500 resultados para Land Consultative Board
Resumo:
Miller Creek, a 19,926 acre watershed, is listed on the 2008 Section 303d Impaired Waters List. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to nutrient and sediment delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. The WIRB board provided implementation grant funds in 2010 for a three year project to treat targeted areas of 5 tons per acre or greater soil loss with an estimated reduction of 2,547 tons. As of December 1, 2012, with 95% of the funds allocated, the final results are estimated to provide a sediment delivery reduction of 4,500 tons and an estimated phosphorus reduction of 5,700 lbs per year. These accomplishments and the completion of the three year Miller Creek WIRB project represent "Phase I" of the SWCD's goals to treat the Miller Creek watershed. This application represents "Phase II" or the final phase of the Miller Creek water quality project. The Monroe SWCD plans to reduce sediment delivery by 70% on an additional 245 acres of priority land. This goal will be accomplished through installation of strategically placed structural practices, BMPs, and grazing systems. These practices will reduce soil loss, nutrient runoff, and sediment delivery as well as improve water quality and wildlife habitat in the watershed. Utilization of partnerships with NRCS and IDALS-DSC will continue to be an important part to the success of the project. Project goals will be achieved by utilizing matching funds from EQIP, and the Monroe SWCD has approved the use of District IFIP cost share funds specifically for use in the Miller Creek Watershed.
Resumo:
The city of Elliott has had an increase in nitrate levels in their community water supply located in the Coe Creek Watershed. They have been working with the IDNR Source Water Protection (SWP) Programs to conduct site investigations and have formed a SWP Planning Team. This Team has been reviewing the investigation findings, formed an action plan and studied different Best Management Practices (BMPs). After considering the BMPs the SWP Team made a recommendation to the Elliott City Council which included native grass seeding and a shallow water wetland. The Team also held an informational meeting for the citizens of Elliott. The goal of this meeting was to inform and educate the public of the Team findings and BMPs. The Elliott City Council approved the restoration of a shallow wetland with a native grass buffer. This whole project is 27 acres and includes a shallow water wetland with native grass buffer. This would be a long term method to reduce nitrates in the city wells. Elliott is partnering with the Natural Resources Conservation Service, Montgomery County Soil and Water Conservation District, Pheasants Forever, the Montgomery County Conservation Board, US Fish and Wildlife Service and the Montgomery County Board of Supervisors in the restoration of the shallow water wetland and native grass buffer.
Resumo:
A water quality resource concern has come to the forefront in the Upper Miller Creek watershed in Black Hawk County after five to seven inches of rain fell on the area on May 22nd and 23rd of 2004 and unprecedented amounts of soil and organic debris were washed from cultivated areas, clogging most culverts and roadside ditches. The quantity of soil deposited in ditches gave a good indication of the amounts that were transported into the stream. The estimated total cost to Black Hawk County for cleanup and repair within the road right-of-way was $345,000. There were undetermined environmental costs incurred when the incredibly high volumes of soil washed from the fields into Miller Creek which flows directly into the Cedar River that is identified by the Department of Natural Resources as an impaired water body. The Upper Miller Creek Watershed Project is an innovative, collaborative project intended to meet a specific need identified by a local steering committee made up of concerned community agencies and local landowners. Led by the Soil and Water Conservation District and the Black Hawk County Board of Supervisors, the Miller Creek Watershed Project seeks to reduce soil erosion, improve water quality, and reduce county road infrastructure cost by implementing conservation practices, reducing nutrient and pesticide use and improving wildlife habitat.
Resumo:
The Watershed Improvement Review Board (WIRB) Grant will be used to enhance an on-going water quality project in Elk River Watershed. A targeted, locally controlled project has been active in the watershed since 2001. Current funding is being received primarily from the EPA-319 program, administrated by IDNR and the Watershed Protection Fund (WSPF) administrated by IDALS-DSC. Substantial funding is also obtained from the yearly county allocation of the Environmental Quality Incentive Program (EQIP) administrated by the USDA-NRCS. The overall objective of the Elk River Water Quality Project is to improve and restore the water quality in this water body by keying in on the potential sources of the identified impairments, and forging a working partnership between the local residents and the conservation agencies and organizations involved in the project. The major potential sources of the known surface water quality problems were identified during the assessment process and pointed to feedlot runoff and sediment delivery from within priority sub-watersheds. WIRB Funds will be used to cost share the application of Best Management Practices, thus reducing the projects dependency on federal funds. Funds will also be used to overcome a project’s limiting factor associated with insufficient technical assistance.
