49 resultados para stream sediment


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Silver Creek is a warm water stream resource located in one of the most intensely cropped portions of Clayton County. The stream has been included on Iowa’s 303(d) list of impaired waters since 2002. Aquatic life, which should be present in Silver Creek, isn’t there. According to the Draft Total Maximum Daily Load (TMDL) for Silver Creek, the primary nonpoint pollution sources are soil erosion from agricultural land uses and direct deposition of ammonia by livestock with access to the stream. The Clayton Soil & Water Conservation District has begun efforts to remove Silver Creek from the impaired waters list. The District has promoted stream corridor and sinkhole protection, and the installation of buffer practices along Silver Creek and its tributaries. Conservation practices have been targeted to crop fields to reduce sediment delivery to the stream. A series of news articles, newsletters, and field days have been utilized to increase public understanding of water quality issues. Landowner interest has outweighed available cost share resources. Additional financial support will allow the project to build upon its early successes, to further address the identified impairments, and to respond to a long list of landowners that are interested in conservation work on their farms.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Miller Creek is on the 2006 Section 303d Impaired Waters List and has a 19,926 acre watershed. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to sediment and nutrient delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. In an effort to control these problems, the Miller Creek Water Quality Project will target areas of 5 tons per acre or greater soil loss or with 0.5 tons per acre or greater sediment delivery rates. The assessment revealed these targeted priority lands make up 32% or 6,395 acres of the Miller Creek watershed. Priority lands include cropland, pasture land, timber, and sensitive riparian areas. It is the goal of this project to reduce sediment delivery by 70% on 60% or 3,837 acres of these priority lands. This will be accomplished through installation of strategically placed structural practices, rotational grazing systems, and buffer strips. These practices will reduce soil loss, reduce sediment delivery, improve water quality, and improve wildlife habitat in the watershed. Utilizing partnerships with NRCS and IDALS-DSC will be important in making this project successful. In addition to using matching funds from EQIP, WHIP, and CRP, the Monroe SWCD is committed to prioritizing local cost share funds through IFIP and REAP for use in the Miller Creek Watershed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 2004, Walnut Creek was placed on the 303d list of Impaired Waters due to a low biotic index (lack of aquatic life) during IDNR stream sampling events. Sediment originating from agriculture, streambank erosion, and channelization were listed as the most likely sources impacting aquatic life. In an effort to address these concerns, a preliminary study was completed of the multi-county watershed to identify priority areas. A Watershed Development & Planning Assistance Grant was then funded by the IDALS-DSC to conduct a detailed assessment of these prioritized sub-watersheds. The impending assessment of the watershed and the stream corridor revealed ample opportunities to address gully, sheet and rill erosion while addressing in-stream water velocity issues that plagued the riparian corridor. A comprehensive plan was developed comprised of a variety of best management practices to address the identified concerns. In 2009, this plan was submitted to the WIRB Board by the East Pottawattamie and Montgomery SWCDs and $489,455 was awarded to address concerns identified during watershed assessment inquiries. Despite adverse weather conditions, which has hampered conservation construction recently, this project has held fast to pre-project goals due to the fortitude of the project sponsors and the overwhelming participation by the watershed landowners. Unfortunately, state budget shortfalls are bringing project progress to a halt. As specified in the original WIRB funding request, practice funding for Year 3 was to come from the Division of Soil Conservation’s Watershed Protection Fund (WSPF). Due to Iowa’s budgetary restraints, the Walnut Creek WSPF application, which was submitted this spring, was not funded since no new applications in the state were funded. If funded again, this grant will serve as the critical step in continuing what is destined to be a true watershed success story.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Yellow River Headwaters Watershed (YRHW) drains 26,730 acres of rural land within Winneshiek and Allamakee Counties. While portions of the river have been designated as a High Quality Resource by the State of Iowa, other portions appear on the State's 303(d) List of Impaired Waters due to excessive nutrients, sediment and other water quality issues. The Winneshiek SWCD was fortunate enough to secure WSPF/WPF funds for FY2009 to begin addressing many of the sources of the identified problems, especially along the all-to-critical stream corridor. Initial landowner I producer interest has exceeded expectations and several key BMPs have been installed within the identified critical areas. Yet due to the current budget constraints in the WSPF/WPF programs, we currently have greater landowner I producer interest than we do funds, which is why the District is applying for WIRB funding, to provide supplemental incentives to continue the installation of needed Grade Stabilization Structures, Terraces and Manure Management Systems in identified critical areas. Other funding, currently available to the District, will cover the remaining portions of the project's budget, including staff and our outreach efforts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project would construct a sediment basin on the main inlet stream to Swan Lake, an impaired waterbody currently on the 303(d) list. This project is one of the highest priorities in our Watershed Management Plan. According to STEPL modeling, it would sequester over 1/3 of the total phosphorus (the pollutant of main concern) coming into the lake.