72 resultados para puberty installation
Resumo:
Premature failure of concrete pavement contraction joint seals is an ongoing and costly problem for the Iowa Department of Transportation. Several joint seal test sections consisting of variations in sawing methods, joint cleaning techniques, sealant installation, and sealant types have been established over the past few years. Laboratory analysis and field inspections were done as a part of the tests, and core samples were taken for laboratory adhesion pull tests. Such methods often cover specifically small areas and may not expose hidden failures. Some tests are also labor-intensive and destructive, especially that of coring. An innovative, nondestructive, broad coverage joint seal tester that yields quick results has been designed and developed for evaluation of pavement joint seal performance. The Iowa vacuum joint seal tester (IA-VAC) applies a low vacuum above a joint seal that has been spray-covered with a foaming water solution. Any unsealed area or leak that exists along the joint will become quickly and clearly visible by the development of bubbles at the leak point. By analyzing the results from the IA-VAC tests, information on the number and types of leaks can be obtained; such information will help identify the source of the problem and direct efforts toward a solution.
Resumo:
Two Brisco Scour Monitors were installed on pier MS1 of the Mississippi River at Burlington in August 1991. No problems were encountered during the installation. The monitors consist of a probe resting on the river bottom fastened to a cable that wraps around a reel. An electrical system monitors the movement of the reel which transmits to a digital readout which shows whether scour has occurred. The intent was to monitor the digital readout twice a year during a four-year evaluation period. The scour monitor digital readouts malfunctioned frequently due to electrical storms. The scour monitor performance was completely unacceptable.
Resumo:
The report documents the development and installation of an instrumented pavement on I-80 in Iowa for the purposes of demonstration and answering current pavement questions. Its two primary objectives include documentation of the installation and verification of existing design procedures through monitoring of the continuous traffic stream reactions in the pavement. Some 120 instruments were installed in a forty foot segment of reconstructed pavement. The instruments included concrete strain gages, weldable strain gages on dowels, LVDT-deflection gages and temperature sensors in the concrete and base material. Five tubes were placed under three joints and two midslabs to measure the relative moisture and density at the interface between the pavement and base with atomic equipment. The instruments were placed ahead of the paving and over 92% of the instruments responded after paving. Planning requirements, problems encountered and costs of installation are presented. The site will use piezoelectric cables in a weigh-in-motion arrangement to trigger the data collection, a microcomputer controlled data acquisition system to analyze multiple sensors simultaneously, and telemetry to monitor the site remotely. Details provide the first time user of instrumentation with valuable information on the planning, problems, costs and coordination required to establish and operate such a site.
Resumo:
Research was undertaken, sponsored by the Iowa Department of Transportation, to identify specific locations where rumble strips could be expected to improve highway safety. The objective of the research was to recommend warrants for their use on rural highways. An inventory of rumble strip installations on the rural highway systems in the state was conducted in 1981. A total of 685 installations was reported on secondary roads and 147 on primary highways. Over 97 percent of these were in advance of stop signs at. intersections. Most of the other installations were in advance of railroad grade crossings. The accident experience with and without rumble strips was compared in two ways. A before-and-after comparison was made for the same location if accident records were available for at least one full year both preceding and following the installation of rumble strips. Accident records for this purpose were available from a statewide computerized record system covering the period from 1977 through 1980. The accident experience at locations having rumble strips installed before 1978 was compared with a sample of comparable locations not having rumble strips.
Resumo:
Silver Creek is a warm water stream resource located in one of the most intensely cropped portions of Clayton County. The stream has been included on Iowa’s 303(d) list of impaired waters since 2002. Aquatic life, which should be present in Silver Creek, isn’t there. According to the Draft Total Maximum Daily Load (TMDL) for Silver Creek, the primary nonpoint pollution sources are soil erosion from agricultural land uses and direct deposition of ammonia by livestock with access to the stream. The Clayton Soil & Water Conservation District has begun efforts to remove Silver Creek from the impaired waters list. The District has promoted stream corridor and sinkhole protection, and the installation of buffer practices along Silver Creek and its tributaries. Conservation practices have been targeted to crop fields to reduce sediment delivery to the stream. A series of news articles, newsletters, and field days have been utilized to increase public understanding of water quality issues. Landowner interest has outweighed available cost share resources. Additional financial support will allow the project to build upon its early successes, to further address the identified impairments, and to respond to a long list of landowners that are interested in conservation work on their farms.
