59 resultados para covers


Relevância:

10.00% 10.00%

Publicador:

Resumo:

One of the more severe winter hazards is ice or compacted snow on roadways. While three methods are typically used to combat ice (salting, sanding and scraping), relatively little effort has been applied to improve methods of scraping ice from roads. In this project, a new test facility has been developed, comprising a truck with an underbody blade, which has been instrumented such that the forces to scrape ice from a pavement can be measured. A test site has been used, which is not accessible to the public, and ice covers have been sprayed onto the pavement and subsequently scraped from it, while the scraping loads have been recorded. Three different cutting edges have been tested for their ice scraping efficiency. Two of the blades are standard (one with a carbide insert, the other without) while the third blade was designed under the SHRP H-204A project. Results from the tests allowed two parameters to be identified. The first is the scraping efficiency which is the ratio of vertical to horizontal force. The lower this ratio, the more efficiently ice is being removed. The second parameter is the scraping effectiveness, which is related (in some as yet unspecified manner) to the horizontal load. The higher the horizontal load, the more ice is being scraped. The ideal case is thus to have as high a horizontal load as possible, combined with the lowest possible vertical load. Results indicate that the SHRP blade removed ice more effectively than the other two blades under equivalent conditions, and furthermore, did so with greater efficiency and thus more control. Furthermore, blade angles close to 0 deg provide for the most efficient scraping for all three blades. The study has shown that field testing of plow blades is possible in controlled situations, and that blades can be evaluated using this system. The system is available for further tests as are deemed appropriate.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Snow removal on the 90,000 mile Iowa secondary road system is a major concern of county engineers. Rural residents rely almost entirely on motor vehicles for travel. They have come to expect passable roads during all types of weather and as most county engineers know, the public is less tolerant of problems in snow removal than in any other highway department function. To avoid snow removal problems, maintenance personnel begin preparation before the winter maintenance season. The slide tape presentation, "Snow Removal on Iowa's Secondary Roads", was developed to assist in training and retraining maintenance personnel each year prior to winter. The program covers preparation for winter, snow and ice removal, and after storm care of equipment.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Department of Transportation Materials Laboratory personnel announced in early 1982 a process to produce a road deicer consisting of sand grains coated with calcium magnesium acetate (CMA). From that point forward the Iowa DOT began searching for a means of economically producing CMA to their concept. During 1983 and 1984 the first attempts devised for commercially producing CMA were attempted by the W.G. Block Company, Davenport, Iowa, under Iowa Highway Research Board Project HR-253. This first attempt at commercially producing CMA was accomplished by the use of concrete transit mixer equipment. Even though this procedure proved successful in the batch mixing of CMA, the need for higher production rates to reduce the cost per ton still existed. During the fall of 1984, Cedarapids Inc, Cedar Rapids, Iowa, proposed to Iowa DOT personnel the application of their technology to a continuous mixing concept for CMA. Arrangements were made for the continuous test mixing of 60 to 100 tons of CMA/sand deicer. This report covers the production effort, description and results of procedures outlined in Cedarapids Inc's proposal of September 19, 1984. The objectives of this research were: 1. To produce the CMA/sand deicer concept on a continuous mixing basis to Iowa DOT CMA concentration levels. 2. To evaluate the results of preheating the carrying vehicle (sand) prior to CMA ingredient introduction. 3. To analyze the feasibility of production equipment and procedures necessary for portable and/or stationary applications of continuous mixing concepts.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report is a supplement to one issued in late summer 1986 which covered construction on U.S. 71, in Buena Vista County Iowa. The work involved rehabilitation of an older 20 feet wide pavement by placing a four inch thick bonded concrete overlay monolithically with two feet of widening on each side. The work was performed on one lane at a time while construction traffic and limited public traffic used the adjacent traffic lane. When work on the first lane was complete traffic was moved onto it and rehabilitation was completed on the second lane. This report covers the condition of the rehabilitated roadway in May 1987 after the first winter. The condition is described by visual observations, core conditions, and various test results including core compressive strength, direct shear tests on cores for bond strength, profilometer results and delamtect test results.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Department of Transportation Materials Laboratory personnel developed a process to produce a road deicer consisting of sand grains coated with calcium magnesium acetate (CMA). Research project HR-253 was established to explore commercial production of the CMA/sand deicer by an independent contractor. About 60 tons of the deicer was produced at a ready-mix concrete facility and evaluated in the field during the 1983-1984 winter season. The initial contracted production of CMA/sand deicer under research project HR-253 identified two major problems: (1) excessive unreacted lime in the final product, and (2) formation of spherical lumps within the product requiring subsequent size reduction. It was recommended in the HR-253 report that additional deicer be produced as a continuation of the project in order to address these problems and further develop the production process. A contract was negotiated with W. G. Block Co. to produce and deliver 50 tons of additional deicer. This addendum report covers this production effort including descriptions and results of all modifications of equipment and process procedures used.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study examines the possible construction and use of shelters in the event of a nuclear weapon attack in seven target areas in Iowa. It covers such topics as cost, survival percentages, best location to build shelters and how many will be needed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A constitutional convention convened in Iowa City on January 19, 1857 ending on March 5, 1857. The convention drafted and approved the Constitution of Iowa. This constitution is the still in use today by the State of Iowa. It has been amended many times from 1868 thru 2010. NOTE: This version of the Constitution of Iowa has been enhanced to darken the handwritten text and the covers and blank pages have been omitted. Only the handwritten text is included.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

