125 resultados para Highway rapid passenger transport
Resumo:
This report is submitted as required per Code of Iowa section 327J.3(5), "The director shall report annually to the general assembly concerning the development and operation of the midwest regional rail system and the state's passenger rail service." The Midwest Regional Rail Initiative (MWRRI) is a nine-state effort to develop an implementation plan for a 3,000-mile, high-speed rail system hubbed in Chicago. Studies done since 1996 have concluded that such a regional system, including a line from Chicago to Omaha through Davenport, Iowa City and Des Moines, is viable. Most of the system would be upgraded to allow 110 mile-per-hour service. Some low volume lines, including the Iowa portions, would be upgraded for 79 mile-per-hour service. The nine-state coalition released an updated 2004 executive report for the system. As reported, the updated cost estimate for the Chicago to Omaha corridor, which includes a branch to Quincy, Ill., is $638 million for infrastructure and $167 million for rolling stock. These costs are higher than first estimated in 1998 and are given in 2002 dollars, (not adjusted for the cost of inflation). Operating subsidies would be required during an extended start-up phase. The allocation of these subsidy costs among the various states has not been determined, and is still a subject for analysis and negotiation. Little progress on implementation is expected unless a federal funding package is passed for passenger rail initiatives. Continued congressional discussion on policy directions relative to Amtrak clouds the issue of passenger rail funding. However, Congress is expected to address passenger rail issues and funding in 2007. Participation of the Iowa Department of Transportation in the MWRRI is authorized under Iowa Code section 327J.3.
Resumo:
Various test methods exist for measuring heat of cement hydration; however, most current methods require expensive equipment, complex testing procedures, and/or extensive time, thus not being suitable for field application. The objectives of this research are to identify, develop, and evaluate a standard test procedure for characterization and quality control of pavement concrete mixtures using a calorimetry technique. This research project has three phases. Phase I was designed to identify the user needs, including performance requirements and precision and bias limits, and to synthesize existing test methods for monitoring the heat of hydration, including device types, configurations, test procedures, measurements, advantages, disadvantages, applications, and accuracy. Phase II was designed to conduct experimental work to evaluate the calorimetry equipment recommended from the Phase I study and to develop a standard test procedure for using the equipment and interpreting the test results. Phase II also includes the development of models and computer programs for prediction of concrete pavement performance based on the characteristics of heat evolution curves. Phase III was designed to study for further development of a much simpler, inexpensive calorimeter for field concrete. In this report, the results from the Phase I study are presented, the plan for the Phase II study is described, and the recommendations for Phase III study are outlined. Phase I has been completed through three major activities: (1) collecting input and advice from the members of the project Technical Working Group (TWG), (2) conducting a literature survey, and (3) performing trials at the CP Tech Center’s research lab. The research results indicate that in addition to predicting maturity/strength, concrete heat evolution test results can also be used for (1) forecasting concrete setting time, (2) specifying curing period, (3) estimating risk of thermal cracking, (4) assessing pavement sawing/finishing time, (5) characterizing cement features, (6) identifying incompatibility of cementitious materials, (7) verifying concrete mix proportions, and (8) selecting materials and/or mix designs for given environmental conditions. Besides concrete materials and mix proportions, the configuration of the calorimeter device, sample size, mixing procedure, and testing environment (temperature) also have significant influences on features of concrete heat evolution process. The research team has found that although various calorimeter tests have been conducted for assorted purposes and the potential uses of calorimeter tests are clear, there is no consensus on how to utilize the heat evolution curves to characterize concrete materials and how to effectively relate the characteristics of heat evolution curves to concrete pavement performance. The goal of the Phase II study is to close these gaps.
Resumo:
Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2006
Resumo:
The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: Rapid Tax-Refund Loans A very costly way to gain just a few days on tax refunds.
Resumo:
The Highway Division of the Iowa Department of Transportation (Iowa DOT) engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; second, to identify and implement improved engineering and management practices. This report, entitled “Iowa Highway Research Board Research and Development Activities FY2007” is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund respectively. It is a report of the status of research and development projects, which were in progress on June 30, 2007; it is also a report on projects completed during the fiscal year beginning July 1, 2006, and ending June 30, 2007. Detailed information on each of the research and development projects mentioned in this report is available in the Research and Technology Bureau in the Highway Division of the Iowa Department of Transportation.
Resumo:
This report is submitted as required per Iowa Code section 327J.3(5), "The director shall report annually to the general assembly concerning the development and operation of the midwest regional rail system and the state's passenger rail service."
