45 resultados para flooding
Resumo:
In the summer of 2008, the state of Iowa suffered from a series of severe storms that produced tornadoes and heavy rainfall, which resulted in widespread flooding. The Summer Storms1 lasted from late May through mid-August, with the most intense storms occurring over a month-long period from May 25 to June 25. The Summer Storms exacted a major human and economic toll on Iowa, resulting in 18 fatalities and 106 injuries, forcing the evacuation of approximately 38,000 Iowans, and impacting 21,000 housing units. Iowa’s public and private sectors suffered significant monetary damages. Eighty-six of the ninety-nine counties in the state were included in the Governor’s disaster declarations. Presidential disaster declarations made residents in 84 counties eligible for Public Assistance and 78 counties for Individual Assistance. The Rebuild Iowa Advisory Commission estimated $798.3 million in damages to publicly owned buildings and infrastructure, including damages of $53 million to public transportation and $342 million to public utilities.
Resumo:
In May 2011, very heavy rains combined with above average snowpack caused reservoirs throughout the Upper Missouri River basin to swell. The river carried more water in May and June than it does in an average year. The six Iowa counties bordering the river—Fremont, Harrison, Mills, Monona, Pottawattamie and Woodbury—suffered from major flooding which persisted throughout the spring and summer. On June 2, Governor Terry Branstad issued a Proclamation of Disaster Emergency for the six impacted counties. The Iowa Homeland Security and Emergency Management Division (HSEMD) activated the State Emergency Operations Center (SEOC) on June 10 to coordinate State, Federal, private sector, and voluntary agency preparedness and response activities in the affected area. The severity and duration of the flooding presented operational challenges for the SEOC and its partner agencies, which were further complicated by severe weather. The flooding forced the SEOC to conduct simultaneous response and recovery operations for an usually long period of time. The Missouri River floods caused major economic losses in Western Iowa. As a result of these economic losses, President Barack Obama issued a Major Disaster Declaration (FEMA-1998-DR) which made six counties eligible for Federal Public Assistance. The disaster declaration was subsequently amended on October 18, making five counties eligible for Federal Individual Assistance.
Resumo:
The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snow pack in the upper basin on the ground longer into the spring, setting the stage for this historic event.
Resumo:
Being prepared means making an emergency plan, building an emergency kit and being aware of the hazards that can impact you. Whether you are at home or at work, emergencies like tornadoes, flooding or winter storms can occur quickly and without warning. We can’t prevent emergencies, but we can prepare for them.
Resumo:
Whether it’s tornadoes, flooding, winter storms or an act of terrorism, emergencies can occur quickly and without warning. Although we cannot prevent emergencies, we can prepare for them. Teachers and administrators need to take special care as they are responsible for the students in their care. Putting together and having on hand a crisis kit can be invaluable in times of emergency.
Resumo:
The Duck Creek Watershed, the recipient of a 2009 DNR Watershed Management Planning Grant and a focus of an upcoming City of Davenport master plan, is characterized by relatively flat grades and highly impervious areas. Plagued by issues such as high bacteria loads, stream bank erosion and flooding, solving these problems may take generations. The City of Davenport has taken a microwatershed approach to identify the significant contributors to water quality and flooding issues that affect Duck Creek, its tributaries and the surrounding landscape to make inroads into the larger issues. This project is the next phase of a multi-phased project that addresses the microwatershed that includes St Ambrose University. Work here will improve water quality within Duck Creek and address major flooding issues on campus while also reducing downstream flooding. This project will convert an existing parking lot into a green parking area by removing the hard surface and installing below ground facilities for storm water infiltration, detention, and reuse. Permeable pavement, bio swales and infiltration areas will be constructed on top of the infiltration facilities. We estimate that this project will capture and treat 1,110,000 gallons (3.5 acre feet) of storm water runoff which accounts to the runoff volume from a 10-year storm event while reducing pollutants by 30-100%.
Resumo:
This issue review examines the flooding experienced by the University of Iowa and, to a much lesser degree, by Iowa State University and the University of Northern Iowa.
