85 resultados para Cavitation-erosion


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Duck Creek Watershed, the recipient of a 2009 DNR Watershed Management Planning Grant and a focus of an upcoming City of Davenport master plan, is characterized by relatively flat grades and highly impervious areas. Plagued by issues such as high bacteria loads, stream bank erosion and flooding, solving these problems may take generations. The City of Davenport has taken a microwatershed approach to identify the significant contributors to water quality and flooding issues that affect Duck Creek, its tributaries and the surrounding landscape to make inroads into the larger issues. This project is the next phase of a multi-phased project that addresses the microwatershed that includes St Ambrose University. Work here will improve water quality within Duck Creek and address major flooding issues on campus while also reducing downstream flooding. This project will convert an existing parking lot into a green parking area by removing the hard surface and installing below ground facilities for storm water infiltration, detention, and reuse. Permeable pavement, bio­ swales and infiltration areas will be constructed on top of the infiltration facilities. We estimate that this project will capture and treat 1,110,000 gallons (3.5 acre feet) of storm water runoff which accounts to the runoff volume from a 10-year storm event while reducing pollutants by 30-100%.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Silver Creek is a warm water stream resource located in one of the most intensely cropped portions of Clayton County. The stream has been included on Iowa’s 303(d) list of impaired waters since 2002. Aquatic life, which should be present in Silver Creek, isn’t there. According to the Draft Total Maximum Daily Load (TMDL) for Silver Creek, the primary nonpoint pollution sources are soil erosion from agricultural land uses and direct deposition of ammonia by livestock with access to the stream. The Clayton Soil & Water Conservation District has begun efforts to remove Silver Creek from the impaired waters list. The District has promoted stream corridor and sinkhole protection, and the installation of buffer practices along Silver Creek and its tributaries. Conservation practices have been targeted to crop fields to reduce sediment delivery to the stream. A series of news articles, newsletters, and field days have been utilized to increase public understanding of water quality issues. Landowner interest has outweighed available cost share resources. Additional financial support will allow the project to build upon its early successes, to further address the identified impairments, and to respond to a long list of landowners that are interested in conservation work on their farms.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

River Action is requesting funds for a project that offers design, technical and financial assistance to residential and commercial landowners and municipalities for the installation of buffers along Duck Creek and its tributaries. The buffers will improve water quality, reduce erosion on stream banks and provide habitat for wildlife. The projects will be planned and implemented through public meetings and educational workshops. This method of community involvement will increase awareness and education concerning the impairments in Duck Creek in Davenport and Bettendorf in Scott County, Iowa and promote personal responsibility and stewardship of watersheds.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa’s three million acres of forest land provide environmental benefits to all Iowans in terms of soil erosion control, air quality, and water quality. In 2013, more than 6.5 million trees died. Within those trees there were more than 125 million board feet of wood, compared to 98 million board feet of wood harvested. This level of mortality is the highest level reported from US Forest Service inventories in twenty years. This is disturbing when considering more than 18,000 Iowans are employed in the wood products and manufacturing industry, generating nearly $4 billion in annual sales, more than $900 million in annual payroll and more than $25 million to private woodland owners annually from the sale of timber.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The DMACC Lake Watershed Improvement project will focus on water quality and quantity as well as channel and lake restoration. Roadway, parking lot, and roof drainage from the west and northwest portions of the campus add significant amounts of pollutants and silt to the lake. Severe channel erosion exists along the northern creek channel with exposed cut banks ranging from 2-10 feet in height devoid of vegetation. Heavy lake sedimentation and algae blooms are a result of accumulated sediment being conveyed to the lake. Most sections of the north channel have grades of between 0.5% and 1%. This channel receives large scouring flow velocities. There are no natural riffle or pool systems. There are five areas where these riffle and pool systems may need to be created in order to slow overall channel velocities. This will create a series of rock riffles and a still pool that will mimic the conditions that natural channels tend to create, protecting the channel from undercutting. Multiple practices