67 resultados para Wason Selection Task
Resumo:
The Rebuild Iowa Education Task Force is composed of Iowans with experience and expertise related to the impact of the tornadoes, storms, and floods of 2008 on the educational system in Iowa. The massive damage greatly impacted educational facilities and enrollment, resulting in thousands of displaced students and significant long-term rebuilding needs. In addition, the education system is a “community center,” and in many ways acts as a first responder to Iowans experiencing the disasters. It is important to also recognize this role and the need for “non-educational” (and often non-quantifiable) supports as a part of the overall recovery effort. There are a few parts of the state that sustained significant structural and other damage as a result of the disasters. However, many school districts and educational institutions throughout the state experienced damage that resulted in re-allocating building usage, enrollment issues (because of housing and relocation issues in the community), or use of school facilities to assist in the recovery efforts (by housing displaced community agencies and providing temporary shelter for displaced Iowans). At this time, damage estimates are only estimates and numbers are revised often. Estimates of damage are being developed by multiple agencies, including FEMA, the Iowa Department of Education, insurance companies, and schools themselves, since there are many different types of damage to be assessed and repaired. In addition to structural damage, educational institutions and communities are trying to find ways to quantify sometimes unquantifiable data, such as future revenue capabilities, population declines, and impact on mental health in the long-term. The data provided in this report is preliminary and as up to date as possible; information is updated on a regular basis as assessments continue and damage estimates are finalized. Supplemental Information to the August 2008 Education Task Force Report
Resumo:
The Flood Plain Management and Hazard Mitigation Task Force emphasizes the long-term benefits of mitigation and management to the entire state in preventing or reducing damages from floods and other hazards faced in Iowa. Investments in efforts to manage watershed areas and to mitigate any damages from floods or other disaster events benefit individuals, families, communities, agriculture, business and industry, and certainly public entities and infrastructure. The Task Force encourages the Rebuild Iowa Advisory Commission to balance the immediate needs for rebuilding to include the beginning of the investments required to effectively mitigate future damage and maintain effective policy in Iowa’s watersheds. The significance of the damage seen in Iowa from the tornadoes, storms, and floods of 2008 include the loss of eighteen Iowans in disaster-related events. This alone should inspire investment in mitigation efforts for all hazards. Much of the damage resulting from the disasters can be tied to floodplain management and hazard mitigation, pointing the way toward enhanced efforts and new initiatives to safeguard lives, property, and communities’ economic health. Even so, it must be recognized that the weather events throughout last winter and spring added impetus to the rains and storms that ultimately resulted in record flooding. Some perspective must be maintained as planning progresses and significant investments in mitigation are considered to meet a specific level of safety and protection from future threats. The Task Force identified a number of issues, and four were agreed-upon as those with the highest priority to be addressed by the Task Force through a set of recommendations.
Resumo:
The Flood Plain Management and Hazard Mitigation Task Force emphasizes the long-term benefits of mitigation and management to the entire state in preventing or reducing damages from floods and other hazards faced in Iowa. Investments in efforts to manage watershed areas and to mitigate any damages from floods or other disaster events benefit individuals, families, communities, agriculture, business and industry, and certainly public entities and infrastructure. The Task Force encourages the Rebuild Iowa Advisory Commission to balance the immediate needs for rebuilding to include the beginning of the investments required to effectively mitigate future damage and maintain effective policy in Iowa’s watersheds. The significance of the damage seen in Iowa from the tornadoes, storms, and floods of 2008 include the loss of eighteen Iowans in disaster-related events. This alone should inspire investment in mitigation efforts for all hazards. Much of the damage resulting from the disasters can be tied to floodplain management and hazard mitigation, pointing the way toward enhanced efforts and new initiatives to safeguard lives, property, and communities’ economic health. Even so, it must be recognized that the weather events throughout last winter and spring added impetus to the rains and storms that ultimately resulted in record flooding. Some perspective must be maintained as planning progresses and significant investments in mitigation are considered to meet a specific level of safety and protection from future threats. The Task Force identified a number of issues, and four were agreed-upon as those with the highest priority to be addressed by the Task Force through a set of recommendations. Supplemental Information to the August 2008
Resumo:
Few disaster recovery initiatives are more important than those that house the people and assist them to repair or replace their homes. The widespread damage to housing from the tornadoes, storms, and floods in 2008 creates greater challenges in housing than the state has faced from previous disasters. The Housing Task Force gratefully submits its Report to the Rebuild Iowa Advisory Commission as an opportunity to place data, issues, priorities and recommendations before residents, communities, state officials, and policymakers at all levels for consideration of how best to guide, support, and resource these efforts. Quantifying the impact of the disasters on communities is daunting. The many personal accounts and sets of community statistics paint pictures of Iowans who have emerged from the rubble or muck of their homes with a determination and commitment to rebuild not just like they were previous to the disasters, but better and stronger. Damage statistics are telling.