East Okoboji Beach was platted on April 20, 1961 and includes over 90.4 acres with 489 lots. The East Okoboji Beach project includes a complete storm water discharge system, which includes low impact development and reconstruction of the roadways in East Okoboji Beach. The East Okoboji Beach Project is an enormous project that is the first Dickinson County project to retrofit LID practices, lake-friendly storm-water drainage systems and roadway reconstruction throughout an existing sub- division. This cooperative project between DNR, Dickinson County, and EOB landowners includes engineering retention ponds, rain gardens, bio-swales and other LID practices to reduce nutrient and sediment pollutants flowing directly into East Okoboji. The nature of the problem stems back to that original plat where small lots were platted and developed without planning for storm water discharge. There was no consideration of the effects of filling in and developing over the many wetland areas existing in EOB. The scope of the problem covers the entire 90.4 acres in East Okoboji Beach, the DNR owned land and the farmed land to the east. The nature of the problem stems from storm water runoff flowing throughout the watershed and into East Okoboji Beach where it flows down self-made paths and then into East Lake Okoboji. That storm water runoff dumps nutrient and sediment pollutions directly into East Lake Okoboji. The expected result of this project is a new roadway and drainage system constructed with engineering that is intended to protect East Lake Okoboji and the land and homes in East Okoboji Beach. The benefit will be the improvement in the waters and the reduction of the siltation in the East Lake Okoboji.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Equipment and Vehicle Revolving Fund report covers all equipment and vehicle purchases through the highway materials and equipment revolving fund during FY 2014.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa State Highway Commission exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa State Highway Commission exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway. (1973 revision to 1970 policy.)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa Department of Transportation exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway. (1985 revision to 1973 policy.)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This policy covers initial placement, adjustment, relocation and replacement of utility facilities in, on, above or below all highway right of way over which the Iowa Department of Transportation exercises control of access. It embodies the basic specifications and standards needed, to insure the safety of the highway user and the integrity of the highway. (1990 revision to 1985 policy.)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This chapter covers initial placement, adjustment, and maintenance of utility facilities in, on, above or below the right-of-way of primary highways, including attachments to primary highway structures. It embodies the basic specifications and standards needed to ensure the safety of the highway user and the integrity of the highway. (2012 revision to 2005 policy.)

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This chapter covers initial placement, adjustment, improvement, relocation, replacement and maintenance of utility facilities in, on, above or below the right-of-way over of primary highways, including attachments to primary highway structures. It embodies the basic specifications and standards needed, to ensure the safety of the highway user and the integrity of the highway. (1992 revision to 1990 policy.)