Resumo:
River Action is requesting funds for a project that offers design, technical and financial assistance to residential and commercial landowners and municipalities for the installation of buffers along Duck Creek and its tributaries. The buffers will improve water quality, reduce erosion on stream banks and provide habitat for wildlife. The projects will be planned and implemented through public meetings and educational workshops. This method of community involvement will increase awareness and education concerning the impairments in Duck Creek in Davenport and Bettendorf in Scott County, Iowa and promote personal responsibility and stewardship of watersheds.
Resumo:
Lake Morris is the larger of two lakes which serve as the municipal water supply for the City of Chariton, Iowa. As a site for fishing and boating, it also serves as a significant recreational resource for area residents. Its ability to sustain these uses has been significantly impaired by long-term and ongoing accumulation of sediment and sediment-borne nutrients from both public and private land within the watershed. This accumulation has resulted in reduced water depth, reduced water-holding capacity, reduced quality of the fishery, increased water turbidity, increased growth of undesirable algae, and increased cost of treating the water for municipal uses. Water quality projects undertaken in the past, notably the Lucas Lakes Project of the 1990s, made important progress in reducing sedimentation from privately-owned land higher in the watershed, but paid little attention to land owned by the City of Chariton immediately surrounding the lakes. A recent reassessment of gully erosion within the watershed shows serious, ongoing erosion on that City-owned land. This project proposes a two-part approach to improving the water quality in Lake Morris. First, we propose that a complement of five SolarBee water circulation devices be installed in Lake Morris to provide near-term and continuing improvements in water quality, by inhibiting cyanobacterial growth and thereby removing the need for treatment of the lakes with copper sulfate. Second, we propose the installation of erosion-control structures on primarily City-owned land surrounding the lake, to provide a major reduction in ongoing sedimentation.
Resumo:
In reinforced concrete systems, ensuring that a good bond between the concrete and the embedded reinforcing steel is critical to long-term structural performance. Without good bond between the two, the system simply cannot behave as intended. The bond strength of reinforcing bars is a complex interaction between localized deformations, chemical adhesion, and other factors. Coating of reinforcing bars, although sometimes debated, has been commonly found to be an effective way to delay the initiation of corrosion in reinforced concrete systems. For many years, the standard practice has been to coat reinforcing steel with an epoxy coating, which provides a barrier between the steel and the corrosive elements of water, air, and chloride ions. Recently, there has been an industry-led effort to use galvanizing to provide the protective barrier commonly provided by traditional epoxy coatings. However, as with any new structural product, questions exist regarding both the structural performance and corrosion resistance of the system. In the fall of 2013, Buchanan County, Iowa constructed a demonstration bridge in which the steel girders and all internal reinforcing steel were galvanized. The work completed in this project sought to understand the structural performance of galvanized reinforcing steel as compared to epoxy-coated steel and to initiate a long-term corrosion monitoring program. This work consisted of a series of controlled laboratory tests and the installation of a corrosion monitoring system that can be observed for years in the future. The results of this work indicate there is no appreciable difference between the bond strength of epoxy-coated reinforcing steel and galvanized reinforcing steel. Although some differences were observed, no notable difference in either peak load, slip, or failure mode could be identified. Additionally, a long-term monitoring system was installed in this Buchanan County bridge and, to date, no corrosion activity has been identified.
Resumo:
Often, road construction causes the need to create a work zone. In these scenarios, portable concrete barriers (PCBs) are typically installed to shield workers and equipment from errant vehicles as well as prevent motorists from striking other roadside hazards. For an existing W-beam guardrail system installed adjacent to the roadway and near the work zone, guardrail sections are removed in order to place the portable concrete barrier system. The focus of this research study was to develop a proper stiffness transition between W-beam guardrail and portable concrete barrier systems. This research effort was accomplished through development and refinement of design concepts using computer simulation with LS-DYNA. Several design concepts were simulated, and design metrics were used to evaluate and refine each concept. These concepts were then analyzed and ranked based on feasibility, likelihood of success, and ease of installation. The rankings were presented to the Technical Advisory Committee (TAC) for selection of a preferred design alternative. Next, a Critical Impact Point (CIP) study was conducted, while additional analyses were performed to determine the critical attachment location and a reduced installation length for the portable concrete barriers. Finally, an additional simulation effort was conducted in order to evaluate the safety performance of the transition system under reverse-direction impact scenarios as well as to select the CIP. Recommendations were also provided for conducting a Phase II study and evaluating the nested Midwest Guardrail System (MGS) configuration using three Test Level 3 (TL-3) full-scale crash tests according to the criteria provided in the Manual for Assessing Safety Hardware, as published by the American Association of Safety Highway and Transportation Officials (AASHTO).
