61 resultados para Project 2006-036-A : Multi Outcomes Construction Policy
Resumo:
Various test methods exist for measuring heat of cement hydration; however, most current methods require expensive equipment, complex testing procedures, and/or extensive time, thus not being suitable for field application. The objectives of this research are to identify, develop, and evaluate a standard test procedure for characterization and quality control of pavement concrete mixtures using a calorimetry technique. This research project has three phases. Phase I was designed to identify the user needs, including performance requirements and precision and bias limits, and to synthesize existing test methods for monitoring the heat of hydration, including device types, configurations, test procedures, measurements, advantages, disadvantages, applications, and accuracy. Phase II was designed to conduct experimental work to evaluate the calorimetry equipment recommended from the Phase I study and to develop a standard test procedure for using the equipment and interpreting the test results. Phase II also includes the development of models and computer programs for prediction of concrete pavement performance based on the characteristics of heat evolution curves. Phase III was designed to study for further development of a much simpler, inexpensive calorimeter for field concrete. In this report, the results from the Phase I study are presented, the plan for the Phase II study is described, and the recommendations for Phase III study are outlined. Phase I has been completed through three major activities: (1) collecting input and advice from the members of the project Technical Working Group (TWG), (2) conducting a literature survey, and (3) performing trials at the CP Tech Center’s research lab. The research results indicate that in addition to predicting maturity/strength, concrete heat evolution test results can also be used for (1) forecasting concrete setting time, (2) specifying curing period, (3) estimating risk of thermal cracking, (4) assessing pavement sawing/finishing time, (5) characterizing cement features, (6) identifying incompatibility of cementitious materials, (7) verifying concrete mix proportions, and (8) selecting materials and/or mix designs for given environmental conditions. Besides concrete materials and mix proportions, the configuration of the calorimeter device, sample size, mixing procedure, and testing environment (temperature) also have significant influences on features of concrete heat evolution process. The research team has found that although various calorimeter tests have been conducted for assorted purposes and the potential uses of calorimeter tests are clear, there is no consensus on how to utilize the heat evolution curves to characterize concrete materials and how to effectively relate the characteristics of heat evolution curves to concrete pavement performance. The goal of the Phase II study is to close these gaps.
Resumo:
Traffic volume increases and an aging infrastructure create the need for reconstruction, rehabilitation, and maintenance of existing facilities. As more motorists feel that delays should be minimal during highway renewal projects, lane closures that reduce capacity through the work zone should not create unreasonable delays. In order to facilitate the determination of when a lane closure is permitted during the day, some state transportation agencies (STAs) have developed lane closure policies, or strategies, that they use as guidance in determining daily permitted lane closure times. Permitted lane closure times define what times of the day, week, or season a lane closure is allowed on a facility and at a specific location or segment. This research addresses the lane closure policies of several STAs that were reputed to have good lane closures policies or strategies and that were selected by the project advisory committee for further research.
Resumo:
Audit report of the Governor's Office of Drug Control Policy for the year ended June 30, 2006
Resumo:
This monthly report from the Iowa Department of Transportation is about the water quality management of Iowa's rivers, streams and lakes.
Resumo:
Agreed upon procedures report for evaluating compliance with provisions of IowaCare (Project No 11-W-00189/7) within the Iowa Department of Human Services for the year ended June 30, 2006
Resumo:
The purpose of this Iowa manual is to serve as a guide, provide solutions, and offer suggestions on construction sites to comply with Iowa's current soil erosion and storm water runoff regulations. This need is particularly important when land undergoes a land use change. Information provided in this manual will be helpful to land owners, developers, consultants, contractors, planners, local government, as well as the general public. This manual is intended to provide techniques that will meet the mandates of current legislation. Innovations that will benefit the user and still provide effective control are encouraged.
Resumo:
The 2005 Iowa Youth Survey (IYS) State of Iowa report was designed to help state-level planners identify youth development-related needs, develop relevant programs, and assess the outcomes of those programs. These data can help you better understand our youth and their needs. They can also help you assess the strengths and weaknesses of our schools, families, and communities from the young person’s perspective. In addition, the data in this report help the state obtain funds for a wide variety of programs. At every step of the process–from needs identification, to program development and implementation, to program assessment–the 2005 IYS data will prove to be a valuable resource. The state report can also help Iowa’s schools, area education agencies, and counties assess their relative strengths and weaknesses. The grades 6, 8, and 11, as well as male and female percentages reported in district-level, AEA-level, county-level, and other 2005 IYS reports can be compared with the respective state report percentages. The higher the proportion of students in each of these columns that completed usable IYS questionnaires, the more likely the comparisons with the state report percentages will be unbiased. Such comparisons should be considered exploratory, but for the most part are likely to be useful.
Resumo:
The first part of a three year plan to evaluate and recommend improvements to Iowa's Juvenile Courts.
