461 resultados para Pavements, Mosaic.


Relevância:

10.00% 10.00%

Publicador:

Resumo:

What follows are the refined guidelines from the Thin Maintenance Surface: Phase II Report. For that report, test sections were created and monitored along with some existing test sections. From the monitoring and evaluation of these test sections, literature reviews, and the experience and knowledge of the authors, the following guidelines were created. More information about thin maintenance surfaces and their uses can be found in the above-mentioned report.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This research project was initiated in 1988 to study the effectiveness of four different construction techniques for establishing a stable base on a granular surfaced roadway. After base stabilization, the roadway was then seal coated, eliminating dust problems associated with granular surfaced roads. When monies become available, the roadway can be surfaced with a more permanent structure. A 2.8 mile section of the Horseshoe Road in Dubuque County was divided into four divisions for the study. This report discusses the procedures used during construction of these different divisions. Problems and possible solutions have been analyzed to better understand the capabilities of the materials and construction techniques used on the project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Two lanes of a major four lane arterial street needed to be reconstructed in Cedar Rapids, Iowa. The traffic volumes and difficulty of detouring the traffic necessitated closure for construction be held to an absolute minimum. Closure of the intersections, even for one day, was not politically feasible. Therefore, Fast Track and Fast Track II was specified for the project. Fast Track concrete paving has been used successfully in Iowa since 1986. The mainline portion of the project was specified to be Fast Track and achieved the opening strength of 400 psi in less than twelve hours. The intersections were allowed to be closed between 6 PM and 6 AM. This could occur twice - once to remove the old pavement and place the base and temporary surface and the second time to pave and cure the new concrete. The contractor was able to meet these restrictions. The Fast Track II used in the intersections achieved the opening strength of 350 psi in six to seven hours. Two test sections were selected in the mainline Fast Track and two intersections were chosen to test the Fast Tract II. Both flexural and compression specimens were tested. Pulse velocity tests were conducted on the pavement and test specimens. Maturity curves were developed through monitoring of the temperatures. Correlations were performed between the maturity and pulse velocity and the flexural strengths. The project was successful in establishing the feasibility of construction at night, with no disruption of traffic in the daytime, using fast Track II. Both the Fast Track II pavements were performing well four years after construction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The objective of this research project was to evaluate the construction and service performance of ammonium phosphate/fly ash (APFA) treated base courses of crushed fines and/or unprocessed sand. Specific test results related to construction of the test sections were included in the 1987 construction report by Iowa State University. The performance of the experimental sections is dealt with in this final report. This 1986 project demonstrated that in all cases the control sections utilizing a Type B base experienced dramatically less cracking in the surface than the APFA treated base sections. The cost per mix and subsequent surface maintenance costs for the APFA base sections, especially those having a substantial amount of limestone, were higher than the Type B base control sections. This type of construction may prove to be economical only when petroleum product costs escalate.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project was undertaken to study the relationships between the performance of locally available asphalts and their physicochemical properties under Iowa conditions with the ultimate objective of development of a locally and performance-based asphalt specification for durable pavements. Physical and physicochemical tests were performed on three sets of asphalt samples including: (a) twelve samples from local asphalt suppliers and their TFOT residues, (b) six core samples of known service records, and (c) a total of 79 asphalts from 10 pavement projects including original, lab aged and recovered asphalts from field mixes, as well as from lab aged mixes. Tests included standard rheological tests, HP-GPC and TMA. Some specific viscoelastic tests (at 5 deg C) were run on b samples and on some a samples. DSC and X-ray diffraction studies were performed on a and b samples. Furthermore, NMR techniques were applied to some a, b and c samples. Efforts were made to identify physicochemical properties which are correlated to physical properties known to affect field performance. The significant physicochemical parameters were used as a basis for an improved performance-based trial specification for Iowa to ensure more durable pavements.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report is a brief overview of the recent Iowa Department of Transportation research in the area of durability of Portland cement, concrete under the direction of Wendeli Dubberke. Present plans are to publish a more detailed report on low Portland cement concrete- durability research in January, 1985.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa road system has approximately 13,000 miles of Portland Cement Concrete Pavements, many of which are reaching the stage where major rehabilitation is required. Age, greater than anticipated traffic, heavier loads and deterioration related to coarse aggregate in the original pavement are some of the reasons that these pavements have reached this level of distress. One method utilized to rehabilitate distressed or underdesigned PCC pavements is the thin bonded Portland Cement Concrete overlay. Since the introduction of thin bonded overlays on highway pavements in 1973, the concrete paving industry has made progress in reducing the construction costs of this rehabilitation technique. With the advent of the shotblast machine, surface preparation costs have decreased from over $4.00 per square yard to most recently $1.42 per square yard. Other construction costs, including placement, grouting and sawing, have also declined. With each project, knowledge and efficiency have improved.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The concept of rubblizing existing concrete pavement prior to the placement of an asphaltic cement concrete overlay has been around for several years and, in fact, has been tried successfully in the states of New York, Michigan, and Ohio. With available construction and maintenance dollars usually not meeting the demands of the needed work, much of the necessary rehabilitation of existing Portland cement concrete pavements is not being completed when it would be most beneficial. Research project HR-315, "Iowa Development of Rubblized Concrete", has been undertaken to determine the effects of rubblized concrete pavement base as it affects the cracking pattern and longevity of the ACC overlay.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Portland Cement Concrete (PCC) pavement has served the State of Iowa well for many years. The oldest Iowa pavement was placed in LeMars in 1904. Beginning in 1931, many miles of PCC pavement were built to "get out of the mud.” Many of these early pavements provided good performance without deterioration for more than 50 years. In the late 1950's, Iowa was faced with severe PCC pavement deterioration referred to as D cracking. Research identified the cause of this deterioration as crushed limestone containing a bad pore system. Selective quarrying and ledge control has alleviated this problem. In 1990, cracking deterioration was identified on a three year old pavement on us 20 in central Iowa. The coarse aggregate was a crushed limestone with an excellent history of performance in PCC pavement. Examination of cores showed very few cracks through the coarse aggregate particles. The cracks were predominately confined to the matrix. The deterioration was identified as alkali-silica reactivity (ASR) by a consultant.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The objectives were to determine the feasibility and performance of this type of construction and to determine if the macadam base is effective in reducin9or eliminating D-cracking deterioration.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The object of this research project is to construct and evaluate several bituminous concrete base overlays with various high penetration bituminous products which have the potential to reduce future maintenance and construction costs. In September of 1981 nine different bituminous test sections were constructed on Osceola County roads A-34 and A-46 east of Ashton. Asphalt binders used were AC-5 asphalt cement, SC-800 liquid asphalt, MC-3000 cutback asphalt, CSS-1 emulsion and HFMS-2 emulsion. Aggregate for four of the test sections consisted of salvaged bituminous pavement and new aggregate combined. Each section was road mixed using a different binder arid placed 2-1/4" thick with a motor patrol. The other five test sections consisted of an AC-5 Type B asphalt concrete control section and four plant-mixed, cold-laid bituminous concrete overlay sections using new aggregate. The material was mixed in a continuous drum mix plant and laid with a full width paver.