60 resultados para Programa Municipal de Apoio ao Arrendamento - Municipal Program for Support to Leasing


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The quadrennial need study was developed to assist in identifying county highway financial needs (construction, rehabilitation, maintenance, and administration) and in the distribution of the road use tax fund (RUTF) among the counties in the state. During the period since the need study was first conducted using HWYNEEDS software, between 1982 and 1998, there have been large fluctuations in the level of funds distributed to individual counties. A recent study performed by Jim Cable (HR-363, 1993), found that one of the major factors affecting the volatility in the level of fluctuations is the quality of the pavement condition data collected and the accuracy of these data. In 1998, the Center for Transportation Research and Education researchers (Maze and Smadi) completed a project to study the feasibility of using automated pavement condition data collected for the Iowa Pavement Management Program (IPMP) for the paved county roads to be used in the HWYNEEDS software (TR-418). The automated condition data are objective and also more current since they are collected in a two year cycle compared to the 10-year cycle used by HWYNEEDS right now. The study proved the use of the automated condition data in HWYNEEDS would be feasible and beneficial in educing fluctuations when applied to a pilot study area. In another recommendation from TR-418, the researchers recommended a full analysis and investigation of HWYNEEDS methodology and parameters (for more information on the project, please review the TR-418 project report). The study reported in this document builds on the previous study on using the automated condition data in HWYNEEDS and covers the analysis and investigation of the HWYNEEDS computer program methodology and parameters. The underlying hypothesis for this study is thatalong with the IPMP automated condition data, some changes need to be made to HWYNEEDS parameters to accommodate the use of the new data, which will stabilize the process of allocating resources and reduce fluctuations from one quadrennial need study to another. Another objective of this research is to investigate the gravel roads needs and study the feasibility of developing a more objective approach to determining needs on the counties gravel road network. This study identifies new procedures by which the HWYNEEDS computer program is used to conduct the quadrennial needs study on paved roads. Also, a new procedure will be developed to determine gravel roads needs outside of the HWYNEED program. Recommendations are identified for the new procedures and also in terms of making changes to the current quadrennial need study. Future research areas are also identified.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Traumatic Brain Injury (TBI) impacts the lives of thousands of Iowans every year. TBI has been described as the “Silent Epidemic” because so often the scars are not visible to others. The affects of brain injury are cognitive, emotional, social, and can result in physical disability. In addition to the overwhelming challenges individuals with brain injury experience, families also face many difficulties in dealing with their loved one’s injury, and in navigating a service delivery system that can be confusing and frustrating. In 1998, the Iowa Department of Public Health (IDPH) conducted a comprehensive statewide needs assessment of brain injury in Iowa. This assessment led to the development of the first Iowa Plan for Brain Injury, “Coming Into Focus.” An updated state plan, the Iowa Plan for Brain Injuries 2002 – 2005, was developed, which reported on progress of the previous state plan, and outlined gaps in service delivery in Iowa. Four areas of focus were identified by the State Plan for Brain Injuries Task Force that included: 1) Expanding the Iowa Brain Injury Resource Network (IBIRN); 2) Promoting a Legislative and Policy Agenda, While Increasing Legislative Strength; 3) Enhancing Data Collection; and, 4) Increasing Funding. The IDPH utilized “Coming Into Focus” as the framework for an application to the federal TBI State Grant Program, which has resulted in more than $900,000 for plan implementation. Iowa continues to receive grant dollars through the TBI State Grant Program, which focuses on increasing capacity to serve Iowans with brain injury and their families. Highlighting the success of this grant project, in 2007 the IDPH received the federal TBI Program’s “Impacting Systems Change” Award. The Iowa Brain Injury Resource Network (IBIRN) is the product of nine years of TBI State Grant Program funding. The IBIRN was developed to ensure that Iowans got the information and support they needed after a loved one sustained a TBI. It consists of a hospital and service provider pre-discharge information and service linkage process, a resource facilitation program, a peer-to-peer volunteer support network, and a service provider training and technical assistance program. Currently over 90 public and private partners work with the IDPH and the Brain Injury Association of Iowa (BIA-IA) to administer the IBIRN system and ensure that