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Miller Creek, a 19,926 acre watershed, is listed on the 2008 Section 303d Impaired Waters List. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to nutrient and sediment delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. The WIRB board provided implementation grant funds in 2010 for a three year project to treat targeted areas of 5 tons per acre or greater soil loss with an estimated reduction of 2,547 tons. As of December 1, 2012, with 95% of the funds allocated, the final results are estimated to provide a sediment delivery reduction of 4,500 tons and an estimated phosphorus reduction of 5,700 lbs per year. These accomplishments and the completion of the three year Miller Creek WIRB project represent "Phase I" of the SWCD's goals to treat the Miller Creek watershed. This application represents "Phase II" or the final phase of the Miller Creek water quality project. The Monroe SWCD plans to reduce sediment delivery by 70% on an additional 245 acres of priority land. This goal will be accomplished through installation of strategically placed structural practices, BMPs, and grazing systems. These practices will reduce soil loss, nutrient runoff, and sediment delivery as well as improve water quality and wildlife habitat in the watershed. Utilization of partnerships with NRCS and IDALS-DSC will continue to be an important part to the success of the project. Project goals will be achieved by utilizing matching funds from EQIP, and the Monroe SWCD has approved the use of District IFIP cost share funds specifically for use in the Miller Creek Watershed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Big Bear Creek is the upper portion of Bear Creek which drains 26,734 acres and ends at the Highway 136 crossing of Bear Creek. Bear Creek flows into the section of the Maquoketa River, which is on the EPA’s 303(d) List of Impaired Waters. Monitoring by the Iowa DNR indicates that Bear Creek is contributing significant amounts of sediment and nutrients to the Maquoketa River. The primary use of land in the Big Bear Creek Watershed is row crop production. A roadside survey completed by Anamosa Field Office Staff indicated that 123,747 tons/yr. of sediment was being lost due to sheet and rill erosion only. The sediment delivered to Big Bear Creek is 24,447 tons/yr. Based on this data, 34,226 lbs. of Phosphorus is reaching the stream per year. With the added amount of sediment and phosphorus delivery through gully and streambank erosion, one can clearly see that the water quality in Bear Creek is severely impaired. The Big Bear Watershed Project will work to reduce the sediment and phosphorus delivered to the stream by 30% through the installation of practices that trap sediment and reduce erosion.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Bear Creek is an impaired warm water fishery designated as class B(LR) by the Iowa DNR and is on 303 impaired waters list for fish kills and ammonia. Bear Creek is located in eastern Delaware County. This project is designed to improve the water quality of Bear Creek by educating the landowners, operators and watershed community about the importance of this water resource. The goal of the Bear Creek Watershed Project is to improve the water quality of Bear Creek by reducing the amounts of ammoniated manure discharge, fecal coliform bacteria, sediment, nitrogen, and phosphorous. The Bear Creek Watershed Project has been a watershed project since July 2004, first as a Demo project FY 2004-2005 and then full time WSPF/319 project FY06-09. Fish kills have not occurred in 2008-2009. Sediment delivery has decreased in the Bear Creek Watershed by 5,328 tons per year. The objectives of this watershed project will be to improve Livestock Waste Storage, to improve Livestock Waste Usage, to decrease Sediment Losses, and to improve Education & Area Outreach. This project will install 2 manure storage structures (EQIP/project funded), 19 ac of CRP waterways, 12 ac of project waterways, 17 ac of CRP filter strips along stream, 12 water and sediment control basins, 18,000 ft of terraces, 350 ac of new notill planting, and 3,700 ft of streambank protection.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sand Creek is the most significant recreational fishery in Delaware County because of its location to Manchester and Lake Delhi. It is a feeder stream for game fish to the main stem of the Maquoketa River which is limited by the dams at Manchester and Lake Delhi. Sand Creek encompasses 16,045 acres and is dominated by row crop agriculture. It is being impacted by sediment, nutrients and E coli bacteria. Sand Creek will be a good example for habitat impaired watershed. The purpose of this project is to decrease the amount of sediment and nutrients reaching Sand Creek and to increase the habitat in Sand Creek to make it a better spawning and growing area for the fish and the food chain for the fish. The objectives of this project are to reduce sediment delivery by 40%, to improve in-stream habitat on 40% of identified critical areas and implement an information/education program. The project will install 3,800 acres of new no-till planting, 6 water and sediment control basins, 4,000 feet of terraces, 20,000 feet of improved or new waterways, 3,200 feet of streambank/ habitat enhancement, 4,500 feet of livestock exclusion fencing and 6 acres of wetlands.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

