48 resultados para Fire extinction -- Equipment and supplies


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The resilient modulus (MR) input parameters in the Mechanistic-Empirical Pavement Design Guide (MEPDG) program have a significant effect on the projected pavement performance. The MEPDG program uses three different levels of inputs depending on the desired level of accuracy. The primary objective of this research was to develop a laboratory testing program utilizing the Iowa DOT servo-hydraulic machine system for evaluating typical Iowa unbound materials and to establish a database of input values for MEPDG analysis. This was achieved by carrying out a detailed laboratory testing program designed in accordance with the AASHTO T307 resilient modulus test protocol using common Iowa unbound materials. The program included laboratory tests to characterize basic physical properties of the unbound materials, specimen preparation and repeated load triaxial tests to determine the resilient modulus. The MEPDG resilient modulus input parameter library for Iowa typical unbound pavement materials was established from the repeated load triaxial MR test results. This library includes the non-linear, stress-dependent resilient modulus model coefficients values for level 1 analysis, the unbound material properties values correlated to resilient modulus for level 2 analysis, and the typical resilient modulus values for level 3 analysis. The resilient modulus input parameters library can be utilized when designing low volume roads in the absence of any basic soil testing. Based on the results of this study, the use of level 2 analysis for MEPDG resilient modulus input is recommended since the repeated load triaxial test for level 1 analysis is complicated, time consuming, expensive, and requires sophisticated equipment and skilled operators.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation Materials Laboratory personnel announced in early 1982 a process to produce a road deicer consisting of sand grains coated with calcium magnesium acetate (CMA). From that point forward the Iowa DOT began searching for a means of economically producing CMA to their concept. During 1983 and 1984 the first attempts devised for commercially producing CMA were attempted by the W.G. Block Company, Davenport, Iowa, under Iowa Highway Research Board Project HR-253. This first attempt at commercially producing CMA was accomplished by the use of concrete transit mixer equipment. Even though this procedure proved successful in the batch mixing of CMA, the need for higher production rates to reduce the cost per ton still existed. During the fall of 1984, Cedarapids Inc, Cedar Rapids, Iowa, proposed to Iowa DOT personnel the application of their technology to a continuous mixing concept for CMA. Arrangements were made for the continuous test mixing of 60 to 100 tons of CMA/sand deicer. This report covers the production effort, description and results of procedures outlined in Cedarapids Inc's proposal of September 19, 1984. The objectives of this research were: 1. To produce the CMA/sand deicer concept on a continuous mixing basis to Iowa DOT CMA concentration levels. 2. To evaluate the results of preheating the carrying vehicle (sand) prior to CMA ingredient introduction. 3. To analyze the feasibility of production equipment and procedures necessary for portable and/or stationary applications of continuous mixing concepts.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Several primary techniques have been developed through which soil aggregate road material properties may be improved. Such techniques basically involve a mechanism of creating a continuous matrix system of soil and/or aggregate particles, interlocked through the use of some additive such as portland cement, lime, or bituminous products. Details by which soils are stabilized vary greatly, but they are dependent on the type of stabilizing agent and nature of the soil, though the overall approach to stabilization has the common feature that improvement is achieved by some mechanism(s) forcing individual particles to adhere to one another. This process creates a more rigid material, most often capable of resisting the influx of water during freezing, loss of strength due to high moisture content and particle dispersion during thawing, and loss of strength due to migration of fines and/or water by capillarity and pumping. The study reported herein, took a new and relatively different approach to strengthening of soils, i.e., improvement of roadway soils and/or soil-aggregate materials by structural reinforcement with randomly oriented fibers. The purpose of the study was to conduct a laboratory and field investigation into the potential of improving (a) soil-aggregate surfaced and subgrade materials, including those that are frost-prone and/or highly moisture susceptible, and (b) localized base course materials, by uniting such materials through fibrous reinforcement. The envisioned objective of the project was the development of a simple construction technique(s) that could be (a) applied on a selective basis to specific areas having a history of poor performance, or (b) used for improvement of potential base materials prior to surfacing. Little background information on such purpose and objective was available. Though the envisioned process had similarities to fibrous reinforced concrete, and to fibrous reinforced resin composites, the process was devoid of a cementitious binder matrix and thus highly dependent on the cohesive and frictional interlocking processes of a soil and/or aggregate with the fibrous reinforcement; a condition not unlike the introduction of reinforcing bars into a concrete sand/aggregate mixture without benefit of portland cement. Thus the study was also directed to answering some fundamental questions: (1) would the technique work; (2) what type or types of fibers are effective; (3) are workable fibers commercially available; and (4) can such fibers be effectively incorporated with conventional construction equipment, and employed in practical field applications? The approach to obtaining answers to these questions, was guided by the philosophy that an understanding of basic fundamentals was essential to developing a body of engineering knowledge, that would serve as the basis for eventual development of design procedures with fibrous products for the applications previously noted.