Resumo:
Remote monitoring through the use of cameras is widely utilized for traffic operation, but has not been utilized widely for roadway maintenance operations. The Utah Department of Transportation (UDOT) has implemented a new remote monitoring system, referred to as a Cloud-enabled Remote Video Streaming (CRVS) camera system for snow removal-related maintenance operations in the winter. The purpose of this study was to evaluate the effectiveness of the use of the CRVS camera system in snow removal-related maintenance operations. This study was conducted in two parts: opinion surveys of maintenance station supervisors and an analysis on snow removal-related maintenance costs. The responses to the opinion surveys mostly displayed positive reviews of the use of the CRVS cameras. On a scale of 1 (least effective) to 5 (most effective), the average overall effectiveness given by the station supervisors was 4.3. An expedition trip for this study was defined as a trip that was made to just check the roadways if snow-removal was necessary. The average of the responses received from surveys was calculated to be a 33 percent reduction in expedition trips. For the second part of this study, an analysis was performed on the snow removal-related maintenance cost data provided by UDOT to see if the installation of a CRVS camera had an effect in reducing expedition trips. This expedition cost comparison was performed for 10 sets of maintenance stations within Utah. It was difficult to make any definitive inferences from the comparison of expedition costs over the years for which precipitation and expedition cost data were available; hence a statistical analysis was performed using the Mixed Model ANOVA. This analysis resulted in an average of 14 percent higher ratio of expedition costs at maintenance stations with a CRVS camera before the installation of the camera compared to the ratio of expedition costs after the installation of the camera. This difference was not proven to be statistically significant at the 95 percent confident level, but indicated that the installation of CRVS cameras was on the average helpful in reducing expedition costs and may be considered practically significant. It is recommended that more detailed and consistent maintenance cost records be prepared for accurate analysis of cost records for this type of study in the future.
Resumo:
Red light running continues to be a serious safety concern for many communities in the United States. The Federal Highway Administration reported that in 2011, red light running accounted for 676 fatalities nationwide. Red light running crashes at a signalized intersections are more serious, especially in high speed corridors where speeds are above 35 mph. Many communities have invested in red light countermeasures including low-cost strategies (e.g. signal backplates, targeted enforcement, signal timing adjustments and improvement with signage) to high-cost strategies (e.g. automated enforcement and intersection geometric improvements). This research study investigated intersection confirmation lights as a low-cost strategy to reduce red light running violations. Two intersections in Altoona and Waterloo, Iowa were equipped with confirmation lights which targeted the through and left turning movements. Confirmation lights enable a single police officer to monitor a specific lane of traffic downstream of the intersection. A before-after analysis was conducted in which a change in red light running violations prior to- and 1 and 3 months after installation were evaluated. A test of proportions was used to determine if the change in red light running violation rates were statistically significant at the 90 and 95 percent levels of confidence. The two treatment intersections were then compared to the changes of red light running violation rates at spillover intersections (directly adjacent to the treatment intersections) and control intersections. The results of the analysis indicated a 10 percent reduction of red light running violations in Altoona and a 299 percent increase in Waterloo at the treatment locations. Finally, the research team investigated the time into red for each observed red light running violation. The analysis indicated that many of the violations occurred less than one second into the red phase and that most of the violation occurred during or shortly after the all-red phase.
Resumo:
Single-vehicle run-off-road crashes are the most common crash type on rural two-lane Iowa roads. Rumble strips have been proven effective in mitigating these crashes, but these strips are commonly installed in paved shoulders adjacent to higher-volume roads owned by the State of Iowa. Lower-volume paved rural roads owned by local agencies do not commonly feature paved shoulders but frequently experience run-off-road crashes. This project involved installing “rumble stripes,” which are a combination of conventional rumble strips with a painted edge line placed on the surface of the milled area, along the edge of the travel lanes but at a narrow width to avoid possible intrusion into the normal vehicle travel paths. Candidate locations were selected from a list of paved local rural roads that were most recently listed in the top 5% of roads for run-off-road crashes in Iowa. Horizontal curves were the most favored locations for rumble stripe installation because they commonly experience roadway departure crashes. The research described in this report was part of a project funded by the Federal Highway Administration, Iowa Highway Research Board, and Iowa Department of Transportation to evaluate the effectiveness of edge line rumble strips in Iowa. The project evaluated the effectiveness of “rumble stripes” in reducing run-off-road crashes and in improving the longevity and wet weather visibility of edge line markings. This project consists of two phases. The first phase was to select pilot study locations, select a set of test sites, install rumble stripes, summarize lessons learned during installation, and provide a preliminary assessment of the rumble stripes’ performance. This information is summarized in this report. The purpose of the second phase is to provide a more long-term assessment of the performance of the pavement markings, conduct preliminary crash assessments, and evaluate lane keeping. This will result in a forthcoming second report.