Resumo:
Few disaster recovery initiatives are more important than those that house the people and assist them to repair or replace their homes. The widespread damage to housing from the tornadoes, storms, and floods in 2008 creates greater challenges in housing than the state has faced from previous disasters. The Housing Task Force gratefully submits its Report to the Rebuild Iowa Advisory Commission as an opportunity to place data, issues, priorities and recommendations before residents, communities, state officials, and policymakers at all levels for consideration of how best to guide, support, and resource these efforts. Quantifying the impact of the disasters on communities is daunting. The many personal accounts and sets of community statistics paint pictures of Iowans who have emerged from the rubble or muck of their homes with a determination and commitment to rebuild not just like they were previous to the disasters, but better and stronger. Damage statistics are telling. Supplemental Information to the August 2008
Resumo:
Red light running (RLR) is a problem in the US that has resulted in 165,000 injuries and 907 fatalities annually. In Iowa, RLR-related crashes make up 24.5 percent of all crashes and account for 31.7 percent of fatal and major injury crashes at signalized intersections. RLR crashes are a safety concern due to the increased likelihood of injury compared to other types of crashes. One tool used to combat red light running is automated enforcement in the form of RLR cameras. Automated enforcement, while effective, is often controversial. Cedar Rapids, Iowa installed RLR and speeding cameras at seven intersections across the city. The intersections were chosen based on crash rates and whether cameras could feasibly be placed at the intersection approaches. The cameras were placed starting in February 2010 with the last one becoming operational in December 2010. An analysis of the effect of the cameras on safety at these intersections was determined prudent in helping to justify the installation and effectiveness of the cameras. The objective of this research was to assess the safety effectiveness of the RLR program that has been implemented in Cedar Rapids. This was accomplished by analyzing data to determine changes in the following metrics: Reductions in red light violation rates based on overall changes, time of day changes, and changes by lane Effectiveness of the cameras over time Time in which those running the red light enter the intersection Changes in the average headway between vehicles entering the intersection
Resumo:
The Department shall staff a task force to be appointed by the governor consisting of knowledgeable citizen to perform an in-depth review of the four state mental health institutes, services provided, public benefits of the services provided, economic effects connected to the presence of the institutes that are realized by the communities in the areas served and the families of personnel and other public costs and benefits associated with the presence and availability of the four institutes. the review shall be coordinated with the proposal to be developed by the department under this section and shall submit a report providing findings and recommendations to the governor and general assembly on or before December, 15. 2009
Resumo:
During the 2010 session, the Iowa Legislature created per House File 2422 a Business Disaster Case Management Task Force. The purpose of the Task Force is to research disaster recovery case management assistance needed for businesses following a major disaster and to recommend steps for providing such assistance following disasters. The Task Force was duly constituted. Its recommendations are contained in this report. The Task Force focused on what the State of Iowa could do for itself without reliance on federal agencies or programs. It concluded that the hallmarks of any business disaster assistance must be speed of delivery and simplicity in execution. In addition, monies used to assist business recovery should be free of as many restraints on use as possible, relying on the affected businesses to judge for themselves how best to deploy capital resources.
