170 resultados para Safety, Construction management, Statistics


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Agency Performance Plan, Homeland Security and Emergency Management Division

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This document is intended to lay the foundation for resource reduction strategies in new construction, renovation and demolition. If you have an innovative idea or information that you believe should be included in future updates of this manual please email Shelly Codner at scodner@region12cog.org or Jan Loyson at Jan.Loyson@Iowalifechanging.com. Throughout this manual, we use the term “waste reduction” to define waste management initiatives that will result in less waste going to the landfill. In accordance with the waste management hierarchy these practices include reducing (waste prevention), reusing (deconstruction and salvage), recycling and renewing (making old things new again) - in that order. This manual will explain what these practices are and how to incorporate them into your projects.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Construction codes establish minimum standards for structural integrity, life safety, accessibility and energy conservation in construction of buildings and facilities intended for human occupancy. These requirements affect all of the major systems of buildings and facilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Flood Plain Management and Hazard Mitigation Task Force emphasizes the long-term benefits of mitigation and management to the entire state in preventing or reducing damages from floods and other hazards faced in Iowa. Investments in efforts to manage watershed areas and to mitigate any damages from floods or other disaster events benefit individuals, families, communities, agriculture, business and industry, and certainly public entities and infrastructure. The Task Force encourages the Rebuild Iowa Advisory Commission to balance the immediate needs for rebuilding to include the beginning of the investments required to effectively mitigate future damage and maintain effective policy in Iowa’s watersheds. The significance of the damage seen in Iowa from the tornadoes, storms, and floods of 2008 include the loss of eighteen Iowans in disaster-related events. This alone should inspire investment in mitigation efforts for all hazards. Much of the damage resulting from the disasters can be tied to floodplain management and hazard mitigation, pointing the way toward enhanced efforts and new initiatives to safeguard lives, property, and communities’ economic health. Even so, it must be recognized that the weather events throughout last winter and spring added impetus to the rains and storms that ultimately resulted in record flooding. Some perspective must be maintained as planning progresses and significant investments in mitigation are considered to meet a specific level of safety and protection from future threats. The Task Force identified a number of issues, and four were agreed-upon as those with the highest priority to be addressed by the Task Force through a set of recommendations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Flood Plain Management and Hazard Mitigation Task Force emphasizes the long-term benefits of mitigation and management to the entire state in preventing or reducing damages from floods and other hazards faced in Iowa. Investments in efforts to manage watershed areas and to mitigate any damages from floods or other disaster events benefit individuals, families, communities, agriculture, business and industry, and certainly public entities and infrastructure. The Task Force encourages the Rebuild Iowa Advisory Commission to balance the immediate needs for rebuilding to include the beginning of the investments required to effectively mitigate future damage and maintain effective policy in Iowa’s watersheds. The significance of the damage seen in Iowa from the tornadoes, storms, and floods of 2008 include the loss of eighteen Iowans in disaster-related events. This alone should inspire investment in mitigation efforts for all hazards. Much of the damage resulting from the disasters can be tied to floodplain management and hazard mitigation, pointing the way toward enhanced efforts and new initiatives to safeguard lives, property, and communities’ economic health. Even so, it must be recognized that the weather events throughout last winter and spring added impetus to the rains and storms that ultimately resulted in record flooding. Some perspective must be maintained as planning progresses and significant investments in mitigation are considered to meet a specific level of safety and protection from future threats. The Task Force identified a number of issues, and four were agreed-upon as those with the highest priority to be addressed by the Task Force through a set of recommendations. Supplemental Information to the August 2008