Resumo:
In 1982, Iowa's crossing warning identification system and signage at rail crossings were outdated, inconsistent and inadequate. Iowa's railroad system had been reduced and reorganized during the 1970's and many of the surviving railroad companies were unable to install new signs or devote staff to updating information. The preliminary engineering part of this project improved the information inventory about each crossing, provided for installation of identification tags and resulted in a comprehensive list of posts and signs eligible for replacement. The sign installation portion of this project resulted in erection of nearly 10,000 new crossbuck signs and 10,000 advance warning signs with high intensity reflectorization. In addition, new posts and multiple track signs were replaced where appropriate. Increased visibility of crossings for the motoring public has resulted from proper sign placement and use of high intensity reflectorization. The tagging has provided a consistent correct identification of crossings for accident reporting. The computer inventory of information about the crossings is now correct and provides for informed decision making to administrators of Federal and State crossing safety funds.
Resumo:
In the past, culvert pipes were made only of corrugated metal or reinforced concrete. In recent years, several manufacturers have made pipe of lightweight plastic - for example, high density polyethylene (HDPE) - which is considered to be viscoelastic in its structural behavior. It appears that there are several highway applications in which HDPE pipe would be an economically favorable alternative. However, the newness of plastic pipe requires the evaluation of its performance, integrity, and durability; A review of the Iowa Department of Transportation Standard Specifications for Highway and Bridge Construction reveals limited information on the use of plastic pipe for state projects. The objective of this study was to review and evaluate the use of HDPE pipe in roadway applications. Structural performance, soil-structure interaction, and the sensitivity of the pipe to installation was investigated. Comprehensive computerized literature searches were undertaken to define the state-of-the-art in the design and use of HDPE pipe in highway applications. A questionnaire was developed and sent to all Iowa county engineers to learn of their use of HDPE pipe. Responses indicated that the majority of county engineers were aware of the product but were not confident in its ability to perform as well as conventional materials. Counties currently using HDPE pipe in general only use it in driveway crossings. Originally, we intended to survey states as to their usage of HDPE pipe. However, a few weeks after initiation of the project, it was learned that the Tennessee DOT was in the process of making a similar survey of state DOT's. Results of the Tennessee survey of states have been obtained and included in this report. In an effort to develop more confidence in the pipe's performance parameters, this research included laboratory tests to determine the ring and flexural stiffness of HDPE pipe provided by various manufacturers. Parallel plate tests verified all specimens were in compliance with ASTM specifications. Flexural testing revealed that pipe profile had a significant effect on the longitudinal stiffness and that strength could not be accurately predicted on the basis of diameter alone. Realizing that the soil around a buried HDPE pipe contributes to the pipe stiffness, the research team completed a limited series of tests on buried 3 ft-diameter HDPE pipe. The tests simulated the effects of truck wheel loads above the pipe and were conducted with two feet of cover. These tests indicated that the type and quality of backfill significantly influences the performance of HDPE pipe. The tests revealed that the soil envelope does significantly affect the performance of HDPE pipe in situ, and after a certain point, no additional strength is realized by increasing the quality of the backfill.
Resumo:
Innovative Rail Ltd. of Cedar Rapids, Iowa produced a new rail/highway crossing gate arm that shows promise in two areas: a. Minimizing arm breakage, and b. Added target value to motorists. The new gate was demonstrated to the Chicago and North Western Transportation Company, and that railroad has requested its use at two crossings on an "experimental basis" to determine if its installation provides relief in those areas. On April 18, 1986, the Department observed a test of the material under field conditions with the Transportation Company. The gate received four mid-center strikes at 5 MPH by a company truck while in the lowered position, and showed no damage. In a fifth mid-center strike at 15 MPH, the gate was visibly damaged at the connection to its raising mechanism, but continued to function though at a 5-10 degree drop. Several pictures of the gate and its saddle mechanism are shown in Appendix A of this report. Innovative Rail established distributorships in the United States and Canada, and has since gone out of business.