590 resultados para fall 2005


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The safety benefit of signalizing intersections of high-speed divided expressways is considered. Analyses were conducted on 50 and 55 mph and on 55 mph only intersections, comparing unsignalized and signalized intersections. Results of the 55 mph analysis are included in this report. Matched-pair analysis indicates that generally, signalized intersections have higher crash rate but lower costs per crash. On the other hand, before-and-after analysis (intersections signalized between 1994 and 2001) indicates lower crash rates (~30 percent) and total costs (~10 percent) after signalization. Empirical Bayes (EB) adjusted before-and-after analysis reduces estimates of safety benefit (crash rate) to about 20 percent. The study shows how commonly used analyses can differ in their results, and that there is great variability in the safety performance of individual signalized locations. This variability and the effect of EB adjustment are demonstrated through the use of innovative graphics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Use of Reversions Report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Division of Criminal and Juvenile Justice Planning issued its first state legislation monitoring report in February 2002, covering the first six months’ impact of Senate File 543 (which enacted a number of sentencing changes) on the justice system; monitoring of the correctional impact of this bill was at the request of several members of the legislature. Since then, the Criminal and Juvenile Justice Planning Advisory Council has requested that CJJP monitor the correctional impact of enacted legislation of particular interest. This report covers monitoring results or future plans to monitor the following: 1. Changes in “crack” cocaine and “powder” cocaine penalties under Chapter 124.401 (effective FY2004; see p.3). 2. Commitments to prison involving manufacture, distribution, or possession of methamphetamine under Chapter 124.401 (see p.5). 3. Prosecution of offenders for child endangerment under Chapter 726.6(g) for permitting the presence of a child or minor at a location where a controlled substance manufacturing or a product possession violation occurs (see p.7). 4. Provision of an enhanced penalty for manufacturing of controlled substances under Chapter 124.401C when children are present and the offender is not charged under section 726.6(g) (see p. 7). 5. Creating a new offense when a retailer sells more than two packages of any product containing pseudoephedrine (chapter 126.23A) and providing for an enhanced penalty under Chapter 714.7C when a theft involves more than two packages of similar products (see p.8). 6. Establishment of parole eligibility at 70% of time served for persons sentenced under the “85% law” provisions of Iowa Code Section 902.12. (effective FY2005; see p. 9).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Appeal Activity in the Public Assistance Programs - December 2005

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report on the activities of the Department of Human Services Case Management Unit. The Iowa Department of Human Services Targeted Case Management Unit helps consumers with mental retardation, chronic mental illness, developmental disabilities and brain injury gain access to appropriate living environments, needed medical services, and interrelated social, vocational and educational service.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report on the activities of the Department of Human Services Case Management Unit. The Iowa Department of Human Services Targeted Case Management Unit helps consumers with mental retardation, chronic mental illness, developmental disabilities and brain injury gain access to appropriate living environments, needed medical services, and interrelated social, vocational and educational service. In 2005 the DHS Case Mangement Unit also begain serving children with a diagnosis of Serious Emotional Disturbance (SED).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Annual report for Iowa Railway Finance Authority. Annual Report produced by Iowa Department of Transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report evaluates the status of unemployment compensation trust fund as of December 31, 2005. The report reviews fund expenditures and fund revenue. It also discusses the fund solvency in terms of fund balance, fund balance adjusted for wage growth and months of benefits at recession levels.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

