142 resultados para Rail Track Design
Resumo:
This report fulfills the requirements of the following Code of Iowa Sections: Section 327J.3(1): “The director may expend moneys from the fund to pay the costs associated with the initiation, operation, and maintenance of rail passenger service. The director shall report by February 1 of each year to the legislative services agency concerning the status of the fund including anticipated expenditures for the following fiscal year.” Section 327J.3(5): "The director shall report annually to the general assembly concerning the development and operation of the midwest regional rail system and the state's passenger rail service."
Resumo:
Sustainable Concrete Pavements: A Manual of Practice is a product of the National Concrete Pavement Technology Center at Iowa State University’s Institute for Transportation, with funding from the Federal Highway Administration (DTFH61-06-H-00011, Work Plan 23). Developed as a more detailed follow-up to a 2009 briefing document, Building Sustainable Pavement with Concrete, this guide provides a clear, concise, and cohesive discussion of pavement sustainability concepts and of recommended practices for maximizing the sustainability of concrete pavements. The intended audience includes decision makers and practitioners in both owner-agencies and supply, manufacturing, consulting, and contractor businesses. Readers will find individual chapters with the most recent technical information and best practices related to concrete pavement design, materials, construction, use/operations, renewal, and recycling. In addition, they will find chapters addressing issues specific to pavement sustainability in the urban environment and to the evaluation of pavement sustainability. Development of this guide satisfies a critical need identified in the Sustainability Track (Track 12) of the Long-Term Plan for Concrete Pavement Research and Technology (CP Road Map). The CP Road Map is a national research plan jointly developed by the concrete pavement stakeholder community, including Federal Highway Administration, academic institutions, state departments of transportation, and concrete pavement–related industries. It outlines 12 tracks of priority research needs related to concrete pavements. CP Road Map publications and other operations support services are provided by the National Concrete Pavement Technology Center at Iowa State University. For details about the CP Road Map, see www.cproadmap. org/index.cfm.
Resumo:
The I-74 Aesthetic Design Guideline (ADG) document has two primary goals: To establish and identify an overall design theme To prioritize enhancement opportunities within the framework of corridor elements The recommendations of this report have been developed based on an “unconstrained” framework for future corridor–wide enhancements. Future funding availability, along with the recommendations of this report, will guide the final design process. ADG Future Uses: This document is intended to be used as a reference to future processes in the following ways: Guidance for I-74 final design teams Reference document for future local community redevelopment initiatives Inspiration for identification and development of other I-74 corridor aesthetic enhancement opportunities Process: As illustrated in Figure 1.3, the overall process for corridor aesthetics began traditionally with inventory and identification of potential aesthetic applications. The ADG does not document all the reports and presentations related to these early design stages, but has incorporated these efforts into the design theme, guiding principles and prioritized enhancements shown on the following pages of this report. The I-74 final design phase will incorporate these recommendations into the project. The consultant design team and representatives of the DOTs have worked with the CAAT members to facilitate community input and have helped develop recommendations for improving I-74 corridor aesthetics. CAAT recommendations have been advanced to the I-74 Advisory Committee for review and endorsement. Both DOTs have reviewed the CAAT recommendations and have endorsed the contents of this report. Figure 1.4 illustrates the status of corridor aesthetic design development. As of the date of this report, aesthetic design is approximately 50% complete. Future detailed design, cost evaluation, feasibility and prioritizations all need to occur for this process to be successfully completed.
Resumo:
Since the introduction of expanded levels of intrastate service on October 30, 2006, Amtrak trains in Illinois have produced impressive gains in both ridership and ticket revenue. This success and continuing stakeholder support has given rise to a formal request from the Illinois Department of Transportation (“Ill. DOT”) to Amtrak to develop a feasibility study regarding possible service consisting of a morning and an evening train in each direction between Chicago and the Quad Cities. The area between Chicago and the Quad Cities includes many rapidly growing communities. From Chicago toward the West and South, many towns and cities have experienced double digit growth increases in population since the year 2000. Southern DuPage, Cook and Will counties have seen especially strong growth, pressuring highway infrastructure, utilities, and schools. Community development and highway congestion are readily apparent when traveling the nearly 3 hour, 175 mile route between Chicago and the Quad Cities. As information, there are only three weekday round trip bus frequencies available between Chicago and the Quad Cities. The Quad City International Airport offers a total of 10 daily scheduled round trip flights to Chicago's O'Hare International Airport via two separate carriers flying regional jets. The Quad Cities (Davenport, Moline, Rock Island, and Bettendorf) are located along the Mississippi River. Nearly 60% of its visitors are from the Chicago area. With dozens of miles of scenic riverfront, river boating, casinos, and thousands of acres of expansive public spaces, the Quad Cities area is a major draw from both Iowa and Illinois. The huge Rock Island Arsenal, one of the largest military arsenals in the country and located along the river, is transitioning to become the headquarters of the United States First Army. As will be discussed later in the report, there is only one logical rail route through the Quad Cities themselves. The Iowa Interstate Railroad operates through the Quad Cities along the river and heads west through Iowa. The Quad Cities are considering at least three potential locations for an Amtrak station. A study now underway supported by several local stakeholders will recommend a site which will then be considered, given available local and other financial support. If Amtrak service were to terminate in the Quad Cities, an overnight storage track of sufficient length along with ample parking and certain other requirements covered elsewhere in the report would be required.
