40 resultados para management practices


Relevância:

60.00% 60.00%

Publicador:

Resumo:

With the Saylor Creek Watershed Improvement Project, Iowa Heartland RC&D and other area stakeholders have an opportunity to display how "best management practices" (BMPs) can reduce storm water runoff and improve the quality of that runoff in an urban setting. Conservation design is a uew approach to storm water management that addresses the negative impacts of storm water runoff and turns them into a positive. The master plan for the Prairie Trail development surrounding the watershed project will incorporate bioretention cells, bioswales, buffer strips, rain gardens, as well as native plant landscaping to slow storm water runoff and naturally clean sediment out of the water before it reaches Saylor Creek. In addition to conservation design elements, the project will utilize storm water detention ponds and creek bed restoration to develop a complete storm water "treatment train" system within Prairie Trail. The extensive use of conservation storm water management for Prairie Trail is unique for urban development in Iowa.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Price Creek is a 13 mile long stream located in SE Benton County and the NE corner of Iowa County. It ends below the village of Amana where it flows into the Iowa River. The Iowa and Benton County Soil & Water Conservation Districts (SWCDs) applied (and were tentatively approved) for 319/WPF/WSPF funding to treat livestock and water quality issues in this watershed over the next three years. That project’s funds were allocated for a Project Coordinator, information and education activities, and cost share for Best Management Practices (BMPs) directed toward livestock issues and nutrient issues. Soil erosion and sedimentation are also problems in this 18,838 acre watershed. It is 64% HEL (highly erodible land) and 58% of it is cropped. With a coordinator working with Price Creek producers, this would be an excellent time to also address the soil loss and sedimentation issues in this watershed. We will offer additional cost share incentives on BMPs targeting soil erosion on the critical areas we’ve identified. We are applying to IWIRB for additional funding to allow us to cost share specific BMPs up to 75% to treat soil loss in these critical areas of the Price Creek Watershed.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Clear Lake, Iowa's third largest natural lake, is a premier natural resource and popular recreational destination in north central Iowa. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. Local communities have been working towards the goal of making improvements at all 30 storm water outlets that have a drainage area of five acres or more and have a cost effective solution. Many improvements have already been made, and now there are only seven storm water outlet sites remaining that still need protection in order to meet the goal. The storm water improvements have been very effective in reducing contaminants in urban runoff, achieving reduction levels in the 50-80% range. The proposed Clear Lake Storm Water Improvement Project will address the remaining seven outlet sites and take place over three years. The first year will consist of performing engineering and design of storm water best management practices (BMPs) at the seven outlet sites to determine if a cost effective solution exists for each. Years two and three will consist of installing two storm water improvements each year to implement the most cost effective BMPs at a minimum of four of the seven sites. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Dry Run Creek Watershed was designated an impaired waterbody by DNR in 2002, following an assessment of the biota in the stream by DNR Biologist, Tom Wilton. Subsequent studies by IOWATER Snapshot effort in 2003, found e-coli bacteria concentrations and high nitrate readings in excess of the State of Iowa limits for recreational streams. The Dry Run Creek Watershed Improvement Project is comprised of five major components. Three components will feature demonstrations of structural best management practices (BMPs) to protect water quality in Dry Run Creek. The fourth is an educational workshop to "kick-off" the initiative and background the stakeholders of the watershed in new stormwater management strategies for water quality protection. The fifth is a monitoring program that will provide data on the effectiveness of the practices to be demonstrated. Measurable outcomes from these projects include monitoring to document the effectiveness of infiltration­ based BMPs to reduce pollutant loading in urban stormwater runoff and reducing the volume of stormwater discharged directly into Dry Run Creek via storm sewer flows. Understanding of and social acceptance of new stormwater strategies and practices will also be monitored by surveys of watershed stakeholders and compared to findings of a survey done before the start of the project.