37 resultados para Productive Sector Projects


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective of phase one of this research was to assess the degree to which currently employed Iowa Department of Transportation (DOT) employees would be affected by a more aggressive policy to recruit and retain women and minority engineers. The DOT's "Future Agenda" was used as a baseline to focus on efforts to update and implement a recruitment plan that would target underrepresented classes. The primary question that emerged out of phase one was how could the Iowa DOT strengthen its ties with Iowa State University (ISU) to produce increased numbers of in-state applicants for engineering positions. This introduced the objective of phase two, which was to identify problem areas resulting in unacceptably high attrition rates for women, minorities, and to a lesser degree, Caucasian men in the College of Engineering at ISU, particularly Civil and Construction Engineering (CCE). Past research has focused on (1) projected shortages of qualified civil engineers, (2) the obstacles confronting women in a traditionally male-oriented profession, and (3) minorities who are often unprepared to succeed in the rigors of an engineering curriculum because of a lack of academic preparedness. The researchers in this study, in contrast, chose to emphasize institutional reasons why women, minorities, and some Caucasian men often feel a sense of isolation in the engineering program. It was found that one of the key obstacles to student retention is the lack of visibility of the civil engineering profession. The visibility problem led to the hypothesis that many engineering students do not have a clear conception of what the practice of civil engineering entails. It was found that this may be a better predictor of attrition than the stereotypical assumption that a majority of students leave their engineering programs because they are not academically able to compete. Recommendations are offered to strengthen the ties between ISU's Department of CCE and the Iowa DOT in order to counter the visibility issue. It was concluded that this is a vital step because over the next 5-15 years 40% of DOT engineers currently employed will be phasing into retirement. If the DOT expects to draw sufficient numbers of engineers from within the state of Iowa and if increasing numbers of them are to be women and minorities, a university connection will help to produce the qualified applicants to fulfill this need.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Power Fund Awarded Projects from the Office of Energy Independence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Power Fund Awarded Projects from the Office of Energy Independence.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Highway Research Project HR-392 was undertaken to evaluate cold in-place asphalt recycled (CIR) projects in the State of Iowa. The research involved assessment of performance levels, investigation of factors that most influence pavement performance and economy, and development of guidelines for CIR project selection. The performance was evaluated in two ways: Pavement Condition Indices (PCI, U.S. Corps of Engineers) were calculated and overall ratings were given on ride and appearance. A regression analysis was extrapolated to predict the future service life of CIR roads. The results were that CIR roads within the State of Iowa, with less than 2000 annual average daily traffic (AADT), have an average predicted service life of fifteen to twenty-six years. Subgrade stability problems can prevent a CIR project from being successfully constructed. A series of Dynamic Cone Penetrometer (DCP) tests were conducted on a CIR project that experienced varying levels of subgrade failure during construction. Based on this case study, and supporting data, it was determined that the DCP test can be used to evaluate subgrades that have insufficient stability for recycling. Overall, CIR roads in Iowa are performing well. It appears that the development of transverse cracking has been retarded and little rutting has occurred. Contracting agencies must pay special attention to the subgrade conditions during project selection. Because of its performance, CIR is a recommended method to be considered for rehabilitating aged low volume (<2000 AADT) asphalt concrete roads in Iowa.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report contains findings on 52 lake restoration projects. It summarizes the interpretation of the detailed project reports, maps, and cost estimates.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In work-zone configurations where lane drops are present, merging of traffic at the taper presents an operational concern. In addition, as flow through the work zone is reduced, the relative traffic safety of the work zone is also reduced. Improving work-zone flow-through merge points depends on the behavior of individual drivers. By better understanding driver behavior, traffic control plans, work zone policies, and countermeasures can be better targeted to reinforce desirable lane closure merging behavior, leading to both improved safety and work-zone capacity. The researchers collected data for two work-zone scenarios that included lane drops with one scenario on the Interstate and the other on an urban arterial roadway. The researchers then modeled and calibrated these scenarios in VISSIM using real-world speeds, travel times, queue lengths, and merging behaviors (percentage of vehicles merging upstream and near the merge point). Once built and calibrated, the researchers modeled strategies for various countermeasures in the two work zones. The models were then used to test and evaluate how various merging strategies affect safety and operations at the merge areas in these two work zones.