103 resultados para Fish habitat improvement


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A plan for improvement of Iowa's Juvenile Courts handling of Child in Need of Assistance cases. A brief report focusing on just the plan for improvement pulled from the main report: A Study of Iowa's Court Performance in Child Abuse and Neglect Cases and Plan for Improvement.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Concerning improvements to the State Capitol Grounds including placement of the Allison memorial and Soldiers and Sailor's momuments; removal of heating plant and relieving the state of coal, ashes, gas and smoke; provision of office space to the Adjutant General; an eventual executive mansion; provision of office buildings; and for a Supreme Court building where together with its library auxiliaries will have perpetual growth and constant accessbility; and propose restoration of natural scenic value of the capitol site.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On June 24, 2010, the Rebuild Iowa Office (RIO) held a discussion-based tabletop exercise for the purpose of creating a framework to support disaster recovery coordination within the State of Iowa. The purpose of this report is to provide an overview of the tabletop exercise, summarize and analyze exercise results, identify strengths which should be maintained and built upon, identify areas for further improvement, and support development of recommendations and corrective actions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document serves as a reference guide to local planning agencies for the development of their regional Transportation Improvement Program (TIP) and the Statewide Transportation Improvement Program (STIP).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Mid-Iowa School Improvement Consortium, Carlisle, Iowa for the year ended June 30, 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

On June 24, 2010, the Rebuild Iowa Office (RIO) held a discussion-based tabletop exercise for the purpose of creating a framework to support disaster recovery coordination within the State of Iowa. The exercise design team was composed of RIO and Iowa Homeland Security and Emergency Management Division (HSEMD) staff. Initial planning for the Iowa Disaster Recovery Tabletop Exercise began in February 2010, in response to recommendations by the Rebuild Iowa Advisory Commission and the Rebuild Iowa Coordinating Council. Both of these groups were organized in direct response to the 2008 Iowa disasters to help establish a path for Iowa’s recovery and monitor progress toward meeting established goals. Recommendations included formalizing the responsibilities of the RIO as they relate to 2008 disasters, capturing lessons learned, and determining what a recovery model should look like for Iowa’s future disasters.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Mid-Iowa School Improvement Consortium, Carlisle, Iowa for the year ended June 30, 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This Tier 2 Environmental Assessment (EA) presents the results of studies and analyses conducted to determine the potential impacts of proposed improvements in Segment 3 of the Council Bluffs Interstate System (CBIS) in the Council Bluffs metropolitan area. This document is tiered to the Tier 1 Draft and Final Environmental Impact Statements (EIS) that evaluated impacts of the overall CBIS Improvements Project, which includes five segments of independent utility1 This EA on Segment 3 of the Project is divided into the following sections: and encompasses 18 mainline miles of Interstate and 14 interchanges along Interstate 80 (I-80), Interstate 29 (I-29), and Interstate 480 (I-480). More information about the tiering process is found below under Project Background. • Section 1 provides background information on the Project and discusses the relationship between the earlier Tier 1 EIS and this Tier 2 EA. It also discusses the proposed action and the area studied, the purpose of the Project, and the need for the Project based on transportation problems that currently exist or are expected in the future. • Section 2, Alternatives, identifies the range of alternatives considered for Segment 3 to address the transportation problems identified in Section 1. It also identifies the alternatives retained for further study in this EA and the preferred Segment 3 alternative. • Section 3, Affected Environment and Environmental Consequences, describes the general environment for each resource affected by the proposed improvements. It also describes the potential environmental impacts of the Segment 3 Project and methods to avoid, minimize, and mitigate impacts. • Section 4, Disposition, lists the agencies and organizations that will receive copies of this EA and the locations at which this EA will be available for public review. • Section 5, Comments and Coordination, summarizes the agency coordination and public involvement efforts in conjunction with the Segment 3 Project. • Section 6, Conclusion and Recommendation, summarizes resource impacts. • Section 7, References, lists the sources cited in this EA. For Segment 3, the Federal Highway Administration (FHWA) and Iowa Department of Transportation (Iowa DOT) determined that an EA is the appropriate level of Tier 2 study to comply with the National Environmental Policy Act (NEPA) requirements. The primary purpose of an EA is to clearly establish the significance of a project’s environmental impacts. That analysis is included in this document.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a multiyear federal transportation authorization bill in place. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended nine times because a new authorization has not yet been enacted. The current extension will expire June 30, 2012.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

CMS has established the medicaid Quality Improvement which serves to fulfill the objectives of they Medicaid Quality goal established through the Federal Government Performance and Results At. One of the objectives of the goal calls for the Centers foe Medicare and Medicaid Services to work in partnership with State Medicaid Directors to develop a Nation Medicaid Quality Framework that will articulate broad principles and a common vision of quality for the program.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on Mid-Iowa School Improvement Consortium, Carlisle, Iowa for the year ended June 30, 2012

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This document describes planned investments in Iowa’s multimodal transportation system including aviation, transit, railroads, trails, and highways. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a multiyear federal transportation authorization bill in place and having a sustainable and solvent federal Highway Trust Fund. The most recent federal authorization, Moving Ahead for Progress in the 21st Century (MAP-21), will expire September 30, 2014. At the same time that MAP-21 expires and absent Congressional action, the federal Highway Trust Fund will no longer be able provide funding at current levels resulting in up to a 90 percent reduction in federal highway funding for federal fiscal year 2015. These two issues provide funding uncertainty with this program in fiscal years 2015 and beyond.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research is reported which attempted to identify construction procedures that will provide an improved centerline joint on asphalt concrete pavements. Various construction procedures and their evaluation are described. Core densities were made and visual inspections were made 3 years after construction. Center cracking was measured at 4, 5, and 6 years. The only procedure to rank the same when comparing cracking and density (delete the 1:1 slope shoe on the edge) is described. This procedure had the highest average density and also the least cracking through 1985. This method provided the best performance for 4 years after construction and involved the removal of the 1:1 slope shoe from the paver when placing the surface course. This method had 9.0% cracked after 4 years and 100% cracked after 6 years of service.