State Highway Departments and local street and road agencies are currently faced with aging highway systems and a need to extend the life of some of the pavements. The agency engineer should have the opportunity to explore the use of multiple surface types in the selection of a preferred rehabilitation strategy. This study was designed to look at the portland cement concrete overlay alternative and especially the design of overlays for existing composite (portland cement and asphaltic cement concrete) pavements. Existing design procedures for portland cement concrete overlays deal primarily with an existing asphaltic concrete pavement with an underlying granular base or stabilized base. This study reviewed those design methods and moved to the development of a design for overlays of composite pavements. It deals directly with existing portland cement concrete pavements that have been overlaid with successive asphaltic concrete overlays and are in need of another overlay due to poor performance of the existing surface. The results of this study provide the engineer with a way to use existing deflection technology coupled with materials testing and a combination of existing overlay design methods to determine the design thickness of the portland cement concrete overlay. The design methodology provides guidance for the engineer, from the evaluation of the existing pavement condition through the construction of the overlay. It also provides a structural analysis of various joint and widening patterns on the performance of such designs. This work provides the engineer with a portland cement concrete overlay solution to composite pavements or conventional asphaltic concrete pavements that are in need of surface rehabilitation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pavement settlement occurring in and around utility cuts is a common problem, resulting in uneven pavement surfaces, annoyance to drivers, and ultimately, further maintenance. A survey of municipal authorities and field and laboratory investigations were conducted to identify the factors contributing to the settlement of utility cut restorations in pavement sections. Survey responses were received from seven cities across Iowa and indicate that utility cut restorations often last less than two years. Observations made during site inspections showed that backfill material varies from one city to another, backfill lift thickness often exceeds 12 inches, and the backfill material is often placed at bulking moisture contents with no Quality control/Quality Assurance. Laboratory investigation of the backfill materials indicate that at the field moisture contents encountered, the backfill materials have collapse potentials up to 35%. Falling Weight Deflectometer (FWD) deflection data and elevation shots indicate that the maximum deflection in the pavement occurs in the area around the utility cut restoration. The FWD data indicate a zone of influence around the perimeter of the restoration extending two to three feet beyond the trench perimeter. The research team proposes moisture control, the use of 65% relative density in a granular fill, and removing and compacting the native material near the ground surface around the trench. Test sections with geogrid reinforcement were also incorporated. The performance of inspected and proposed utility cuts needs to be monitored for at least two more years.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Deterioration in portland cement concrete (PCC) pavements can occur due to distresses caused by a combination of traffic loads and weather conditions. Hot mix asphalt (HMA) overlay is the most commonly used rehabilitation technique for such deteriorated PCC pavements. However, the performance of these HMA overlaid pavements is hindered due to the occurrence of reflective cracking, resulting in significant reduction of pavement serviceability. Various fractured slab techniques, including rubblization, crack and seat, and break and seat are used to minimize reflective cracking by reducing the slab action. However, the design of structural overlay thickness for cracked and seated and rubblized pavements is difficult as the resulting structure is neither a “true” rigid pavement nor a “true” flexible pavement. Existing design methodologies use the empirical procedures based on the AASHO Road Test conducted in 1961. But, the AASHO Road Test did not employ any fractured slab technique, and there are numerous limitations associated with extrapolating its results to HMA overlay thickness design for fractured PCC pavements. The main objective of this project is to develop a mechanistic-empirical (ME) design approach for the HMA overlay thickness design for fractured PCC pavements. In this design procedure, failure criteria such as the tensile strain at the bottom of HMA layer and the vertical compressive strain on the surface of subgrade are used to consider HMA fatigue and subgrade rutting, respectively. The developed ME design system is also implemented in a Visual Basic computer program. A partial validation of the design method with reference to an instrumented trial project (IA-141, Polk County) in Iowa is provided in this report. Tensile strain values at the bottom of the HMA layer collected from the FWD testing at this project site are in agreement with the results obtained from the developed computer program.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Watershed Improvement Review Board was created by the Iowa Legislature and signed into law by the Governor in 2005 as Senate File 200. This statute is now codified in Iowa Code Chapter 466A. The fifteen-member board was appointed with the initial meeting being held August 22, 2005. Subsequent Board meetings were held October 10, December 2, and December 19. Attachment 1 lists the board members and their organization affiliation. The Board created a five-member subcommittee to develop and submit to the Board the Request for Applications (RFA) documents and procedural guidelines. These RFA documents were approved as modified on October 10, 2005.