families have a relevant and reliable location to turn for information and support. Further success was accomplished in 2006 when the Iowa legislature created the Brain Injury Services Program within the IDPH. This program consists of four components focusing on increasing access to services and improving the effectiveness of services available to individuals with TBI and their families, including: 1) HCBS Brain Injury Waiver-Eligible Component; 2) Cost Share Component; 3) Neuro-Resource Facilitation; and, 4) Enhanced Training. The Iowa legislature appropriated $2.4 million to the Brain Injury Services Program in state fiscal year (SFY) 2007, and increased that amount to $3.9 million in SFY 2008. The Cost Share Component models the HCBS Brain Injury Waiver menu of services but is available for Iowans who do not qualify functionally or financially for the Waiver. In addition, the Neuro-Resource Facilitation program links individuals with brain injury and their families to needed supports and services. The Iowa Plan for Brain Injury highlights the continued need for serving individuals with brain injury and their families. Additionally, the Plan outlines the paths of prevention and services, which will expand the current system and direct efforts into the future.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The department shall develop recommendations for an implementation schedule, including funding projections, for the substitute decision maker program created pursuant to chapter 231E, and shall submit the recommendations to the individuals identified in this Act for submission of reports by December 15, 2012.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Office of Special Investigations at Iowa Department of Transportation (DOT) collects FWD data on regular basis to evaluate pavement structural conditions. The primary objective of this study was to develop a fully-automated software system for rapid processing of the FWD data along with a user manual. The software system automatically reads the FWD raw data collected by the JILS-20 type FWD machine that Iowa DOT owns, processes and analyzes the collected data with the rapid prediction algorithms developed during the phase I study. This system smoothly integrates the FWD data analysis algorithms and the computer program being used to collect the pavement deflection data. This system can be used to assess pavement condition, estimate remaining pavement life, and eventually help assess pavement rehabilitation strategies by the Iowa DOT pavement management team. This report describes the developed software in detail and can also be used as a user-manual for conducting simulation studies and detailed analyses. *********************** Large File ***********************

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report documents an extensive field program carried out to identify the relationships between soil engineering properties, as measured by various in situ devices, and the results of machine compaction monitoring using prototype compaction monitoring technology developed by Caterpillar Inc. Primary research tasks for this study include the following: (1) experimental testing and statistical analyses to evaluate machine power in terms of the engineering properties of the compacted soil (e.g., density, strength, stiffness) and (2) recommendations for using the compaction monitoring technology in practice. The compaction monitoring technology includes sensors that monitor the power consumption used to move the compaction machine, an on-board computer and display screen, and a GPS system to map the spatial location of the machine. In situ soil density, strength, and stiffness data characterized the soil at various stages of compaction. For each test strip or test area, in situ soil properties were compared directly to machine power values to establish statistical relationships. Statistical models were developed to predict soil density, strength, and stiffness from the machine power values. Field data for multiple test strips were evaluated. The R2 correlation coefficient was generally used to assess the quality of the regressions. Strong correlations were observed between averaged machine power and field measurement data. The relationships are based on the compaction model derived from laboratory data. Correlation coefficients (R2) were consistently higher for thicker lifts than for thin lifts, indicating that the depth influencing machine power response exceeds the representative lift thickness encountered under field conditions. Caterpillar Inc. compaction monitoring technology also identified localized areas of an earthwork project with weak or poorly compacted soil. The soil properties at these locations were verified using in situ test devices. This report also documents the steps required to implement the compaction monitoring technology evaluated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation (DOT) is continually improving the pavement management program and striving to reduce maintenance needs. Through a 1979 pavement management study, the Iowa DOT became a participant in a five state Federal Highway Administration (FHWA) study of "Transverse Cracking of Asphalt Pavements". There were numerous