Resumo:
Overview of the Passenger Service Connects Iowa City, Quad Cities and Chicago, 219.5 miles Twice‐daily service each way, 4 hours and 15 minutes travel time 246,800 passengers first year (676 per day) Project construction cost $310 million (80% federal, 14.5% Illinois, 5.4% Iowa) On‐time performance 90% or better (trains arrive within 10 minutes of schedule) Competitive passenger rail service operator selection Iowa’s annual share of operating cost support averages $3 million
Resumo:
This business plan describes the methods by which the Iowa Department of Transportation (DOT) will partner with Iowa counties and cities to fund Iowa’s share of the operating and maintenance cost for the Chicago- Iowa City passenger-rail service, an average of $3 million per year.
Resumo:
Data sheet produced by the Iowa Department of Natural Resources is about different times of animals, insects, snakes, birds, fish, butterflies, etc. that can be found in Iowa.
Resumo:
Iowa’s share of the match will come from a combination of state appropriations and local funding. In FY 11, Iowa lawmakers approved intent language to provide up to $20 million over four years to help fund Iowa’s mmitment for matching federal passenger rail funding. To date, the legislature has appropriated $10 million to be used for the match. • Illinois announced in January 2010 that it would use $45 million from its state capital plan for construction of the route.
Resumo:
The Chicago to Iowa City Intercity Passenger Rail Program (Program) is a joint undertaking of the Iowa Department of Transportation (Iowa DOT) and the Illinois Department of Transportation (Illinois DOT). The purpose of the Program is to reestablish passenger rail services from Chicago to Iowa City, independently and in concert with the MWRRI (Midwest Regional Rail Initiative). The Chicago to Iowa City Corridor is one part of the vision established by the MWRRI to expand existing and develop new regional passenger rail service to meet existing and future travel demands in the Midwest. This project will expand and create a rail transportation alternative to supplant private automobile, bus, and air travel between Chicago and Iowa City, and intermediate points, and to create new transportation opportunity and capability for people who cannot meet their transportation needs with private automobile, bus and air modes.
Resumo:
Five Seasons Transportation & Parking (FSTP) and the Johnson County Council of Governments (JCCOG) are interested in evaluating the feasibility of prospective passenger rail service(s) that would operate over existing trackage of the Cedar Rapids and Iowa City Railway Company (CRANDIC), seen below left, and/or the Iowa Interstate Railroad System (IAIS), seen below right, connecting Cedar Rapids, Iowa City and the Amana Colonies. To perform the study, FSTP and JCCOG selected R.L. Banks & Associates, Inc. (RLBA) as Prime Contractors, HNTB Corporation (HNTB) and Snyder & Associates, Inc. (Snyder) as Subcontractors, hereafter Consultant Team. Both railroads participated in the study and contributed time and resources, as did many local government and civic organizations. The purpose of the study is to determine whether it is feasible to establish regularly scheduled passenger rail service and/or special event excursion rail service, in conjunction with the Five Seasons Transit system, Iowa City Transit, East Central Iowa Transit, Coralville Transit and the University of Iowa CAMBUS.
Resumo:
The present research project was designed to identify the typical Iowa material input values that are required by the Mechanistic-Empirical Pavement Design Guide (MEPDG) for the Level 3 concrete pavement design. It was also designed to investigate the existing equations that might be used to predict Iowa pavement concrete for the Level 2 pavement design. In this project, over 20,000 data were collected from the Iowa Department of Transportation (DOT) and other sources. These data, most of which were concrete compressive strength, slump, air content, and unit weight data, were synthesized and their statistical parameters (such as the mean values and standard variations) were analyzed. Based on the analyses, the typical input values of Iowa pavement concrete, such as 28-day compressive strength (f’c), splitting tensile strength (fsp), elastic modulus (Ec), and modulus of rupture (MOR), were evaluated. The study indicates that the 28-day MOR of Iowa concrete is 646 + 51 psi, very close to the MEPDG default value (650 psi). The 28-day Ec of Iowa concrete (based only on two available data of the Iowa Curling and Warping project) is 4.82 + 0.28x106 psi, which is quite different from the MEPDG default value (3.93 x106 psi); therefore, the researchers recommend re-evaluating after more Iowa test data become available. The drying shrinkage (εc) of a typical Iowa concrete (C-3WR-C20 mix) was tested at Concrete Technology Laboratory (CTL). The test results show that the ultimate shrinkage of the concrete is about 454 microstrain and the time for the concrete to reach 50% of ultimate shrinkage is at 32 days; both of these values are very close to the MEPDG default values. The comparison of the Iowa test data and the MEPDG default values, as well as the recommendations on the input values to be used in MEPDG for Iowa PCC pavement design, are summarized in Table 20 of this report. The available equations for predicting the above-mentioned concrete properties were also assembled. The validity of these equations for Iowa concrete materials was examined. Multiple-parameters nonlinear regression analyses, along with the artificial neural network (ANN) method, were employed to investigate the relationships among Iowa concrete material properties and to modify the existing equations so as to be suitable for Iowa concrete materials. However, due to lack of necessary data sets, the relationships between Iowa concrete properties were established based on the limited data from CP Tech Center’s projects and ISU classes only. The researchers suggest that the resulting relationships be used by Iowa pavement design engineers as references only. The present study furthermore indicates that appropriately documenting concrete properties, including flexural strength, elastic modulus, and information on concrete mix design, is essential for updating the typical Iowa material input values and providing rational prediction equations for concrete pavement design in the future.
