599 resultados para Highway transportation


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing to improve the interstate system around Council Bluffs with improvements extending across the Missouri River on I-80 to east of the I-480 interchange in Omaha, Nebraska, see Figure 1-1. The study considers long-term, broad-based transportation improvements along I-80, I-29, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs. In 2001, Iowa DOT and FHWA initiated the Council Bluffs Interstate System (CBIS) Improvements Project. The agencies concluded that the environmental study process would be conducted in two stages; that is, a tiered approach would be applied. The project is being conducted pursuant to the National Environmental Policy Act (NEPA) regulations issued by the Council on Environmental Quality (CEQ), 40 Code of Federal Regulations (CFR) Part 1502.20, and FHWA 23 CFR Part 771.111, that permit tiering for large, complex NEPA studies. Tier 1 is an examination of the overall interstate system improvement needs, including a clear explanation of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation is at a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. Tier 1 includes preparation of a draft and final Environmental Impact Statement (EIS) that would disclose the potential environmental and social effects (evaluated at a planning level that considers a variety of conceptual designs) of the proposed improvements. The final EIS will conclude with a Record of Decision (ROD) that states the preferred plan for improvements to be implemented. Essentially, the Tier 1 document will establish the planning framework for the needed improvements. Because the scope of the overall system improvements is large, the interstate improvements would be implemented as a series of individual projects that fit into the overall planning framework. The Tier 1 Area of Potential Impact, which is discussed in detail in Section 4 is an alternative that considers a combination of the most reasonable concepts that have been developed, buffered by approximately 100 or more feet to ensure that any Tier 2 design modifications would remain inside the outer boundary.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This Tier 2 Environmental Assessment (EA) presents the results of studies and analyses conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility1 This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480). More information about the tiering process is found below under Project Background. • Section 1 provides background information on the Project and discusses the relationship between the earlier Tier 1 EIS and this Tier 2 EA. It also discusses the proposed action and the area studied, the purpose of the Project, and the need for the Project based on transportation problems that currently exist or are expected in the future. • Section 2, Alternatives, identifies the range of alternatives considered for Segment 3 to address the transportation problems identified in Section 1. It also identifies the alternatives retained for further study in this EA and the preferred Segment 3 alternative. • Section 3, Affected Environment and Environmental Consequences, describes the general environment for each resource affected by the proposed improvements. It also describes the potential environmental impacts of the Segment 3 Project and methods to avoid, minimize, and mitigate impacts. • Section 4, Disposition, lists the agencies and organizations that will receive copies of this EA and the locations at which this EA will be available for public review. • Section 5, Comments and Coordination, summarizes the agency coordination and public involvement efforts in conjunction with the Segment 3 Project. • Section 6, Conclusion and Recommendation, summarizes resource impacts. • Section 7, References, lists the sources cited in this EA. For Segment 3, the Federal Highway Administration (FHWA) and Iowa Department of Transportation (Iowa DOT) determined that an EA is the appropriate level of Tier 2 study to comply with the National Environmental Policy Act (NEPA) requirements. The primary purpose of an EA is to clearly establish the significance of a project’s environmental impacts. That analysis is included in this document.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Program from the dedication ceremony of the new U.S. 61 between Interstate 80 and U.S. 30 near De Witt. This section provides motorists with a safe and convenient four-lane highway.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT), Nebraska Department of Roads (NDOR), and the Federal Highway Administration (FHWA) are proposing improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 (I-80) to east of the Interstate 480 (I-480) interchange in Omaha, Nebraska (see Figure 1-1). The study considers long-term, broad-base transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system1, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. These improvements, once implemented, would bring the segments of I-80 and I-29 up to current engineering standards and modernize the roadway to accommodate future traffic needs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Greene County, Iowa overlay project, completed in October 1973, was inspected on October 16 & 17, 1978 After five years of service The 33 fibrous concrete sections, four CRCP sections, two mesh reinforced and two plain concrete sections with doweled reinforcement were rated relative to each other on a scale of 0 t o 100. The rating was conducted by the original members of the Project Planning Committee, Iowa DOT, Iowa Counties, Federal Highway Administration, University of Illinois and industry representatives . In all , there were 23 representatives who rated this project . The 23 values were then averaged to provide a final rating number for each section. The highest panel rating (90) was assigned to the 5-inch thick , deformed barre in forced PCC sections ; an 86t o a 3-inch thick , 160 lbs. of fiber and 600 lbs . of cement on a partial bonded surface ; an 84 to the 4-inch CRC with elastic joints (bonded) and an 84 to a 4-inch mesh reinforce section. One of the major factors influencing performance appears t o be the thickness. In the fibrous concrete overlay, The greatest influences appears t o be the fiber content. Overlay Sections containing 160 1b/yd3 of Fiber are, in almost all cases , outperforming those c o n t a i n i n g 60 or 100. It is obvious at This time meth at the 3-inch thick fibrous concrete overlays are, in general, out performing the 2-inch thick sections. The performance of the fibrous concrete the overlay appears to be favorably influenced by: (1) The use of higher a spectra fiber (0.025 x 2.5 i n c h e s ) v e r s u s (0.010 x 0.022 x 1.0 inches) (2) The use of a lower cement c o n t e n t ( 600 versus 750 1b/yd3) However, The set less well defined and the improvements in overlay performance attributed to high aspect ratio fibers and low cement contents.