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Rathbun Land and Water Alliance and partners have implemented a unique approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This project application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in two targeted sub-watersheds as part of the Rathbun Lake Special Project Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs on more than 2,200 acres that will reduce sediment and phosphorus delivery by 3,300 tons and 13,300 pounds per year respectively; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Watershed Improvement Review Board (WIRB) Grant will be used to enhance an on-going water quality project in Elk River Watershed. A targeted, locally controlled project has been active in the watershed since 2001. Current funding is being received primarily from the EPA-319 program, administrated by IDNR and the Watershed Protection Fund (WSPF) administrated by IDALS-DSC. Substantial funding is also obtained from the yearly county allocation of the Environmental Quality Incentive Program (EQIP) administrated by the USDA-NRCS. The overall objective of the Elk River Water Quality Project is to improve and restore the water quality in this water body by keying in on the potential sources of the identified impairments, and forging a working partnership between the local residents and the conservation agencies and organizations involved in the project. The major potential sources of the known surface water quality problems were identified during the assessment process and pointed to feedlot runoff and sediment delivery from within priority sub-watersheds. WIRB Funds will be used to cost share the application of Best Management Practices, thus reducing the projects dependency on federal funds. Funds will also be used to overcome a project’s limiting factor associated with insufficient technical assistance.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This project proposes a unique approach to addressing one of the more challenging issues facing efforts to protect water quality in Rathbun Lake; reducing sediment and phosphorus delivery from land on which best management practices (BMPs) will not be applied. This project will construct ten impoundments at key locations in the watershed to reduce the annual delivery of 2,970 tons of sediment and 12,100 pounds of phosphorus to Rathbun Lake. Features of this approach are: (a) impoundments will be constructed at sites below areas with high concentrations of priority land that has the greatest potential to deliver sediment and phosphorus to Rathbun Lake and on which landowners are unable or unwilling to apply BMPs and (b) strategically placed, large impoundments can be a cost effective means of reducing the sediment and phosphorus delivered to Rathbun Lake from priority land on which BMPs will not be applied. This project will significantly enhance the success of efforts underway in the Rathbun Lake Special Project as it addresses a critical water quality protection need that is not being met by current Special Project activities.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Clear Lake, Iowa's third largest natural lake, is located in Cerro Gordo County in north-central Iowa. The lake is a premier natural resource and popular recreational destination in north central Iowa, providing more than $40 million dollars annually to the local economy. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full recreational potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. There are over 68 storm water outlet points in the Clear Lake watershed that allow untreated urban runoff to empty directly into Clear Lake. Local governments have been very active in installing storm water Best Management Practices (BMPs) at as many of the outlets that current funding allows. To date, 11 of the 68 sites (16%) have been protected. These improvements have been very effective in reducing contaminants in the storm water runoff, but the remaining outlets still need protection. The first phase of this grant request is for an investigation of 10 storm water outlet sites to determine the most cost effective BMP for each site. The second phase of the grant request is to implement the BMPs deemed most cost effective at 5 of the 10 sites investigated. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Holiday Lake is included in the Walnut Creek watershed, which is listed on the 303(d) list of impaired water bodies. Research indicates that the causes of impairment are sedimentation and habitat alterations. To improve water quality, the goals of this project are to reduce the sediment delivery into Holiday Lake by 50% and assist in educating watershed residents about cost-effective ways to control sediment and nutrient contaminates. The best management practices will be installed to filter the water, reducing sediment and chemical loading into the lake. When all practices are installed, nearly 100% of the lake’s drainage area will be controlled.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Little Bear Creek is a 21.79 mile Class A1 and B (WW2) warm water stream that encompasses approximately 29,202 acres in northern Poweshiek County. The lower 8.4 mile segment is listed as biologically impaired on both the IDNR 2008 303(d) list and 2010 303(d) draft list. A RASCAL assessment and landowner survey was completed through a development grant in 2011, and these assessments indicate that erosion and sediment delivery from cropland, lack of adequate buffers along the stream channel, and streambank conditions contribute significant sediment delivery to the stream, likely resulting in the impairment. An estimated 36,544 tons of sediment are delivered to the stream annually. A total of 11,075 acres (38%) of the watershed are high priority areas or land with sediment delivery rates greater than one. Our goal over 15 years is to install Best Management Practices (BMPs) and increase public education in order to reduce sediment and phosphorus delivery by 25% and decrease priority areas by 15%. More specific objectives for this WIRB project are to 1) Reduce annual sediment delivery by roughly 16.3% or 1,058 tons and associated phosphorus delivery by 1,375 pounds and 2) Develop an information and education program aimed at producers and residents within the headwaters of Grant and Chester townships, which account for 18% of the watershed's priority areas. The SWCD proposes to utilize 50% EQIP funds and 25% WIRB funds toward rural BMPs, and 75% WIRB funds toward urban BMPs received through this application.