Resumo:
Plagued for nearly a century by the perennial flooding of Indian Creek, the City begins construction on a massive channelization project designed to confine the creek to its banks. Funded largely through a grant from the recently established Public Works Administration (PWA), the Indian Creek Channel, upon its completion two years later, would become the largest PWA undertaking in the State of Iowa. Though it did not completely end flooding in Council Bluffs, construction of the Indian Creek Channel did substantially reduce both the number and severity of the city's subsequent floods. It also profoundly impacted the residential and commercial development of Council Bluffs, as well as the city's sanitary conditions. The effects of the Indian Creek channelization, both practical and historical, are still realized today. In 2009, plans for a City road and bridge construction project at the intersection of North Broadway Street and Kanesville Boulevard proposed to replace a 221-foot-long segment of the Indian Creek Channel with a concrete box culvert. In compliance with the National Historic Preservation Act, a cultural resources study was conducted at the proposed construction site, the findings of which concluded that the historic character of the Indian Creek Channel would be compromised by the impending construction. As a means of mitigating these damages, an agreement was reached among the City, the Iowa State Historic Preservation Office, and the Federal Highway Administration that resulted in detailed research and documentation of the historical significance of the Indian Creek Channel. The findings of that study are summarized in this publication.
Resumo:
In June 2008, the University of Iowa (UI) campus experienced severe flooding and major damage to campus facilities. This report summarizes information provided by the UI on flood recovery as of August 2012.
Resumo:
The proposed action consists of upgrading Mississippi Drive (Iowa Highway 92) through downtown Muscatine, Iowa. The Mississippi Drive Corridor Project begins south of the Main Street/Grandview Avenue intersection, continuing to the East 2nd Street/Norbert F. Beckey Bridge intersection, which marks the end of the project. It passes through a mix of commercial, residential, Central Business District and industrial land uses. The total length of the project is approximately 1.6 miles, including 19 intersections (6 with traffic signals). Refer to the vicinity map on Figure 1. The current roadway is a 3- to 4-lane, urban facility with both divided and undivided medians. The roadway, ranging from 40 to 64 feet wide, is considered difficult to cross for pedestrians, especially for small children or elderly. The width of this roadway is being considered to be narrowed to improve the accessibility to the downtown from the Mississippi River riverfront area by pedestrians. This project also includes accommodations for bicycles and pedestrians and measures to reduce flooding on the roadway.
Resumo:
Iowa legislation required the state’s Water Resources Coordinating Council (WRCC) to submit policy and make recommendations that promote a watershed management approach to reduce the adverse impact of future flooding on this state’s residents, businesses, communities, and soil and water quality.
Resumo:
The Duck Creek watershed has been the target study area of multiple reports by multiple agencies including a 2009 DNR Watershed Master Planning Grant, and the 2011 Duck and Blackhawk Creek Stream Assessment. The information obtained from these reports has lead the City of Davenport to take a micro-watershed approach to identifying the significant contributors to flooding and water quality issues that affect Duck Creek, its tributaries and the surrounding landscape, and devise solutions to mitigate these concerns. The construction of the proposed Littig Area Detention Basin comes as a recommendation from the Comprehensive Stormwater Management Plan for Pheasant, Goose, and Silver Creeks as prepared by James M. Montgomery, Consulting Engineers, Inc. in September 1991. At the time this report was prepared this basin was one of eight regional detention basins proposed in the upstream watersheds to alleviate flooding on tributaries to Duck Creek. The basin is designed and situated to detain runoff from approximately two hundred and twenty-seven (227) acres of previously developed moderate density residential area with intermixed light business and schools. This basin will reduce flow rates entering the receiving waters from the two, five and ten year storm events by an average of eighty-five percent (85%) and reduce flow rates from the twenty-five, fifty, and one hundred year events by a11 average of fifty percent (50%). With this flow rate reduction it is anticipated that streambank erosion in the immediate downstream receiving waters can be reduced or even stopped. The reduction in sediment leaving this upstream area will greatly enhance the water quality further downstream in Goose and Duck Creeks.