Resumo:
Agreed upon procedures report on the Lee County Narcotics Task Force for the period July 1, 2010 through May 31, 2012
Resumo:
The present research project was designed to identify the typical Iowa material input values that are required by the Mechanistic-Empirical Pavement Design Guide (MEPDG) for the Level 3 concrete pavement design. It was also designed to investigate the existing equations that might be used to predict Iowa pavement concrete for the Level 2 pavement design. In this project, over 20,000 data were collected from the Iowa Department of Transportation (DOT) and other sources. These data, most of which were concrete compressive strength, slump, air content, and unit weight data, were synthesized and their statistical parameters (such as the mean values and standard variations) were analyzed. Based on the analyses, the typical input values of Iowa pavement concrete, such as 28-day compressive strength (f’c), splitting tensile strength (fsp), elastic modulus (Ec), and modulus of rupture (MOR), were evaluated. The study indicates that the 28-day MOR of Iowa concrete is 646 + 51 psi, very close to the MEPDG default value (650 psi). The 28-day Ec of Iowa concrete (based only on two available data of the Iowa Curling and Warping project) is 4.82 + 0.28x106 psi, which is quite different from the MEPDG default value (3.93 x106 psi); therefore, the researchers recommend re-evaluating after more Iowa test data become available. The drying shrinkage (εc) of a typical Iowa concrete (C-3WR-C20 mix) was tested at Concrete Technology Laboratory (CTL). The test results show that the ultimate shrinkage of the concrete is about 454 microstrain and the time for the concrete to reach 50% of ultimate shrinkage is at 32 days; both of these values are very close to the MEPDG default values. The comparison of the Iowa test data and the MEPDG default values, as well as the recommendations on the input values to be used in MEPDG for Iowa PCC pavement design, are summarized in Table 20 of this report. The available equations for predicting the above-mentioned concrete properties were also assembled. The validity of these equations for Iowa concrete materials was examined. Multiple-parameters nonlinear regression analyses, along with the artificial neural network (ANN) method, were employed to investigate the relationships among Iowa concrete material properties and to modify the existing equations so as to be suitable for Iowa concrete materials. However, due to lack of necessary data sets, the relationships between Iowa concrete properties were established based on the limited data from CP Tech Center’s projects and ISU classes only. The researchers suggest that the resulting relationships be used by Iowa pavement design engineers as references only. The present study furthermore indicates that appropriately documenting concrete properties, including flexural strength, elastic modulus, and information on concrete mix design, is essential for updating the typical Iowa material input values and providing rational prediction equations for concrete pavement design in the future.
Resumo:
The present research project was designed to determine thermal properties, such as coefficient of thermal expansion (CTE) and thermal conductivity, of Iowa concrete pavement materials. These properties are required as input values by the Mechanistic-Empirical Pavement Design Guide (MEPDG). In this project, a literature review was conducted to determine the factors that affect thermal properties of concrete and the existing prediction equations for CTE and thermal conductivity of concrete. CTE tests were performed on various lab and field samples of portland cement concrete (PCC) at the Iowa Department of Transportation and Iowa State University. The variations due to the test procedure, the equipment used, and the consistency of field batch materials were evaluated. The test results showed that the CTE variations due to test procedure and batch consistency were less than 5%, and the variation due to the different equipment was less than 15%. Concrete CTE values were significantly affected by different types of coarse aggregate. The CTE values of Iowa concrete made with limestone+graval, quartzite, dolomite, limestone+dolomite, and limestone were 7.27, 6.86, 6.68, 5.83, and 5.69 microstrain/oF (13.08, 12.35, 12.03, 10.50, and 10.25 microstrain/oC), respectively, which were all higher than the default value of 5.50 microstrain/oF in the MEPDG program. The thermal conductivity of a typical Iowa PCC mix and an asphalt cement concrete (ACC) mix (both with limestone as coarse aggregate) were tested at Concrete Technology Laboratory in Skokie, Illinois. The thermal conductivity was 0.77 Btu/hr•ft•oF (1.33 W/m•K) for PCC and 1.21 Btu/hr•ft•oF (2.09 W/m•K) for ACC, which are different from the default values (1.25 Btu/hr•ft•oF or 2.16 W/m•K for PCC and 0.67 Btu/hr•ft•oF or 1.16 W/m•K for ACC) in the MEPDG program. The investigations onto the CTE of ACC and the effects of concrete materials (such as cementitious material and aggregate types) and mix proportions on concrete thermal conductivity are recommended to be considered in future studies.
Resumo:
Red light running (RLR) is a problem in the US that has resulted in 165,000 injuries and 907 fatalities annually. In Iowa, RLR-related crashes make up 24.5 percent of all crashes and account for 31.7 percent of fatal and major injury crashes at signalized intersections. RLR crashes are a safety concern due to the increased likelihood of injury compared to other types of crashes. One tool used to combat red light running is automated enforcement in the form of RLR cameras. Automated enforcement, while effective, is often controversial. Cedar Rapids, Iowa installed RLR and speeding cameras at seven intersections across the city. The intersections were chosen based on crash rates and whether cameras could feasibly be placed at the intersection approaches. The cameras were placed starting in February 2010 with the last one becoming operational in December 2010. An analysis of the effect of the cameras on safety at these intersections was determined prudent in helping to justify the installation and effectiveness of the cameras. The objective of this research was to assess the safety effectiveness of the RLR program that has been implemented in Cedar Rapids. This was accomplished by analyzing data to determine changes in the following metrics: Reductions in red light violation rates based on overall changes, time of day changes, and changes by lane Effectiveness of the cameras over time Time in which those running the red light enter the intersection Changes in the average headway between vehicles entering the intersection
Resumo:
Most Iowa counties maintain low volume roads with at least one bridge or culvert that is structurally deficient or obsolete. In some counties the percentage of deficient drainage structures may be as high as 62%. Replacement with structures of similar size would require large capital expenditures that many counties cannot afford. Low water stream crossings (LWSCs) may be an acceptable lowcost alternative in some cases.