will need to be implemented to address the pollutant, silt, and channel erosion. Improvements will be specifically tailored to address problems observed within the north channel, on-site drainage from the west and northwest, as well as off-site drainage to the north of the campus and east of Ankeny Blvd (Hwy 69). The result will be improved quality and quantity of site drainage and a channel with a more natural appearance and reduced scour velocities. Sections of the north channel will require grading to establish slopes that can support deep rooted vegetation and to improve maintenance access. Areas with eroded banks will require slope pull back and may also require toe armor protection to stabilize. A constructed wetland will collect and treat runoff from the west on site parking lot, before being discharged into the lake. This project will create educational opportunities to both students and the general public as well as interested parties outside of the local area for how an existing system can be retro fitted for improved watershed quality.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Staff and Beaver Creeks are two tributaries of the Upper Iowa River (UIR). Additional acres that drain directly into the UIR bring the size of the project area to 41,328 acres. The goal of the project is to reduce sediment loading and excess nutrients from reaching the streams which ultimately reach the UIR. Staff/Beaver Water Quality Project initially received funding as part of the FY 2005 WSPF/319 grant application cycle. Tremendous progress has been accomplished towards the original goals of the project. Due to the large number of Best Management Practices (BMPs) installed and the continued high interest for those practices, more work remains to be done. The heavy rains received in 2008 caused severe erosion and has dramatically increased interest in conservation practices. A thorough watershed assessment was completed in the fall of 2008. Data from this assessment indicates additional work is needed. The initial grant funding will be exhausted within fiscal year 2009. Therefore, the Howard Soil and Water Conservation District is seeking 3 years of funding. The District believes interest in the water quality project is at an all time high and that with an additional three years of funding, even more progress can be achieved in reducing sediment delivery and excess nutrients to these priority streams.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Muchakinock Creek Watershed Project began in February of 2005 to treat upland soil erosion in the creek that has lead to a 303(d) impairment. The Mahaska SWCD is currently administering this cost-share program to promote terraces, basins, and grade stabilization structures. The District is seeking funding from WIRB to treat specific abandoned mine lands in the Muchakinock Creek Watershed. These areas contribute sediment to the creek at levels second only to agricultural lands as well as acid mine drainage from open pits mines that have been left to decay across the county. The WIRB funding would be used to compliment Federal Abandoned Mine Land (AML) funding in the reclamation of these areas.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Lake Morris is the larger of two lakes which serve as the municipal water supply for the City of Chariton, Iowa. As a site for fishing and boating, it also serves as a significant recreational resource for area residents. Its ability to sustain these uses has been significantly impaired by long-term and ongoing accumulation of sediment and sediment-borne nutrients from both public and private land within the watershed. This accumulation has resulted in reduced water depth, reduced water-holding capacity, reduced quality of the fishery, increased water turbidity, increased growth of undesirable algae, and increased cost of treating the water for municipal uses. Water quality projects undertaken in the past, notably the Lucas Lakes Project of the 1990s, made important progress in reducing sedimentation from privately-owned land higher in the watershed, but paid little attention to land owned by the City of Chariton immediately surrounding the lakes. A recent reassessment of gully erosion within the watershed shows serious, ongoing erosion on that City-owned land. This project proposes a two-part approach to improving the water quality in Lake Morris. First, we propose that a complement of five SolarBee water circulation devices be installed in Lake Morris to provide near-term and continuing improvements in water quality, by inhibiting cyanobacterial growth and thereby removing the need for treatment of the lakes with copper sulfate. Second, we propose the installation of erosion-control structures on primarily City-owned land surrounding the lake, to provide a major reduction in ongoing sedimentation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Summit Lake Watershed Improvement Project is a watershed-based sediment control project designed to greatly reduce to nearly eliminate sedimentation of an existing lake that is being renovated for use as a water source in southern Iowa. Summit Lake is owned by the City of Creston and was once a water source lake until around 1984. The watershed improvements will include lakeshore stabilization and erosion control practices as a precursor