54 resultados para Cedar Springs (Mich.)
Resumo:
Numerous strategies have been experimented with nationwide in an attempt to reduce the overall number of pedestrian-vehicle crashes, especially in instances where improper crossing or failure to yield was the proximate cause of the crash. Some of these measures include overhead signs, flashing warning beacons, advanced crossing signs, more visible pavement markings, in-street “Yield to Pedestrian” signs, and more recently, in-pavement flashing lights. Pedestrian safety has been a key issue for the City of Cedar Rapids, Iowa, in particular at non-controlled intersections and mid-block crossings. In 2002, the city council gave preliminary approval to implement a pedestrian-actuated overhead flasher system in conjunction with an in-pavement flasher system at the intersection of 1st Avenue NE and 4th Street NE in the downtown central business district. This location is uncontrolled and has several elements that can create conflicts between pedestrians, vehicles, and trains that service local industry. This report summarizes the results from a small-scale study completed by CTRE to evaluate the effectiveness of the in-pavement flasher system installed in downtown Cedar Rapids. The installation of in-pavement flashing warning lights at the pedestrian crosswalk at this site has had a net positive effect on the safety characteristics of the location. The results of this study show a marked improvement in motorist compliance with the state law requiring that motorists yield to pedestrians in the crosswalk. The pedestrian and motorist surveys show that both groups felt the in-pavement flashing lights have increased motorist awareness, especially at night. The data indicate the in-pavement flashing warning lights improved the motorists' response to pedestrians in the area, and that the system could be operational throughout summer and winter conditions.
Resumo:
Beginning on June 22, 2009, a road safety audit was initiated for the intersection of US 218 and County Road C-57 in Black Hawk County, Iowa. Due to the traffic volumes and the number of conflicting traffic movements on these two roadways, this intersection has developed a crash history that concerns the Iowa Department of Transportation (Iowa DOT), Iowa State Patrol, and local agencies. This intersection is ranked seventh in Iowa for the highest number of at-grade expressway intersection crashes. Considering this, Black Hawk County and the Iowa DOT requested that a road safety audit be conducted to address the safety concerns and recommend possible mitigation strategies.
Resumo:
Interstate 380 (I-380) through Cedar Rapids and Hiawatha, Iowa, is a multilane divided urban freeway that was constructed in 1976 to the Cedar River and in 1981 from that point northerly. Traffic volumes vary from 47,000 to 83,500 vehicles per day, with about 8%–15% trucks and buses. Based on concern for the high number of crash incidents, particularly serious crashes, and increased traffic volumes on this roadway, the City of Cedar Rapids and the Iowa Department of Transportation (Iowa DOT) District 6 Office requested that a road safety audit be conducted for this roadway section. Representatives from the Iowa DOT, Federal Highway Administration, Center for Transportation Research and Education, local law enforcement, local government, and area businesses met to review crash data and discuss potential safety improvements to this segment of I-380. This report outlines the findings and recommendations of the road safety audit team for addressing the safety concerns on this I-380 corridor and explains several selected mitigation strategies.
Resumo:
US 151 was originally constructed as IA 149 in 1931-1934 and has been rehabilitated several times. The most recent major improvements, which were completed in 2005-2006, consisted of hot mix asphalt resurfacing and partial shoulder paving. Major widening and resurfacing improvements were also completed in 2007 between Fairfax and US 30 in Cedar Rapids. According to a preliminary 2009 estimate, traffic volumes range from about 5,900 vehicles per day (vpd) north of Amana to about 14,400 vpd at the US 30 interchange in Cedar Rapids. In response to high crash densities and medium to medium-high crash rates along the route, the Iowa Department of Transportation (Iowa DOT) requested a road safety audit to examine the roadway and suggest possible mitigation. Representatives from the Iowa DOT, Federal Highway Administration, Institute for Transportation, local law enforcement, and state government met to review crash data and discuss potential safety improvements to this segment of US 151. This report outlines the findings and recommendations of the road safety audit team for addressing the safety concerns on this roadway.
Resumo:
Vehicle-pedestrian crashes are a major concern for highway safety analysts. Research reported by Hunter in 1996 indicated that one-third of the 5,000 vehicle-pedestrian crashes investigated occurred at intersections, and 40 percent of those were at non-controlled intersections (Hunter et al. 1996). Numerous strategies have been implemented in an effort to reduce these accidents, including overhead signs, flashing warning beacons, wider and brighter markings on the street, and advanced crossing signs. More recently, pedestrian-activated, in-street flashing lights at the crosswalk and pedestrian crossing signs in the traffic lane have been investigated. Not all of these strategies are recognized as accepted practices and included in the Manual on Uniform Traffic Control Devices (MUTCD), but the Federal Highway Administration (FHWA) is supportive of experimental applications that may lead to effective technology that helps reduce crashes.
Resumo:
Audit report of the University of Northern Iowa, Cedar Falls, Iowa, as of and for the years ended June 30, 2015 and 2014
Resumo:
The Iowa Department of Natural Resources (IDNR) requested the Iowa Department of Public Health (IDPH) Hazardous Waste Site Health Assessment Program to evaluate the health impacts of exposure to soil contaminated with heavy metals at a commercial property located in Cedar Rapids, Iowa. The specific request was to evaluate the health impacts from exposure to contaminants that were above IDNR statewide standards. This health consultation addresses potential health risks to people from exposure to the soil within the property. The information in this health consultation was current at the time of writing. Data that emerges later could alter this document’s conclusions and recommendations.
Resumo:
Two lanes of a major four lane arterial street needed to be reconstructed in Cedar Rapids, Iowa. The traffic volumes and difficulty of detouring the traffic necessitated closure for construction be held to an absolute minimum. Closure of the intersections, even for one day, was not politically feasible. Therefore, Fast Track and Fast Track II was specified for the project. Fast Track concrete paving has been used successfully in Iowa since 1986. The mainline portion of the project was specified to be Fast Track and achieved the opening strength of 400 psi in less than twelve hours. The intersections were allowed to be closed between 6 PM and 6 AM. This could occur twice - once to remove the old pavement and place the base and temporary surface and the second time to pave and cure the new concrete. The contractor was able to meet these restrictions. The Fast Track II used in the intersections achieved the opening strength of 350 psi in six to seven hours. Two test sections were selected in the mainline Fast Track and two intersections were chosen to test the Fast Tract II. Both flexural and compression specimens were tested. Pulse velocity tests were conducted on the pavement and test specimens. Maturity curves were developed through monitoring of the temperatures. Correlations were performed between the maturity and pulse velocity and the flexural strengths. The project was successful in establishing the feasibility of construction at night, with no disruption of traffic in the daytime, using fast Track II. Both the Fast Track II pavements were performing well four years after construction.
Resumo:
Audit report on the Cedar County Economic Development Commission for the year ended June 30, 2015