181 resultados para Sentences (Criminal procedures)


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed upon procedures report on the City of Bevington, Iowa for the period July 1, 2008 through June 30, 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Letter to the Colo-Nesco Community School District as a result of reaudit procedures performed at the request of the Superintendent pursuant to Chapter 11.6(4)(a)(2) of the Code of Iowa for the period July 1, 2007 through June 30, 2008

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed upon procedures report on the City of Lohrville, Iowa for the period December 1, 2008 through October 31, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Black Hawk County Criminal Justice Information System for the year ended June 30, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed upon procedures report on the City of Lacona, Iowa for the period August 16, 2008 through August 31, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed upon procedures report of the Iowa Department of Human Services - IowaCare for the year ended June 30, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed upon procedures report on the City of Woolstock, Iowa for the period July 1, 2009 through June 30, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Black Hawk County Criminal Justice Information System for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed-upon procedures report on the Iowa State Center Business Office of Iowa State University of Science and Technology for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The main objective of this study was to evaluate the hydraulic performance of riprap spurs and weirs in controlling bank erosion at the Southern part of the Raccoon River upstream U.S. Highway 169 Bridge utilizing the commercially available model FESWMS and field monitoring. It was found based on a 2 year monitoring and numerical modeling that the design of structures was overall successful, including their spacing and stability. The riprap material incorporated into the structures was directly and favorably correlated to the flow transmission through the structure, or in other words, dictated the permeable nature of the structure. It was found that the permeable dikes and weirs chosen in this study created less volume of scour in the vicinity of the structure toes and thus have less risk comparatively to other impermeable structures to collapse. The fact that the structures permitted the transmission of flow through them it allowed fine sand particles to fill in the gaps of the rock interstices and thus cement and better stabilize the structures. During bank-full flows the maximum scour hole was recorded away from the structures toe and the scourhole size was directly related to the protrusion angle of the structure to the flow. It was concluded that the proposed structure inclination with respect to the main flow direction was appropriate since it provides maximum bank protection while creating the largest volume of local scour away from the structure and towards the center of the channel. Furthermore, the lowest potential for bank erosion also occurs with the present set-up design chosen by the IDOT. About 2 ft of new material was deposited in the area located between the structures for the period extending from the construction day to May 2007. Surveys obtained by sonar and the presence of vegetation indicate that new material has been added at the bank toes. Finally, the structures provided higher variability in bed topography forming resting pools, creating flow shade on the leeward side of the structure, and separation of bed substrate due to different flow conditions. Another notable environmental benefit to rock riprap weirs and dikes is the creation of resting pools, especially in year 2007 (2nd year of the project). The magnitude of these benefits to aquatic habitat has been found in the literature that is directly related to the induced scour-hole volume.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In response to the mandate on Load and Resistance Factor Design (LRFD) implementations by the Federal Highway Administration (FHWA) on all new bridge projects initiated after October 1, 2007, the Iowa Highway Research Board (IHRB) sponsored these research projects to develop regional LRFD recommendations. The LRFD development was performed using the Iowa Department of Transportation (DOT) Pile Load Test database (PILOT). To increase the data points for LRFD development, develop LRFD recommendations for dynamic methods, and validate the results of LRFD calibration, 10 full-scale field tests on the most commonly used steel H-piles (e.g., HP 10 x 42) were conducted throughout Iowa. Detailed in situ soil investigations were carried out, push-in pressure cells were installed, and laboratory soil tests were performed. Pile responses during driving, at the end of driving (EOD), and at re-strikes were monitored using the Pile Driving Analyzer (PDA), following with the CAse Pile Wave Analysis Program (CAPWAP) analysis. The hammer blow counts were recorded for Wave Equation Analysis Program (WEAP) and dynamic formulas. Static load tests (SLTs) were performed and the pile capacities were determined based on the Davisson’s criteria. The extensive experimental research studies generated important data for analytical and computational investigations. The SLT measured load displacements were compared with the simulated results obtained using a model of the TZPILE program and using the modified borehole shear test method. Two analytical pile setup quantification methods, in terms of soil properties, were developed and validated. A new calibration procedure was developed to incorporate pile setup into LRFD.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report on applying agreed-upon procedures to the Villisca Municipal Power Plant’s accounting procedures, cash and investment balances and compliance with Code of Iowa requirements for the period February 1, 2007 through December 31, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed upon procedures report on the Iowa Sheep and Wool Promotion Board for the period July 1, 2009 through June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed upon procedures report on the six Library Service Areas in the State of Iowa for the period July 1, 2010 through June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agreed upon procedures report on the Lee County Narcotics Task Force for the period July 1, 2010 through May 31, 2012