Resumo:
Geographic information systems (GIS) and artificial intelligence (AI) techniques were used to develop an intelligent snow removal asset management system (SRAMS). The system has been evaluated through a case study examining snow removal from the roads in Black Hawk County, Iowa, for which the Iowa Department of Transportation (Iowa DOT) is responsible. The SRAMS is comprised of an expert system that contains the logical rules and expertise of the Iowa DOT’s snow removal experts in Black Hawk County, and a geographic information system to access and manage road data. The system is implemented on a mid-range PC by integrating MapObjects 2.1 (a GIS package), Visual Rule Studio 2.2 (an AI shell), and Visual Basic 6.0 (a programming tool). The system could efficiently be used to generate prioritized snowplowing routes in visual format, to optimize the allocation of assets for plowing, and to track materials (e.g., salt and sand). A test of the system reveals an improvement in snowplowing time by 1.9 percent for moderate snowfall and 9.7 percent for snowstorm conditions over the current manual system.
Resumo:
Most counties have bridges that are no longer adequate, and are faced with large capital expenditure for replacement structures of the same size. In this regard, low water stream crossings (LWSCs) can provide an acceptable, low cost alternative to bridges and culverts on low volume and reduced maintenance level roads. In addition to providing a low cost option for stream crossings, LWSCs have been designed to have the additional benefit of streambed stabilization. Considerable information on the current status of LWSCs in Iowa, along with insight of needs for design assistance, was gained from a survey of county engineers that was conducted as part of this research (Appendix A). Copies of responses and analysis are included in Appendix B. This document provides guidelines for the design of LWSCs. There are three common types of LWSCs: unvented ford, vented ford with pipes, and low water bridges. Selection among these depends on stream geometry, discharge, importance of road, and budget availability. To minimize exposure to tort liability, local agencies using low water stream crossings should consider adopting reasonable selection and design criteria and certainly provide adequate warning of these structures to road users. The design recommendations included in this report for LWSCs provide guidelines and suggestions for local agency reference. Several design examples of design calculations are included in Appendix E.
Resumo:
Most Iowa counties maintain low volume roads with at least one bridge or culvert that is structurally deficient or obsolete. In some counties the percentage of deficient drainage structures may be as high as 62%. Replacement with structures of similar size would require large capital expenditures that many counties cannot afford. Low water stream crossings (LWSCs) may be an acceptable lowcost alternative in some cases.
Resumo:
In Iowa, there are currently no uniform design standards for rural and suburban subdivision development roadways. Without uniform design standards, many counties are unable to provide adequate guidance for public facilities, particularly roadways, to be constructed as part of a rural subdivision development. If a developer is not required to install appropriate public improvements or does not do so properly, significant liability and maintenance expenses can be expected, along with the potential for major project costs to correct the situation. Not having uniform design standards for rural and suburban subdivision development improvements in Iowa creates situations where there is potential for inconsistency and confusion. Differences in the way development standards are applied also create incentives or disincentives for developers to initiate subdivision platting in a particular county. With the wide range of standards or lack of standards for local roads in development areas, it is critical that some level of uniformity is created to address equity in development across jurisdictional lines. The standards must be effective in addressing the problem, but they must not be so excessive as to curtail development activities within a local jurisdiction. In order to address the concerns, cities and counties have to work together to identify where growth is going to be focused. Within that long-term growth area, the roadways should be constructed to urban standards to provide an easier transition to traditional urban facilities as the area is developed. Developments outside of the designated growth area should utilize a rural cross section since it is less likely to have concentrated urban development. The developers should be required to develop roadways that are designed for a minimum life of 40 years, and the county should accept dedication of the roadway and be responsible for its maintenance.