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Tort claims resulting from alleged highway defects have introduced an additional element in the planning, design, construction, and maintenance of highways. A survey of county governments in Iowa was undertaken in order to quantify the magnitude and determine the nature of this problem. This survey included the use of mailed questionnaires and personal interviews with County Engineers. Highway-related claims filed against counties in Iowa amounted to about $52,000,000 during the period 1973 through 1978. Over $30,000,000 in claims was pending at the end of 1978. Settlements of judgments were made at a cost of 12.2% of the amount claimed for those claims that had been disposed of, not including costs for handling claims, attorney fees, or court costs. There was no clear time trend in the amount of claims for the six-year period surveyed, although the anount claimed in 1978 was about double the average for the preceding five years. Problems that resulted in claims for damages from counties have generally related to alleged omissions in the use of traffic control devices or defects, often temporary, resulting from alleged inadequacies in highway maintenance. The absence of stop signs or warning signs often has been the central issue in a highway-related tort claim. Maintenance problems most frequently alleged have included inadequate shoulders, surface roughness, ice o? snow conditions, and loose gravel. The variation in the occurrence of tort claims among 85 counties in Iowa could not be related to any of the explanatory variables that were tested. Claims hppeared to have occurred randomly. However, using data from a subsample of 11 counties, a significant relationship was shown probably to exist between the amount of tort claims and the extensiveness of use of wcirning signs on the respective county road systems. Although there was no indication in any county that their use of warning signs did not conform with provisions of the Manual on Uniform Traffic Control Devices (Federal Highway Administration, Government Printing Office, Washington, D.C., 1978), many more warning signs were used in some counties than would be required to satisfy this minimum requirement. Sign vandalism reportedly is a problem in all counties. The threat of vandalism and the added costs incurred thereby have tended to inhibit more extensive use of traffic control devices. It also should be noted that there is no indication from this research of a correlation between the intensiveness of sign usage and highway safety. All highway maintenance activities introduce some extraordinary hazard for motorists. Generally effective methodologies have evolved for use on county road systems for routine maintenance activities, procedures that tend to reduce the hazard to practical and reasonably acceptable levels. Blading of loose-surfaced roads is an examples such a routine maintenance activity. Alternative patterns for blading that were investigated as part of this research offered no improvements in safety when compared with the method in current use and introduced a significant additional cost that was unacceptable, given the existing limitations in resources available for county roads.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research project HR-219 was sponsored by the Iowa Highway Research Board and the Iowa Department of Transportation. The funding authorized from the Primary Road Research Fund was $11,200. The author wishes to express his appreciation to Iowa DOT personnel for their participation in the research. The special features were incorporated into the plans by Road Design personnel. Office of Materials personnel developed the proportions for the flowable mortar. Project inspection was provided by the Creston Resident Engineer and his staff. The excellent cooperation of the contractors contributed to the success of the research. The prime contractor was Irving F. Jensen Company, Inc. of Sioux City, Iowa who retained Reilly Construction Company of Ossian, Iowa and GNA Concrete, Inc. of Grimes, Iowa as subcontractors for the special culvert backfilling.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The MTC’s main focus is on education and human capital. This focus is in recognition of the fact that the transportation industry, both public and private, in the region served by the MTC faces a serious shortage of well-trained human capital. For this reason, the MTC is in volved in creating totally new transportation education programs at two of its member universities. The University of Northern Iowa (UNI) in Cedar Falls Iowa had no courses or students in transportation when the MTC grant began. During the first year of the grant, UNI’s Geography Department took the lead in developing courses, attracting students, an getting involved a a partner in transportation activities in its service region. A similar start-up effort is now underway at Lincoln University in Jefferson City, Missouri. The MTC has also been able to strengthen and add quality to transportation education efforts at universities in the region that were already leaders in transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The MTC’s main focus is on education and human capital. This focus is in recognition of the fact that the transportation industry, both public and private, in the region served by the MTC faces a serious shortage of well-trained human capital. For this reason, the MTC is in volved in creating totally new transportation education programs at two of its member universities. The University of Northern Iowa (UNI) in Cedar Falls Iowa