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the amount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims appeared to have occurred randomly. However, using data from a sub sample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of warning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an example of such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Highway agencies spend millions of dollars to ensure safe and efficient winter travel. However, the effectiveness of winter weather maintenance practices on safety and mobility are somewhat difficult to quantify. Phase I of this project investigated opportunities for improving traffic safety on state-maintained roads in Iowa during winter weather conditions. The primary objective was to develop several preliminary means for the Iowa Department of Transportation (DOT) to identify locations of possible interest systematically with respect to winter weather-related safety performance based on crash history. Specifically, metrics were developed to assist in identifying possible habitual, winter weather-related crash sites on state-maintained rural highways in Iowa. In addition, the current state of practice, for both domestic and international highway agency practices, regarding integration of traffic safety- and mobility-related data in winter maintenance activities and performance measures were investigated. This investigation also included previous research efforts. Finally, a preliminary work plan, focusing on systematic use of safety-related data in support of winter maintenance activities and site evaluation, was prepared.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A previous study sponsored by the Smart Work Zone Deployment Initiative, “Feasibility of Visualization and Simulation Applications to Improve Work Zone Safety and Mobility,” demonstrated the feasibility of combining readily available, inexpensive software programs, such as SketchUp and Google Earth, with standard two-dimensional civil engineering design programs, such as MicroStation, to create animations of construction work zones. The animations reflect changes in work zone configurations as the project progresses, representing an opportunity to visually present complex information to drivers, construction workers, agency personnel, and the general public. The purpose of this study is to continue the work from the previous study to determine the added value and resource demands created by including more complex data, specifically traffic volume, movement, and vehicle type. This report describes the changes that were made to the simulation, including incorporating additional data and converting the simulation from a desktop application to a web application.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This Phase II project follows a previous project titled Strategies to Address Nighttime Crashes at Rural, Unsignalized Intersections. Based on the results of the previous study, the Iowa Highway Research Board (IHRB) indicated interest in pursuing further research to address the quality of lighting, rather than just the presence of light, with respect to safety. The research team supplemented the literature review from the previous study, specifically addressing lighting level in terms of measurement, the relationship between light levels and safety, and lamp durability and efficiency. The Center for Transportation Research and Education (CTRE) teamed with a national research leader in roadway lighting, Virginia Tech Transportation Institute (VTTI) to collect the data. An integral instrument to the data collection efforts was the creation of the Roadway Monitoring System (RMS). The RMS allowed the research team to collect lighting data and approach information for each rural intersection identified in the previous phase. After data cleanup, the final data set contained illuminance data for 101 lighted intersections (of 137 lighted intersections in the first study). Data analysis included a robust statistical analysis based on Bayesian techniques. Average illuminance, average glare, and average uniformity ratio values were used to classify quality of lighting at the intersections.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Bridge Project and 2) development of a web-based project management system for bridge and highway construction projects with less than $10 million in contract value. During the previous phase of this project (fiscal year 2010), the research team helped with the implementation process for AEC Sync and collected feedback from the Broadway Viaduct project team members before the start of the project. During the 2011 fiscal year, the research team collected the post-project surveys from the Broadway Viaduct project members and compared them to the pre-project survey results. The results of the AEC Sync implementation on the Broadway project were positive. The project members were satisfied with the performance of the AEC Sync software and how it facilitated document management and its transparency. In addition, the research team distributed, collected, and analyzed the pre-project surveys for the Iowa Falls Arch Bridge Project. The implementation of AEC Sync for the Iowa Falls Arch Bridge Project appears to also be positive, based on the pre-project surveys. The fourth phase of this electronic collaboration project involves the identification and implementation of a WPMS solution for smaller bridge and highway projects. The workflow for the shop drawing approval process for sign truss projects was documented and used to identify possible WPMS solutions. After testing and evaluating several WPMS solutions, Microsoft SharePoint Foundation’s site pages were selected to be pilot-tested on sign truss projects. Due to the limitation on the SharePoint license that the Iowa Department of Transportation (DOT) has, a file transfer protocol (FTP) site will be developed alongside this site to allow contractors to upload shop drawings to the Iowa DOT. The SharePoint site pages are expected to be ready for implementation during the 2012 calendar year.