Resumo:
The City of Marquette lies in the 65,000 acre Mississippi River watershed, and is surrounded by steep bluffs. Though scenic, controlling water runoff during storm events presents significant challenges. Flash-flooding from the local watershed has plagued the city for decades. The people of Marquette have committed to preserve the water quality of key natural resources in the area including the Bloody Run Creek and associated wetlands by undertaking projects to control the spread of debris and sediment caused by excess runoff during area storm events. Following a July 2007 storm (over 8” of rain in 24 hours) which caused unprecedented flood damage, the City retained an engineering firm to study the area and provide recommendations to eliminate or greatly reduce uncontrolled runoff into the Bloody Run Creek wetland, infrastructure damage and personal property loss. Marquette has received Iowa Great Places designation, and has demonstrated its commitment to wetland preservation with the construction of Phase I of this water quality project. The Bench Area Storm Water Management Plan prepared by the City in 2008 made a number of recommendations to mitigate flash flooding by improving storm water conveyance paths, detention, and infrastructure within the Bench area. Due to steep slopes and rocky geography, infiltration based systems, though desirable, would not be an option over surface based systems. Runoff from the 240 acre watershed comes primarily from large, steep drainage areas to the south and west, flowing to the Bench area down three hillside routes; designated as South East, South Central and South West. Completion of Phase I, which included an increased storage capacity of the upper pond, addressed the South East and South Central areas. The increased upper pond capacity will now allow Phase II to proceed. Phase II will address runoff from the South West drainage area; which engineers have estimated to produce as much water volume as the South Central and South East areas combined. Total costs for Phase I are $1.45 million, of which Marquette has invested $775,000, and IJOBS funding contributed $677,000. Phase II costs are estimated at $617,000. WIRB funding support of $200,000 would expedite project completion, lessen the long term debt impact to the community and aid in the preservation of the Bloody Run Creek and adjoining wetlands more quickly than Marquette could accomplish on its own.
Resumo:
Waterloo Creek Watershed is a 30,610 acre area that straddles the Iowa and Minnesota border. The lower 43% of the watershed is in Iowa. Bee and Duck Creeks in Minnesota flow into Waterloo Creek in Iowa. Designated as a primary contact recreational stream as well as a high-quality, cold water stream in Iowa, Waterloo Creek is a popular destination for anglers and other nature enthusiasts. The stream was on the Iowa DNR’s “Impaired Waters List” in 2008 and 2010 for Escherichia coli (E. coli) bacteria. Samples collected in 2010 and 2011 showed higher levels of E. coli. at sites with cattle in close proximity to the stream and were generally greater after high rainfall events. Other factors affecting water quality are high turbidity levels and frequent flooding. There is a deficiency in upland land treatment and an abundance of conventional tillage which increases the amount of erosion and potential for surface runoff to carry sediment to the stream. A comprehensive watershed assessment and management plan have been completed for the watershed which identify the causes of and solutions to water quality impairments. The goals of this project are to 1) develop a formal working relationship between technical staff in Iowa and Minnesota, 2) identify specific locations for Best Management Practice (BMP) implementation, 3) reduce sediment loading to Waterloo Creek to improve aquatic habitat and decrease bacteria delivery, and 4) reduce flooding potential in the watershed. The following BMPs will be implemented to reach these goals: terraces, grade stabilization structures, pasture management, stream buffers, stream bank stabilization, and agricultural waste structures.
Resumo:
Prior to European settlement, wetland basins covered 4 to 6 million acres, or approximately 11% of Iowa's surface area. Wetlands were part of every watershed in the state, but nearly 95% of them have been drained for agriculture. As Iowa was settled wetlands were drained and developed, resulting in the loss of wildlife habitat, damage to water quality, rapid topsoil erosion, and increased incidents and severity of flooding. The condition of Iowa’s remaining wetlands is poorly known. The goal of this project was to assess the ecological condition of prairie pothole wetlands in a defined region of north-central Iowa. This project has worked to develop and establish our wetland sampling methods, while providing baseline data regarding the basic chemical, physical, and biological status of Iowa’s permanent and semi-permanent wetland resources. The baseline data obtained from our monitoring methods is mainly in the form of numerical values derived from the lab analyses of our samples. This data will be used to begin building a database to interpret ecological condition changes in Iowa’s wetlands as the sampling regime and assessment methodology are repeated over time.