With this application, the College Creek sub-watershed in Ames represents both regional collaboration and locally directed action to improve an Iowa watershed. Already completed watershed assessment identified more than 4000 tons/yr of sediment delivered from within the Ames city limits due to degraded stream conditions. The water quality enhancement goal of this project is reducing sediment delivery specifically from unstable streambanks and degrading stream channels on College Creek, one of 4 Ames tributaries to Squaw Creek. The project will also redirect urban storm water runoff into engineered infiltration systems, intercepting it from storm drains entering College Creek. This application builds on storm water runoff demonstration projects and research already funded in the College Creek sub-watershed by EPA Region 7 and Iowa DNR. Public outreach, one of the key elements of this project, is built into every phase from engineering design feedback to construction. Innovative neighborhood learning circles are utilized to educate residents and share public feedback with project engineers to ensure that project elements are both technically appropriate and socially acceptable. All practices proposed in this project -stream stabilization, storm water infiltration, and neighborhood learning circle techniques-have already been successfully demonstrated in the College Creek sub-watershed by the City of Ames in partnership with Iowa State University.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The urban portion of the Kettle Creek Watershed is experiencing severe bank and bed erosion due to unchecked stormwater runoff and a steep stream slope. The Kettle Creek Urban Watershed Improvement Project will reduce sediment input to the stream by stabilizing the steam bed with rock-riffle stream stabilization structures and stream bank improvements at select locations. Other components of the watershed are being addressed for excess sediment loads including the agricultural portion by constructing sediment detention basins, and the urban stormwater component by separating the existing combined sanitary and stormwater systems. The urban stream erosion factor represents the weak link in the current watershed impairment. The benefits of the all the watershed improvements components will be realized by all the residents of Kettle Creek Watershed as well as the citizens of Ottumwa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Phase 2 of the Saylor Creek Improvement Project is focused on channel restoration. The existing stream channel is generally incised, running through areas primarily covered with heavy trees, brush and weeds. The ravine ranges from 6 to 20 feet deep through the corridor with very steep slopes in several areas. In two areas storm outlets are undercut or suspended above the channel. Tall undercut, eroded banks exist along several of the outside bends. Sediment deposition on the inside bends limits the cross-section of the channel, increasing flow velocity and forcing this faster flow toward the eroded outside bank. A wide array of practices will need to be implemented to address channel erosion. Improvements will be specifically tailored to address problems observed at each bend. The result will be a channel with a more natural appearance, and reduced use of hard armor and revetment. Some sections will require minimal grading with removal of underbrush for improved maintenance access and more sun exposure, better allowing deep­ rooted plants and flowers to establish to provide further erosion protection. Straight sections with steep banks will require grading to pull back slopes, increasing the creek's capacity to convey storm flows at slower velocities. Sections with sharp bends will require slope pull back and armor protection. A constructed wetland will collect and treat runoff from a small sub-watershed, before being discharged into the main tributary.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Farmers Creek is a moderately flowing stream that winds through seventeen miles of central Jackson County, encompassing a watershed area of 30,590 acres. Due to nutrient loading and sedimentation, the stream was placed on Iowa’s 303(d) List of Impaired Waters in 2002. A three year grant project was initiated in January 2005 to reduce both sediment delivery and phosphorus levels by 40% in critical areas along the stream corridor. Over thirty-five BMP’s were started in the first nine months of this project. Funding through WIRB is being requested specifically for streambank stabilization and protection projects not covered by other cost-share programs. Innovative project designs and techniques will be installed and act as demonstration sites. Projects may include jetties, weirs, cedar revetments, cattle crossings, and fencing. To assist in excluding cattle from the stream, watering systems such as slingpumps, pasture pumps, or water rams will be installed, in conjunction with filter strips and riparian buffers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An overall effort has been initiated to improve the quality of the Yellow River in Northeast Iowa by reducing the amount of sediment and bacteria entering the stream. Funding for this project will be utilized to improve stream quality to the level of fully supporting game fish such as brown, rainbow and brook trout, walleye, northern pike and smallmouth bass. The Yellow River has the potential to be one of the top trout streams, not only in Iowa, but in the entire Upper Midwest. This project will greatly enhance recreational activities such as fishing, canoeing and inner tubing and will greatly increase tourism dollars to the state. The project will specifically address two sources of impairment: stream bank erosion and coliform bacteria from both livestock and inadequate human septic systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Farmers Creek is a moderately flowing stream that winds through seventeen miles of central Jackson County, encompassing a watershed area of 30,590 acres. Due to nutrient loading and sedimentation, the stream was placed on Iowa’s 303(d) List of Impaired Waters in 2002. A three year grant project was initiated in January 2005 to reduce both sediment delivery and phosphorus levels by 40% in critical areas along the stream corridor. Over thirty-five BMP’s were started in the first nine months of this project. Funding through WIRB is being requested specifically for streambank stabilization and protection projects not covered by other cost-share programs. Innovative project designs and techniques will be installed and act as demonstration sites. Projects may include jetties, weirs, cedar revetments, cattle crossings, and fencing. To assist in excluding cattle from the stream, watering systems such as slingpumps, pasture pumps, or water rams will be installed, in conjunction with filter strips and riparian buffers.