37 resultados para J.M. Butler


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Reaudit report on the North Butler Community School District for the period July 1, 2013 through June 30, 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Butler County Area Solid Waste Commission for the year ended June 30, 2015

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Butler County, Iowa for the year ended June 30, 2015

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pieces of Iowa’s Past, published by the Iowa State Capitol Tour Guides weekly during the legislative session, features historical facts about Iowa, the Capitol, and the early workings of state government. All historical publications are reproduced here with the actual spelling, punctuation, and grammar retained. January 18, 2012 THIS WEEK: Report by Annie Wittenmyer, State Sanitary Agent BACKGROUND: The 10th General Assembly convened on January 11, 1864, and adjourned on March 29—a 79-day session. There were 138 members in the legislature. The members included 42 Republicans in the Senate and 87 Republicans in the House of Representatives. Democrats numbered four in the Senate and five in the House. Jacob Butler was the Speaker of the House, and Enoch W. Eastman was the Lt. Governor presiding in the Senate. William Stone was Iowa’s governor. Stone was inaugurated on January 14, 1864. He was 36 years old. Governor Stone, a friend of President Abraham Lincoln, rode Lincoln’s funeral train to Springfield, Illinois

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Record flooding occurred May 17-20, 1999, in the Volga and Wapsipinicon River Basins following thunderstorm activity over northeast Iowa. On Sunday, May 16, between 6 and 8 inches of rain fell during a 24- hour period over portions of Bremer, Butler, and Fayette Counties. Highest rainfall during this 24-hour period was 8.3 inches recorded north of Oelwein in southwest Fayette County. A peak discharge of 29,800 cubic feet per second in the Volga River at Mederville, 53,900 cubic feet per second in the Turkey River at Garber, and 31, 100 cubic feet per second in the Wapsipinicon River at Independence set new peak discharge records. The peak discharge at Garber was greater than a theoretical 500-year flood, and the peak discharge at Independence was the equivalent of a 90- year flood. Information about the basins, rain storms, flooding, and a profile of high water marks are presented for selected intervals along the Volga River, Wapsipinicon River, Crane Creek, Little Wapsipinicon River, and Otter Creek.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Iowa Highway Commission Project HR-33, "Characteristics of Chemically Treated Roadway Surfaces", was investigated at the Iowa Engineering Experiment Station under Project 375-S. The purpose of the project as originally proposed was to study the physical and chemical characteristics of chemically treated roadway surfaces. All chemical treatments were to be included, but only sodium chloride and calcium chloride treated roadways were investigated. The uses of other types of chemical treatment were not discovered until recently, notably spent sulfite liquor and a commercial additive. Costs of stabilized secondary roads in Hamilton County averaged $4300.00 per mile even though remanent soil-aggregate material was used. The cost of similar roads in Franklin County was $4400.00 per mile. The Franklin County road surfaces were constructed entirely from materials that were hauled to the road site. Costs in Butler County were a little over $3000.00 per mile some eight years ago. Chemical investigations indicate that calcium chloride and sodium chloride are lost through leaching. Approximately 95 percent of the sodium chloride appears to have been lost, and nearly 65 percent of the calcium chloride has disappeared. The latter value may be much in error since surface dressings of calcium chloride are commonly used and have not been taken into account. Clay contents of the soil-aggregate-chemical stabilized roads range from about 6 to ll percent, averaging 8 or 9 percent. The thicknesses of stabilized mats are usually 2 to 4 inches, with in-place densities ranging from 130 to 145 pcf. Generally the densities found in sodium chloride stabilized roads were slightly higher than those found in the calcium chloride stabilized roads.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Lower Coldwater and Palmer Creeks in Butler and Floyd counties are subwatersheds of the Cedar River, which provides drinking water to Cedar Rapids, IA. The increasing concentration of nitrate+nitrate in the river is of concern to the Cedar Rapids water utility, and IDNR snapshot monitoring shows Coldwater and Palmer to be significant potential sources (above the 90th percentile for subwatersheds monitored). Both creeks are also on the Iowa Section 303(d) list of impaired waters (aquatic life). Citizens of these predominantly agricultural watersheds organized the Coldwater-Palmer Watershed Improvement Association to deal proactively with nonpoint source pollutants from crop and livestock operations through a performance-based environmental management program. The locally-adapted program implemented by the Coldwater-Palmer watershed council rewards participants for environmental accomplishments - soil quality improvement and nutrient source reduction as measured by accepted, scientifically-based tests and models. Most of the locally­appropriate BMPs used to improve performance are undertaken voluntarily at participants' initiative. WIRB funds will be combined with funding from the Iowa Com Growers Association and significant in-kind support from the Cedar River Watershed Monitoring Coalition, Iowa State University Extension and other partners. The project will result in sustainable reduction in nutrient loading achieved with voluntary participation of a majority of watershed farm operators.