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Traffic safety engineers are among the early adopters of Bayesian statistical tools for analyzing crash data. As in many other areas of application, empirical Bayes methods were their first choice, perhaps because they represent an intuitively appealing, yet relatively easy to implement alternative to purely classical approaches. With the enormous progress in numerical methods made in recent years and with the availability of free, easy to use software that permits implementing a fully Bayesian approach, however, there is now ample justification to progress towards fully Bayesian analyses of crash data. The fully Bayesian approach, in particular as implemented via multi-level hierarchical models, has many advantages over the empirical Bayes approach. In a full Bayesian analysis, prior information and all available data are seamlessly integrated into posterior distributions on which practitioners can base their inferences. All uncertainties are thus accounted for in the analyses and there is no need to pre-process data to obtain Safety Performance Functions and other such prior estimates of the effect of covariates on the outcome of interest. In this slight, fully Bayesian methods may well be less costly to implement and may result in safety estimates with more realistic standard errors. In this manuscript, we present the full Bayesian approach to analyzing traffic safety data and focus on highlighting the differences between the empirical Bayes and the full Bayes approaches. We use an illustrative example to discuss a step-by-step Bayesian analysis of the data and to show some of the types of inferences that are possible within the full Bayesian framework.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Geographic information systems (GIS) and artificial intelligence (AI) techniques were used to develop an intelligent snow removal asset management system (SRAMS). The system has been evaluated through a case study examining snow removal from the roads in Black Hawk County, Iowa, for which the Iowa Department of Transportation (Iowa DOT) is responsible. The SRAMS is comprised of an expert system that contains the logical rules and expertise of the Iowa DOT’s snow removal experts in Black Hawk County, and a geographic information system to access and manage road data. The system is implemented on a mid-range PC by integrating MapObjects 2.1 (a GIS package), Visual Rule Studio 2.2 (an AI shell), and Visual Basic 6.0 (a programming tool). The system could efficiently be used to generate prioritized snowplowing routes in visual format, to optimize the allocation of assets for plowing, and to track materials (e.g., salt and sand). A test of the system reveals an improvement in snowplowing time by 1.9 percent for moderate snowfall and 9.7 percent for snowstorm conditions over the current manual system.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Transportation agencies in Iowa are responsible for a significant public investment with the installation and maintenance of traffic control devices and pavement markings. Included in this investment are thousands of signs and other inventory items, equipment, facilities, and staff. The proper application of traffic control devices and pavement markings is critical to public safety on streets and highways, and local governments have a prescribed responsibility under the Code of Iowa to properly manage these assets. This research report addresses current traffic control and pavement marking application, maintenance, and management in Iowa.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Roadside cross-drainage culverts have been found to impact vehicle accident injury levels. Designers have commonly used three safety treatments to protect errant drivers from culvert accidents. These treatments have included: culvert extension, guardrail installation and grating. In order to define which safety treatment is the most appropriate, benefit-cost analysis has used accident cost reduction to estimate societal gains earned by using any safety treatment. The purpose of this study was to estimate accident costs for a wide range of roadway and roadside characteristics so that designers can calculate benefit/cost ratios for culvert safety treatment options under any particular scenario. This study began with conducting a parametric study in order to find variables which have significant impact on accident cost changes. The study proceeded with highway scenario modeling which included scenarios with different values for combinations of roadway and roadside variables. These variables were chosen based upon findings from the parametric study and their values were assigned based upon highway classification. This study shows that the use of different culvert safety treatments should be flexible to roadway and roadside characteristics. It also shows that culvert extension and grating were the safety treatments found to produce the lowest accident costs for all highway scenarios modeled. Therefore, it is believed that the expanded adoption of culvert extension and culvert grates can improve overall highway safety.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This research project combined various datasets, existing and created for this project, into an Interactive Mapping Service (IMS) for use by Iowa DOT personnel, county planning and zoning departments and the public in order to make more informed decisions regarding aggregate sources and future access to them. Iowa DOT Technical Advisory Committee meetings were held, along with public forum presentations, in order to understand better the social, ecological and economic limitations to extracting aggregate. The information needed by potential users was conveyed and integrated into a single informational source, the Aggregate Planning IMS.