Resumo:
Lake Macbride is considered to be one of the top four lakes for fishing in the state of Iowa. It is widely used by the public and contributes significant economic benefits to the county. Lake Macbride is situated in the North Corridor which is one of the fastest growing areas in the state. The lake has a surface area of 940 acres and drains 16,205 acres. Lake Macbride is on the Iowa 303(d) list for excessive sediments and nutrients. In 2001, Lake Macbride State Park received over 2.5 million dollars from the Marine Fuel Tax and Fish and Wildlife Trust to install 2 silt basins and stabilize over 12 miles of shoreline in the lake. Also in 2001, the Johnson County SWCD received a WSPF allocation from DSC to address agriculture and urban runoff issues in the watershed. Section 319 funding was received in 2002 to continue watershed efforts to the present. A watershed assessment was completed in 2003 to guide watershed activities. In 2005, a TMDL was completed for the lake. Since 2001, over $645,000 dollars has been spent by landowners and funding partners to install conservation practices in the watershed. Watershed efforts have resulted in the reduction of over 4200 tons of soils from being delivered into Lake Macbride. Nutrient reductions have also occurred from the development of nutrient management plans on 2000 acres. The District is in the process of wrapping up watershed efforts on private land. A series of 13 structures is planned to be installed in the State Park over the next several years. One of the last remaining items that still needs addressed is 1,400 feet of eroding shoreline adjacent to Lake Macbride along Cottage Reserve Road. The road is under the jurisdiction of the Johnson County Board of Supervisors. Both the Board of Supervisors and the IDNR are willing to contribute substantial dollars to address the 250 tons of soil that are being directly delivered to Lake Macbride each year.
Resumo:
Manteno Lake is located 8 miles northwest of Earling, IA in Shelby County. The lake has been impaired with an overload of silt and nutrients. In October of 2007, land directly north of the lake will be coming out of CRP and back into agricultural production. The Shelby Soil and Water Conservation District, Shelby County Board of Supervisors and Shelby County Conservation Board feel strongly that treatment of this area is necessary prior to the CRP contract expiring. The placement and construction of three structures will reduce the amount of silt and nutrients affecting Manteno Lake. This project calls for the construction of three structures on crucial tributaries to the lake.
Resumo:
With WIRB funding the Fox River Ecosystem Development board will continue to install prioritized practices identified by assessments within the impaired segment of Fox River. The FRED board is also asking to continue funding for a new 5 year position for assessment, planning and technical assistance. With new assessments and water quality monitoring already being done on the impaired segment of the Fox River a lot of valuable information is at hand. Ecosystem Development board is requesting funding from WIRB to install grade stabilization structures, water sediment basins, and terraces to reduce sediment delivery to Fox River. The FRED board in both Iowa and Missouri are committed not only to seek funding to continue water quality efforts for more practices but also to enhance and protect existing practices and investments that protect our water quality and economic viability in both states. We are off to a good start and want to continue our progress on the Fox River.
Resumo:
Report on the Peace Officers’ Retirement, Accident and Disability System, Schedule of Employer Pension Amounts required to implement Governmental Accounting Standards Board (GASB) Statement No. 68, Accounting and Financial Reporting for Pensions for the year ended June 30, 2015
Resumo:
This report highlights the services the IUB provided to Iowans, along with results achieved to ensure reliability, and to improve and expand utility service infrastructure in Iowa. This information is provided in accordance with the State of Iowa Accountable Government Act, Iowa Code chapter 8E. The two basic business functions of the IUB are utility regulation and compliance, and resource management. This report covers performance information for both of these areas.
Resumo:
Agency Performance Plan for Iowa Utilities Board
Resumo:
The plan is prepared in compliance with Executive Order Number Nine, issued September 14, 1999. Section IV of that order defines a “regulatory action” as a potential rule that is currently under active consideration or development with the agency that the agency reasonably expects to issue in proposed or final form.
Resumo:
This report, entitled Iowa Highway Research and Development Activities FY 2015, is submitted in compliance with Iowa Code section 310.36 and 312.3A, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in process on June 30, 2015. It is also a report on projects completed during the fiscal year beginning July 1, 2014 and ending June 30, 2015. Detailed information on each of the research and development projects mentioned in this report is available from the office of Research and Analytics, Performance and Technology Division, Iowa Department of Transportation. All approved reports are also online for viewing at http://www.iowadot.gov/research/pdf/IHRBAnnualReport.pdf.
Resumo:
Iowa Plumber, Mechanical Professional, and Contractor Licensing Board (PMB) submits the following annual budget report to the Iowa State Legislature. Iowa Code 105.9 requires the board to demonstrate that revenues remain within 10% of expenditures over a period of at least three years
Resumo:
Iowa Plumber, Mechanical Professional, and Contractor Licensing Board (PMB) submits the following annual budget report to the Iowa State Legislature. Iowa Code 105.9 requires the board to demonstrate that revenues remain within 10% of expenditures over a period of at least three years
Resumo:
This is the annual appropriations report submitted on behalf of the Watershed Improvement Review Board (WIRB).