conclusions and recommendations but no agreement as to the major factors contributing to transverse cracking or methods of preventing or reducing the occurrence of transverse cracking. The project did focus attention on the problem and generated ideas for research. This project is one of two state funded research projects that were a direct result of the FHWA project. Iowa DOT personnel had been monitoring temperature susceptibility of asphalt cements by the Norman McLeod Modified Penetration Index. Even though there are many variables from one asphalt mix to another, the trend seemed to indicate that the frequency of transverse cracking was highly dependent on the temperature susceptibility. Research project HR-217 "Reducing the Adverse Effects of Transverse Cracking" was initiated to verify the concept. A final report has been published after a four-year evaluation. The crack frequency with the high temperature susceptible asphalt cement was substantially greater than for the low temperature susceptible asphalt cement. An increased asphalt cement content in the asphalt treated base also reduced the crack frequency. This research on prevention of transverse cracking with fabric supports the following conclusions: 1. Engineering fabric does not prevent transverse cracking of asphalt cement concrete. 2. Engineering fabric may retard the occurrence of transverse cracking. 3. Engineering fabric does not contribute significantly to the structural capability of an asphalt concrete pavement.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Culverts are common means to convey flow through the roadway system for small streams. In general, larger flows and road embankment heights entail the use of multibarrel culverts (a.k.a. multi-box) culverts. Box culverts are generally designed to handle events with a 50-year return period, and therefore convey considerably lower flows much of the time. While there are no issues with conveying high flows, many multi-box culverts in Iowa pose a significant problem related to sedimentation. The highly erosive Iowa soils can easily lead to the situation that some of the barrels can silt-in early after their construction, becoming partially filled with sediment in few years. Silting can reduce considerably the capacity of the culvert to handle larger flow events. Phase I of this Iowa Highway Research Board project (TR-545) led to an innovative solution for preventing sedimentation. The solution was comprehensively investigated through laboratory experiments and numerical modeling aimed at screening design alternatives and testing their hydraulic and sediment conveyance performance. Following this study phase, the Technical Advisory Committee suggested to implement the recommended sediment mitigation design to a field site. The site selected for implementation was a 3-box culvert crossing Willow Creek on IA Hwy 1W in Iowa City. The culvert was constructed in 1981 and the first cleanup was needed in 2000. Phase II of the TR 545 entailed the monitoring of the site with and without the selfcleaning sedimentation structure in place (similarly with the study conducted in laboratory). The first monitoring stage (Sept 2010 to December 2012) was aimed at providing a baseline for the operation of the as-designed culvert. In order to support Phase II research, a cleanup of the IA Hwy 1W culvert was conducted in September 2011. Subsequently, a monitoring program was initiated to document the sedimentation produced by individual and multiple storms propagating through the culvert. The first two years of monitoring showed inception of the sedimentation in the first spring following the cleanup. Sedimentation continued to increase throughout the monitoring program following the depositional patterns observed in the laboratory tests and those documented in the pre-cleaning surveys. The second part of Phase II of the study was aimed at monitoring the constructed self-cleaning structure. Since its construction in December 2012, the culvert site was continuously monitored through systematic observations. The evidence garnered in this phase of the study demonstrates the good performance of the self-cleaning structure in mitigating the sediment deposition at culverts. Besides their beneficial role in sediment mitigation, the designed self-cleaning structures maintain a clean and clear area upstream the culvert, keep a healthy flow through the central barrel offering hydraulic and aquatic habitat similar with that in the undisturbed stream reaches upstream and downstream the culvert. It can be concluded that the proposed self-cleaning structural solution “streamlines” the area upstream the culvert in a way that secures the safety of the culvert structure at high flows while producing much less disturbance in the stream behavior compared with the current constructive approaches.