Resumo:
The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: Avoid Rapid Tax-Refund Loans
Resumo:
RESEARCH AND DEVELOPMENT The Highway Division of the Iowa Department of Transportation (Iowa DOT) engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; second, to identify and implement improved engineering and management practices. This report, entitled "Iowa Highway Research Board Research and Development Activities FY2008" is submitted in compliance with Sections 310.36 and 3 I2.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund respectively. It is a report of the status of research and development projects in progress on June 30, 2008; it is also a report on projects completed during the fiscal year beginning July 1, 2007, and ending June 30, 2008. Detailed information on each of the research and development projects mentioned in this report is available in the Research and Technology Bureau in the Highway Division of the Iowa Department of Transportation. IOWA HIGHWAY RESEARCH BOARD In developing a progressive, continuing and coordinated program of research and development, the Highway Division is assisted by the Iowa Highway Research Board. This advisory group was established in 1949 by the Iowa State Highway Commission to respond to the research denoted in Section 310.36 of the Code of Iowa and now is denoted by 312.3A. The Research Board consists of 15 regular members: seven Iowa county engineers, four Iowa DOT engineers, one representative from Iowa State University, one from The University of Iowa, and two engineers employed by Iowa municipalities. Each regular member may have an alternate who will serve at the request of the regular member. The regular members and their alternates are appointed for a three-year term. The membership of the Research Board as of June 30, 2008, is listed in Table I. The Research Board held nine regular meetings during the period ofJuly 1, 2007, to June 30, 2008. Suggestions for research and development were reviewed at these meetings and recommendations were made by the Board.
Resumo:
This report is submitted as required per Code of Iowa section 327J.3(5), "The director shall report annually to the general assembly concerning the development and operation of the midwest regional rail system and the state's passenger rail service."
Resumo:
The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: Avoid Rapid Tax-Refund Loans
Resumo:
The Attorney General’s Consumer Protection Division receives hundreds of calls and consumer complaints every year. Follow these tips to avoid unexpected expense and disappointments. This record is about: Avoid Rapid Tax-Refund Loans
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
RESEARCH AND DEVELOPMENT The Highway Division of the Iowa Department of Transportation (Iowa DOT) engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; second, to identify and implement improved engineering and management practices. This report, entitled "Iowa Highway Research Board Research and Development Activities FY2008" is submitted in compliance with Sections 310.36 and 3 I2.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund respectively. It is a report of the status of research and development projects in progress on June 30, 2008; it is also a report on projects completed during the fiscal year beginning July 1, 2007, and ending June 30, 2008. Detailed information on each of the research and development projects mentioned in this report is available in the Research and Technology Bureau in the Highway Division of the Iowa Department of Transportation. IOWA HIGHWAY RESEARCH BOARD In developing a progressive, continuing and coordinated program of research and development, the Highway Division is assisted by the Iowa Highway Research Board. This advisory group was established in 1949 by the Iowa State Highway Commission to respond to the research denoted in Section 310.36 of the Code of Iowa and now is denoted by 312.3A. The Research Board consists of 15 regular members: seven Iowa county engineers, four Iowa DOT engineers, one representative from Iowa State University, one from The University of Iowa, and two engineers employed by Iowa municipalities. Each regular member may have an alternate who will serve at the request of the regular member. The regular members and their alternates are appointed for a three-year term. The membership of the Research Board as of June 30, 2008, is listed in Table I. The Research Board held nine regular meetings during the period ofJuly 1, 2007, to June 30, 2008. Suggestions for research and development were reviewed at these meetings and recommendations were made by the Board.
Resumo:
Annual Highway Safety Report for Iowa Department of Public Safety.
Resumo:
The Highway Division of the Iowa Department of Transportation (Iowa DOT) engages in research and development for two reasons: first, to find workable solutions to the many problems that require more than ordinary, routine investigation; and second, to identify and implement improved engineering and management practices. This report, entitled ―Iowa Highway Research Board Research and Development Activities FY2009‖ is submitted in compliance with Sections 310.36 and 312.3A, Code of Iowa, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in progress on June 30, 2009. It is also a report on projects completed during the fiscal year beginning July 1, 2008 and ending June 30, 2009. Detailed information on each of the research and development projects mentioned in this report is available from the Research and Technology Bureau, Highway Division, Iowa Department of Transportation. All approved reports are also online for viewing at: www.iowadot.gov/operationsresearch/reports.aspx.