had no courses or students in transportation when the MTC grant began. During the first year of the grant, UNI’s Geography Department took the lead in developing courses, attracting students, an getting involved a a partner in transportation activities in its service region. A similar start-up effort is now underway at Lincoln University in Jefferson City, Missouri. The MTC has also been able to strengthen and add quality to transportation education efforts at universities in the region that were already leaders in transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The MTC’s main focus is on education and human capital. This focus is in recognition of the fact that the transportation industry, both public and private, in the region served by the MTC faces a serious shortage of well-trained human capital. For this reason, the MTC is in volved in creating totally new transportation education programs at two of its member universities. The University of Northern Iowa (UNI) in Cedar Falls Iowa had no courses or students in transportation when the MTC grant began. During the first year of the grant, UNI’s Geography Department took the lead in developing courses, attracting students, an getting involved a a partner in transportation activities in its service region. A similar start-up effort is now underway at Lincoln University in Jefferson City, Missouri. The MTC has also been able to strengthen and add quality to transportation education efforts at universities in the region that were already leaders in transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Midwest Transportation Consortium (MTC) recently completed its sixth year of operation. The MTC has become an established portion of the research and educational programs at ISU and its partner universities. The MTC continues to emphasize its primary focus of developing human capital. For example, this semester, Fall, 2005, ISU has graduate scholars in its educational program. However, we also recognize that the federal grant is an opportunity to build programs at our respective universities that continue after the U.S. DOT UTCP may end. An example of building a long lasting program is the University of Missouri – St. Louis’ (UMSL) and its development of a transportation Ph.D. program in their business college. Admittedly, this program could have been started regardless, but Dr. Ray Mundy, Director of UMSL’s Transportation Scholars Program, believes that the MTC support of the transportation educational program at UMSL was the essential component in establishing a Ph.D. program. At ISU, the MTC has been instrumental in establishing two research and outreach programs, and both have themes that are related to the MTC’s theme of “Transportation System Management and Operation.” The Center for Weather Impacts on Mobility and Safety (C-WIMS) was recently established, and the Center for Road Infrastructure Management and Operations (RIMO) is in the process of being established. The MTC has a critical role in establishing each of these two programs. As part of the on-going MTC program, we have established an effective network that promotes the education of future transportation professionals and the development of new knowledge on how to manage transportation infrastructure and services in a more sustainable manner. The MTC has a track record of developing outstanding students; these students are now becoming leaders in the private sector, government, and academia. The MTC has also supported the development of an extensive research portfolio related to sustainable transportation asset management. More research projects are in the pipeline. Finally, the MTC has dedicated itself to the dissemination of asset management research results through an ongoing technology transfer program. This document provides a progress for the latest fiscal year of operation of the MTC, which ran from October 2004 through September 2005.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Midwest Transportation Consortium (MTC) recently completed its sixth year of operation. The MTC has become an established portion of the research and educational programs at ISU and its partner universities. The MTC continues to emphasize its primary focus of developing human capital. For example, this semester, Fall, 2005, ISU has graduate scholars in its educational program. However, we also recognize that the federal grant is an opportunity to build programs at our respective universities that continue after the U.S. DOT UTCP may end. An example of building a long lasting program is the University of Missouri – St. Louis’ (UMSL) and its development of a transportation Ph.D. program in their business college. Admittedly, this program could have been started regardless, but Dr. Ray Mundy, Director of UMSL’s Transportation Scholars Program, believes that the MTC support of the transportation educational program at UMSL was the essential component in establishing a Ph.D. program. At ISU, the MTC has been instrumental in establishing two research and outreach programs, and both have themes that are related to the MTC’s theme of “Transportation System Management and Operation.” The Center for Weather Impacts on Mobility and Safety (C-WIMS) was recently established, and the Center for Road Infrastructure Management and Operations (RIMO) is in the process of being established. The MTC has a critical role in establishing each of these two programs. As part of the on-going MTC program, we have established an effective network that promotes the education of future transportation professionals and the development of new knowledge on how to manage transportation infrastructure and services in a more sustainable manner. The MTC has a track record of developing outstanding students; these students are now becoming leaders in the private sector, government, and academia. The MTC has also supported the development of an extensive research portfolio related to sustainable transportation asset management. More research projects are in the pipeline. Finally, the MTC has dedicated itself to the dissemination of asset management research results through an ongoing technology transfer program. This document provides a progress for the latest fiscal year of operation of the MTC, which ran from October 2004 through September 2005.