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Kossuth County is located in North Central Iowa bordering on the State of Minnesota. It is the largest county in Iowa consisting of 28 congressional townships. The population of the county is 23,000 of which 11,000 people live in the rural area. There are 13 towns located in the county with the county seat, Algona, being the largest with a population of 6,100. Major industry of the area is grain farming with some beef and hog production. Naturally, where there is good grain farm land it follows that there is poor soil available for road construction and pavements. However, below the 3 to 4 feet of good farm land of Kossuth there is present a good grade of clay soil which does make an adequate base for surfacing when placed and compacted on top of the roadbed. As early as 1950, the then Kossuth County Engineer, H.M. Smith, embarked on a program of stage construction in building new grades and pavements. The goal of his program was primarily to conserve the county's rapidly dwindling supply of surfacing materials, and also, to realize the side effects of providing smooth and dustless roads for the public. Engineer Smith was fully aware of the poor soils that existed for road construction, but he also knew about the good clay that lay below the farm soil. Consequently, in his grading program he insisted that road ditches be dug deep enough to allow the good clay soil to be compacted on top of the roadbed. The presence of the compacted clay on top of the road resulted in a briding affect over the farm soil. The stage construction program satisfied the objectives of aggregate construction and dust control but did generate other problems which we are now trying to solve as economically as possible.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In recent years in both Iowa and nationally, there has been a strong focus on increasing salary levels for teachers. Iowa initiated the Student Achievement and Teacher Quality Program in fiscal year 2002 to improve the quality of K-12 teachers in Iowa schools. The program's funding to improve teacher salaries continues and is now part of the school-aid formula. During the same time period, there has been a growing focus on recruiting and improving the quality of school district superintendents and other school administrators. This issue review looks at the growth of salaries over the past ten years for Iowa's full-time teachers, superintendents and other administrators.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The goal of this research project was to develop a method to measure the performance of a winter maintenance program with respect to the task of providing safety and mobility to the travelling public. Developing these measures required a number of steps, each of which was accomplished. First, the impact of winter weather on safety (crash rates) and mobility (average vehicle speeds were measured by a combination of literature reviews and analysis of Iowa Department of Transportation traffic and Road Weather Information System data. Second, because not all winter storms are the same in their effects on safety and mobility, a method had to be developed to determine how much the various factors that describe a winter storm actually change safety and mobility. As part of this effort a storm severity index was developed, which ranks each winter storm on a scale between 0 (a very benign storm) and 1 (the worst imaginable storm). Additionally a number of methods of modeling the relationships between weather, winter maintenance actions and road surface conditions were developed and tested. The end result of this study was a performance measure based on average vehicle speed. For a given class of road, a maximum expected average speed reduction has been identified. For a given storm, this maximum expected average speed reduction is modified by the storm severity index to give a target average speed reduction. Thus, if for a given road the maximum expected average speed reduction is 20 mph, and the storm severity for a particular storm is 0.6, then the target average speed reduction for that road in that storm is 0.6 x 20 mph or 12 mph. If the average speed on that road during and after the storm is only 12 mph or less than the average speed on that road in good weather conditions, then the winter maintenance performance goal has been met.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Buena Vista SWCD is submitting this WIRB request on behalf of both Buena Vista and Pocahontas SWCDs. The two SWCDs are working jointly on a project that includes three existing Mississippi River Basin Imitative (MRBI) project areas in the North Raccoon River Watershed. The total project area is 280,654 crop acres. The MRBI project involves installing conservation practices through the EQIP program. Funding from MRBI will support costs of practice design, layout and checkout, however, there is no funding to market and sell the program and practices to landowners and producers in the project area. Both soil and water districts are financially supporting work currently being done to encourage signup for the approved practices. To effectively implement the MRBI project it is imperative that marketing and promotion through group meetings and one-on­ one contacts is completed. Funding from WIRB will allow the existing employee to spend the needed time on these promotional activities in both Buena Vista and Pocahontas County. Through this WIRB request these two SWCDs districts plan to apply over $800,000 worth of conservation practices that is funded through the MRBI program. The return from this investment of WIRB dollars is large. This is an opportunity to support a large amount of conservation work in the North Raccoon River Watershed, which, is also an important water source for the city Des Moines and provides recreational activities from Des Moines up to BY and Pocahontas Counties.