61 resultados para Railroad track settlement


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail service, and promoting improved safety both on the rail system and where the rail system interacts with people and other transportation modes. The Iowa DOT has been developing railroad transportation plans since the late 1970s. The original plan was prepared in 1978 during a time of crisis in the Iowa railroad system. Several large Iowa railroad carriers had filed for bankruptcy and were reorganizing both their businesses and physical systems. The 1978 plan was a guide for determining which railroad lines the state would partner with to preserve and improve the lines. In the 1970s, 1980s and 1990s, the railroad system mileage in Iowa was reduced from about

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Activity book for children about railroads produced by the Iowa Department of Transportation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The 2009 Iowa Railroad System Plan details the state’s role in providing and preserving adequate, safe and efficient rail transportation services to Iowans. The plan is intended to serve as a guide for decision makers and provides a basis for future Iowa DOT policy, funding priorities and programming decisions that affect rail transportation service in Iowa. The primary purpose of the 2009 Iowa Railroad System Plan is to guide the Iowa DOT in pursuing actions that maintain and improve railroad transportation in Iowa. The plan is a component of the Iowa Statewide Transportation Plan known as “Iowa in Motion.” This plan considers railroads from an intermodal perspective. Many commodities that move by rail also move by other modes (principally trucks) during part of their journey from origin to destination. The same is true of persons who use rail passenger service to make trips and who must also rely on other modes to access rail service. Therefore, railroads are part of larger intermodal freight and passenger transportation systems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This section of the 2009 Iowa Railroad System Plan provides background information for the plan, grouped by topic. The resource guide also provides users with important information about the railroad industry and Iowa’s railroad system. The major topics covered below include: • Iowa’s railroad system and carriers. • Railroad freight and Iowa’s economy. • Rail passenger service and Iowa’s economy. • The safety of Iowa’s railroad system, including network safety and security, and railroad and communication interaction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This section of the 2009 Iowa Railroad System Plan provides background information for the plan, grouped by topic. The resource guide also provides users with important information about the railroad industry and Iowa’s railroad system. The major topics covered below include: • Iowa’s railroad system and carriers. • Railroad freight and Iowa’s economy. • Rail passenger service and Iowa’s economy. • The safety of Iowa’s railroad system, including network safety and security, and railroad and communication interaction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa railroad service map of Iowa trains in color.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa railroad map of Iowa trains.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa railroad traffic density.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa railroad map of Iowa trains.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Iowa railroad chronology of Iowa Railroad Abandonments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Observations and experiences of the early growth in the mid to late 1800's of western Iowa of Rev. John Todd of Tabor, Iowa. It also includes his biography.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This map shows railroad traffic usage by Iowa Rail Carriers.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This map shows the chronology of railroad lines that were abandoned in Iowa. It also indicates if the rails are still in place, or if they have been removed or if they are in the process of being removed.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report is a supplement to one issued in late summer 1986 which covered construction on U.S. 71, in Buena Vista County Iowa. The work involved rehabilitation of an older 20 feet wide pavement by placing a four inch thick bonded concrete overlay monolithically with two feet of widening on each side. The work was performed on one lane at a time while construction traffic and limited public traffic used the adjacent traffic lane. When work on the first lane was complete traffic was moved onto it and rehabilitation was completed on the second lane. This report covers the condition of the rehabilitated roadway in May 1987 after the first winter. The condition is described by visual observations, core conditions, and various test results including core compressive strength, direct shear tests on cores for bond strength, profilometer results and delamtect test results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1987, 1.5 km (0.935 mi.) of Spruce Hill Drive in Bettendorf, Iowa was reconstructed. It is an arteriel street with commercial usage on both termini with single family residential dwellings along most of the project. A portland cement concrete (PCC) pavement design was selected, but a 14 day curing period would have been an undue hardship on the residents and commercial businesses. An Iowa DOT Class F fast track concrete was used so the roadway could be used in 7 to 10 days. The Class F concrete with fly ash was relatively sticky and exhibited early stiffening problems and substantial difficulty in obtaining the target entrained air content of 6.5%. These problems were never completely resolved on the project. Annual visual field reviews were conducted through 1996. In November 1991, severe premature distress was identified on the westbound two lanes of the full width replacement. The most deteriorated section in a sag vertical, 152 m (500 ft.) of the westbound roadway, was replaced in 1996. Premature distress has been identified on a dozen other conventional PCC Iowa pavements constructed between 1983 and 1989, so the deterioration may not be related to the fact that it was fast track pavement.