and deflection were different from the assumed where the differences reflect conservatism in the design and the complex field conditions, and (3) additional research is needed to optimize the design.
Resumo:
Iowa has about 22,936 bridges on low-volume roads (LVRs). Based on the National Bridge Inventory data, 22 percent of the LVR bridges in Iowa are structurally deficient, while 5 percent of them are functionally obsolete. The substructure components (abutment and foundation elements) are known to be contributing factors for some of these poor ratings. Steel sheet piling was identified as a possible long-term option for LVR bridge substructures; but, due to lack of experience, Iowa needed investigation with regard to vertical and lateral load resistance, construction methods, design methodology, and load test performance. This project was initiated in January 2007 to investigate use of sheet pile abutments. *************Tech Transfer Summary. For full report see: http://publications.iowa.gov/id/eprint/14832*************
Resumo:
Senate File 2314, 84th General Assembly, states the Iowa Department of Transportation shall submit quarterly reports regarding the implementation of efficiency measures identified in the "Road Use Tax Fund Efficiency Report," January 2012. This report shall provide details of activities undertaken in the previous quarter relating to one-time and long-term program efficiencies and partnership efficiencies. Issues covered include savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.