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Dry Run Creek Watershed received a biological impairment in 2002 after sampling conducted by the Department of Natural Resources revealed a lack in the diversity and abundance of aquatic life along a 2.8 mile reach of stream along the Southwest Branch. Among the primary stressors identified were hydrologic change, increased stormsewer inputs, lack of available habitat, and sedimentation. Goals put forth by the Watershed Management Plan and the preliminary Total Maximum Daily Load (TMDL) study center around the reduction in storm sewer inputs. The goal set forth by the TMDL is the reduction of connected impervious surface (CIS) to 10% in each of the creek’s subwatersheds as a surrogate for other stressors. Grant funding is being sought for the construction of two bioretention cells and a green roof to treat the first flush of runoff from a new 400 unit student housing structure and connected parking surfaces totaling 5.16 acres. In addition, a monitoring program will continue to be coordinated through a partnership with the Department of Natural Resources IOWATER program and locally led volunteer efforts which will allow us to track the progress of the watershed. Funding for administration, outreach, and assessment will be provided through existing 319 grants. Implementation of these practices will occur in phases over the course of a two year period.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Adverse weather conditions dramatically affect the nation’s surface transportation system. The development of a prototype winter Maintenance Decision Support System (MDSS) is part of the Federal Highway Administration’s effort to produce a prototype tool for decision support to winter road maintenance managers to help make the highways safer for the traveling public. The MDSS is based on leading diagnostic and prognostic weather research capabilities and road condition algorithms, which are being developed at national research centers. In 2003, the Iowa Department of Transportation was chosen as a field test bed for the continuing development of this important research program. The Center for Transportation Research and Education assisted the Iowa Department of Transportation by collecting and analyzing surface condition data. The Federal Highway Administration also selected five national research centers to participate in the development of the prototype MDSS. It is anticipated that components of the prototype MDSS system developed by this project will ultimately be deployed by road operating agencies, including state departments of transportation, and generally supplied by private vendors.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Silver Lake is located in an 18,053-acre watershed. The watershed is intensively farmed with almost all of the wetlands being previously drained or degraded over the last 50 years. Silver Lake is listed on the State of Iowa’s impaired water bodies list due to sediment and high nutrient level. Silver Lake is also known be in the bottom 25 percentile of Iowa’s lakes due Secchi disk readings and Chlorophyll a level. Farming in the watershed is the principle concern and cause for many of the problems occurring in Silver Lake currently with 78% of the watershed being intensively farmed. There are two major drainage ditches that have been used to drain the major wetlands and sloughs that, at one time, filtered the water and slowed it down before it reached Silver Lake. With these two major drainage ditches, water is able to reach the lake much faster and unfiltered than it once did historically. The loss of 255 restorable wetland basins to row crop production has caused serious problems in Silver Lake. These wetland basins once slowed and filtered water as it moved through the watershed. With their loss over the last 50 years that traditional drainage no longer occurs. We propose to create a Wetland Reserve Program incentive project to make WRP a more attractive option to landowners within the watershed. The incentive will be based on the amount of sediment delivery reduction to the lake, therefore paying a greater payment for a greater benefit to the lake. The expected result of this project is the restoration of over 250 acres of wetland basins with an associated 650 acres of upland buffers. The benefit for these wetlands and buffers would be reduced sediment, reduced nutrients, and slowed waters to the lake.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Pesticide Poisoning Surveillance Program within the Division of ADPER & EH monitors, collects, and analyzes pesticide poisonings to determine the extent to which Iowans are being affected by pesticide exposure. The information gathered by this program is disseminated to governmental agencies, the public, and health care professionals. In addition, IDPH is required to submit its findings annually to the Iowa Department of Agriculture and Land Stewardship (IDALS).