for related improvements to the lake and overall 4,900-acre watershed. Best practices included in this phase are the implementation of riprap, a rain garden, grade stabilization structures, grassed waterways, terraces, basins, water use and access ordinances, education and outreach, water monitoring, and other stream bank improvements. These improvements, along with leveraged work to be done by strategic partners, will enable the lake to be used for local and regional water supplies by sustaining the lake for many years to come. Without the lake rehabilitation, the lake will likely be filled with sedimentation to the point that it will have no recreational value. Key partners are the City of Creston, IDNR, Southern Iowa Rural Water Association, Union County, the Union County NRCS office, Southwestern Community College, and the Summit Lake Association, which is a non-profit group of landowners working to protect the lake. The project will address WIRB targets: a) streambank stabilization, b) livestock runoff, c) agricultural runoff and drainage, d) stormwater runoff, and e) a section of inadequately sewered community.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The North Fork Maquoketa River Headwaters (NFMRH) has been identified as impaired by nutrients, episodic slugs of ammonia and sediment. The NFMRH TMDL plan calls for a "phasing approach" to managing water quality when the origin is non-point source contaminants. This project will address phase 1 using a performance reward program for targeted cooperators to improve environmental index scores using cost-share, EQIP practices and flexible management alternatives. Pre-project assessments suggest that rewards should target refined management of erosion-prone fields and farms with livestock populations, which contribute to the P and N loads responsible for fertilizing filamentous algae blooms that depress dissolved oxygen concentrations in the NFMRH. The Phosphorus Index, Soil Conditioning Index and cornstalk nitrate test will be used by producers to determine effective alternatives, such as no-till planting, to reduce nutrient and sediment delivery. These evironmental indexes will be especially useful for livestock producers in the livestock dense watershed. This project will extend a NRCS-sponsored Conservation Innovation Grant currently offered to producers in the Coffee Creek sub-watershed to a three-year, watershed-wide effort that will be necessary to make significant improvements in environmental management.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report contains a general colored soil map of Boone County and information on the county's soil physiology, drainage and fertility. It also includes information on field experiments, rotation of crops, prevention of erosion, soil types and other vital soil information in Boone County.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This issue review provides an overview of funds dispersed for the soil and water conservation cost share program in the Department of Agriculture and Land Stewardship, DALS.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pavements constructed in Iowa during the period of the 1920's through the late 1940's were built with an integral curb. The purpose of the curb was to control drainage of water from the pavement surface in areas where runoff took place at a very rapid rate. It is for this reason that curbing is found on pavements constructed during this period. The curbing led the water flowing on the pavement surface to drainage outlets; this helped reduce erosion along the edge of the slab. The curbs have satisfactorily performed the job for which they were intended. The advent of bigger and faster vehicles has created a demand for changes in the design of pavements. Current designs provide wider driving surfaces with reduced grades which can better accommodate the wider cars and trucks. By present day design standards the narrow highways are inadequate and are being replaced or improved. The normal improvement procedure is to widen to 24 feet by providing additional driving surface at each edge of the pavement. Curbing is removed from the pavement so that the surface of the widening can be placed at the same level as that of the slab.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Reconstruction of bridge approach slabs which have failed due to a loss of support from embankment fill consolidation or erosion can be particularly challenging in urban areas where lane closures must be minimized. Precast prestressed concrete pavement is a potential solution for rapid bridge approach slab reconstruction which uses prefabricated pavement panels that can be installed and opened to traffic quickly. To evaluate this solution, the Iowa Department of Transportation constructed a precast prestressed approach slab demonstration project on Highway 60 near Sheldon, Iowa in August/September 2006. Two approach slabs at either end of a new bridge were constructed using precast prestressed concrete panels. This report documents the successful development, design, and construction of the precast prestressed concrete bridge approach slabs on Highway 60. The report discusses the challenges and issues that were faced during the project and presents recommendations for future implementation of this innovative construction technique.