Resumo:
In Iowa, hundreds of people die and thousands more are injured on our public roadways each year despite decades of efforts to end this su�ffering. Past safety e�efforts have resulted in Iowans bene�fiting from one of the best state roadway systems in the nation. Due to multi-agency e�efforts, Iowa has achieved 90 percent compliance with the state’s mandatory front seat belt use law, earned the nation’s second-lowest percent of alcohol involvement in fatal crashes and made safety gains in system-wide roadway design and operational improvements. Despite these ongoing e�efforts, the state’s annual average of 445 deaths and thousands of life-changing injuries is a tragic toll and an unacceptable public health epidemic in our state. To save more lives on our roadways, Iowans must be challenged to think �differently about lifesaving measures addressing young drivers, safety belts, and motorcycle helmet use and accept innovative designs such as roundabouts. Iowa must apply evidence-based strategies and create a safety culture that motivates all citizens to travel more responsibly. They must demand a lower level of tolerance for Iowa’s roadway deaths and injuries. The Iowa Comprehensive Highway Safety Plan (CHSP) engages diverse safety stakeholders and charts the course for this state, bringing to bear sound science and the power of shared community values to change the culture and achieve a standard of safer travel for our citizens. How many roadway deaths and injuries are too many? Iowa’s highway safety stakeholders believe that, “One death is one too many” and e�effective culture-changing policy and program strategies must be implemented to help reduce this death toll from an annual average of 445 to 400 by the year 2015.
Resumo:
This report is respectfully submitted in satisfaction of the following Senate File 169 requirement, as approved by the 2005 Iowa Legislature: “The Drug Policy Coordinator shall report, in a joint meeting, to the Committee on Judiciary of the Senate and the Committee on Public Safety of the House of Representatives in January 2006 and in January 2007, the effects of this Act on methamphetamine abuse and related criminal activity.” (*Please note that all data contained in this document are preliminary, based on the most recent information available to the Governor’s Office of Drug Control Policy.)
Resumo:
Five Seasons Transportation & Parking (FSTP) and the Johnson County Council of Governments (JCCOG) are interested in evaluating the feasibility of prospective passenger rail service(s) that would operate over existing trackage of the Cedar Rapids and Iowa City Railway Company (CRANDIC), seen below left, and/or the Iowa Interstate Railroad System (IAIS), seen below right, connecting Cedar Rapids, Iowa City and the Amana Colonies. To perform the study, FSTP and JCCOG selected R.L. Banks & Associates, Inc. (RLBA) as Prime Contractors, HNTB Corporation (HNTB) and Snyder & Associates, Inc. (Snyder) as Subcontractors, hereafter Consultant Team. Both railroads participated in the study and contributed time and resources, as did many local government and civic organizations. The purpose of the study is to determine whether it is feasible to establish regularly scheduled passenger rail service and/or special event excursion rail service, in conjunction with the Five Seasons Transit system, Iowa City Transit, East Central Iowa Transit, Coralville Transit and the University of Iowa CAMBUS.
Resumo:
The I-74 Iowa-Illinois Corridor Study has been progressing since the last newsletter and the Public Information Meetings in July of 2002, and the Advisory Committee has been involved in every step. Our goal has been and continues to be ensuring that community priorities and goals are reflected in the I-74 project, and that local concerns are considered.
Resumo:
In July 2006, construction began on an accelerated bridge project in Boone County, Iowa that was composed of precast substructure elements and an innovative, precast deck panel system. The superstructure system consisted of full-depth deck panels that were prestressed in the transverse direction, and after installation on the prestressed concrete girders, post-tensioned in the longitudinal direction. Prior to construction, laboratory tests were completed on the precast abutment and pier cap elements. The substructure testing was to determine the punching shear strength of the elements. Post-tensioning testing and verification of the precast deck system was performed in the field. The forces in the tendons provided by the contractor were verified and losses due to the post-tensioning operation were measured. The stress (strain) distribution in the deck panels due to the post-tensioning was also measured and analyzed. The entire construction process for this bridge system was documented. Representatives from the Boone County Engineers Office, the prime contractor, precast fabricator, and researchers from Iowa State University provided feedback and suggestions for improving the constructability of this design.
Resumo:
The Data Warehouse Replacement Project includes updated County Health Snapshot reports. The snapshots provide an overview of key health indicators for local communities. They contain county-level measures that are organized into eight categories. The categories are asthma, cancer, health behaviors and outcomes, heart disease and other chronic conditions, infectious disease, mortality and injury prevention, population statistics and reproductive outcomes. The updated county health snapshots include almost forty new chronic disease indicators in addition to all of the indicators in the existing snapshots.There will be two different reports available in the Data Warehouse replacement system. One of the reports is a multi-year county health snapshot. This report has a similar format to the previous county health snapshot report in the current Data Warehouse. It will display multiple years of data for a single county. The data will be for the most current year available and the two years prior. The state values for the current year will also be included.
Resumo:
The Iowa Department of Transportation (Iowa DOT) currently performs wetland mitigation on a project-by-project basis. At the same time, other agencies like the Iowa Department of Natural Resources and Natural Resource Conservation Service are performing wetland restoration projects, and counties and cities may be mitigating wetland losses as well. This project examined the feasibility of developing cooperative wetland mitigation projects in order to utilize state and local resources more efficiently to benefit both Iowa and local communities. The project accomplished the following objectives: (1) Identified and characterized cooperative wetland mitigation programs nationwide; (2) Developed a needs assessment through a survey of state, county, and large city agencies in Iowa to describe wetland mitigation programs and determine challenges with mitigation and program improvements, including long-term risks associated with maintenance and monitoring programs; (3) Surveyed state, county, and city agencies and organizations to identify resources available for developing cooperative mitigation projects and procedures; (4) Developed a conceptual framework for cooperative wetland mitigation.