Resumo:
The National Concrete Pavement Technology Center, Iowa Department of Transportation, and Federal Highway Administration set out to demonstrate and document the design and construction of portland cement concrete (PCC) overlays on two-lane roadways while maintaining two-way traffic. An 18.82 mile project was selected for 2011 construction in northeast Iowa on US 18 between Fredericksburg and West Union. This report documents planning, design, and construction of the project and lessons learned. The work included the addition of subdrains, full-depth patching, bridge approach replacement, and drainage structural repair and cleaning prior to overlay construction. The paving involved surface preparation by milling to grade and the placement of a 4.5 inch PCC overlay and 4 foot of widening to the existing pavement. In addition, the report makes recommendations on ways to improve the process for future concrete overlays.
Resumo:
The Missouri River floods of 2011 will go down in history as the longest duration flooding event this state has seen to date. The combination of above normal snowfall in the upper Missouri River basin followed by the equivalent of nearly one year’s worth of rainfall in May created an above normal runoff situation which filled the Missouri River and the six main reservoirs within the basin. Compounding this problem was colder than normal temperatures which kept much of the snowpack in the upper basin on the ground longer into the spring, setting the stage for this historic event. The U.S. Army Corps of Engineers (USACE) began increasing the outflow at Gavin’s Point, near Yankton, South Dakota in May. On June 14, 2011, the outflow reached a record rate of over 160,000 cubic feet per second (cfs), over twice the previous record outflow set in 1997. This increased output from Gavin’s Point caused the Missouri River to flow out of its banks covering over 283,000 acres of land in Iowa, forcing hundreds of evacuations, damaging 255,000 acres of cropland and significantly impacting the levee system on the Missouri River basin. Over the course of the summer, approximately 64 miles of primary roads closed due to Missouri River flooding, including 54 miles of Interstate Highway. Many county secondary roads were closed by high water or overburdened due to the numerous detours and road closures in this area. As the Missouri River levels began to increase, municipalities and counties aided by State and Federal agencies began preparing for a sustained flood event. Citizens, businesses, state agencies, local governments and non‐profits made substantial preparations, in some cases expending millions of dollars on emergency protective measures to protect their facilities from the impending flood. Levee monitors detected weak spots in the levee system in all affected counties, with several levees being identified as at risk levees that could potentially fail. Of particular concern was the 28 miles of levees protecting Council Bluffs. Based on this concern, Council Bluffs prepared an evacuation plan for the approximately 30,000 residents that resided in the protected area. On May 25, 2011, Governor Branstad directed the execution of the Iowa Emergency Response Plan in accordance with Section 401 of the Stafford Act. On May 31, 2011, HSEMD Administrator, Brigadier General J. Derek Hill, formally requested the USACE to provide technical assistance and advanced measures for the communities along the Missouri River basin. On June 2, 2011 Governor Branstad issued a State of Iowa Proclamation of Disaster Emergency for Fremont, Harrison, Mills, Monona, Pottawattamie, and Woodbury counties. The length of this flood event created a unique set of challenges for Federal, State and local entities. In many cases, these organizations were conducting response and recovery operations simultaneously. Due to the length of this entire event, the State Emergency Operations Center and the local Emergency Operations Centers remained open for an extended period of time, putting additional strain on many organizations and resources. In response to this disaster, Governor Branstad created the Missouri River Recovery Coordination Task Force to oversee the State’s recovery efforts. The Governor announced the creation of this Task Force on October 17, 2011 and appointed Brigadier General J. Derek Hill, HSEMD Administrator as the chairman. This Task Force would be a temporary group of State agency representatives and interested stakeholders brought together to support the recovery efforts of the Iowa communities impacted by the Missouri River Flood. Collectively, this group would analyze and share damage assessment data, coordinate assistance across various stakeholders, monitor progress, capture best practices and identify lessons learned.