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The primary objectives of the Electronic Bulletin Board System (BBS) project were to: (1) Provide an electronic communication tool which would link city and county engineering offices to each other and to other governmental agencies for messaging and data sharing; (2) Provide a dial-up site for reference information or files accessible on-demand; and (3) Provide a "stepping stone" to the world of electronic data transfer, recognizing that most local government employees face a huge complex of technology with limited knowledge of computers and communications tools. The system was designed to be as simple as possible, and to require minimal equipment and software cost to the users. The original system was an Apex 386/25 computer with MS-DOS 5.0 software and the final configuration was an HP Vectra XM Pentium 90 with MS-NT 3.51 and Mustang - Wildcat 5.0 software. The users of the BBS were county engineers and their staff, offices in the central office of the Iowa Department of Transportation (DOT) and Resident Construction Engineers at the Iowa DOT. Much of the activity was between the county engineers, and their staffs, and the Iowa DOT offices with which they have ongoing business activities. The BBS contained files for mapping, Internet e-mail service, Accident Location Analysis System (ALAS) data, Iowa DOT bid lettings, and Autocad and Intergraph maps and standards. The 800 line calls were recorded and gave the best indication of the usage and the trends that were being followed. The usage tended to be higher in the winter months when design activities are occurring and lower in the summer months when the construction is in progress. The project was judged a success. The BBS did provide a "stepping stone" to the world of electronic data transfer.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A research project involving 2, 3, 4, and 5 in. (5.1, 7.6, 10.2, and 12.7 cm) of bonded portland cement concrete (PCC) overlay on a 1.3 mile (2.1 km) PCC pavement was conducted in Clayton County, Iowa, during September 1977, centering on the following objectives: (1) Determine the mixing and proportioning procedures required in using a conventional, central mix proportioning plant to produce a dense PCC mixture using standard mixes with super water reducing admixtures; (2) Determine the economics, longevity and maintenance performance of a bonded, thin-lift, non-reinforced PCC resurfacing course using conventional procedures, equipment and concrete paving mixtures both with and without super water reducing admixtures; and (3) Determine if an adequate bond between the existing pavement and an overlay of thin-lift, dense, non-reinforced PCC can be obtained with only special surface cleaning and no surface removal or grinding. The conclusions are as follows: (1) Normal mixing equipment and proportioning procedures could be used using a conventional central-mix proportioning plant. This was successful when used with super water reducing admixtures. Only minor changes need be made in procedures and timing. (2) The time has been too short since the completion of the project to determine how the new pavement will perform, however, initially it appears that the method is economical and no reason is seen at this time why the life of the pavement should not be comparable to an all new pavement. (3) The initial test results show that bond strength, regardless of which method of cleaning is used, scarifying, sand blasting or water blasting, far exceed what is considered the minimum bond strength of 200 psi (1379 kPa) except where the paint stripes were intentionally left, thus showing that the paint must be removed. (4) It appears that either cement and water grout or sand, cement and water grout may be used and still obtain the required bond.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Iowa Department of Transportation Materials Laboratory personnel developed a process to produce a road deicer consisting of sand grains coated with calcium magnesium acetate (CMA). Research project HR-253 was established to explore commercial production of the CMA/sand deicer by an independent contractor. About 60 tons of the deicer was produced at a ready-mix concrete facility and evaluated in the field during the 1983-1984 winter season. The initial contracted production of CMA/sand deicer under research project HR-253 identified two major problems: (1) excessive unreacted lime in the final product, and (2) formation of spherical lumps within the product requiring subsequent size reduction. It was recommended in the HR-253 report that additional deicer be produced as a continuation of the project in order to address these problems and further develop the production process. A contract was negotiated with W. G. Block Co. to produce and deliver 50 tons of additional deicer. This addendum report covers this production effort including descriptions and results of all modifications of equipment and process procedures used.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Approximately 40,000 tons of slightly damaged asphalt concrete has been removed from Interstate 80 in Cass and stockpiled. Laboratory tests had indicated that this material had considerable value when upgraded with new aggregate and asphalt cement. This report documents the procedures used and results obtained on an experimental recycling project. It was demonstrated that present drum mixing-recycling equipment and procedures can be used to utilize this material with satisfactory results. Laboratory analyses of material components and mixtures were performed; these analyses indicate mixture can be produced that is uniform, stable, and very closely resembles mixture produced with all new material. Follow~up evaluations will be made to determine the effects of traffic and environment. Preliminary data indicate that plans should be made to incorporate the stockpiled material in projects near the stockpile site.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Research Project involving two, three, four and five inches of bonded Portland Cement Concrete Overlay on a 1.3 mile Portland Cement Concrete pavement was conducted in Clayton County, Iowa, during September, 1977, centering on the following objectives: 1. Determine the mixing and proportioning procedures required in using a conventional, central mix proportioning plant to produce a dense Portland Cement Concrete mixture using standard mixes with super-water reducing admixtures; 2. Determine the economics, longevity and maintenance performance of a bonded, thin-lift, non-reinforced Portland Cement Concrete resurfacing course using conventional procedures, equipment and concrete paving mixtures both with and without super-water reducing admixtures; 3. Determine if an adequate bond between the existing pavement and an overlay of thin-lift, dense, non-reinforced Portland Cement Concrete can be obtained with only special surface cleaning and no surface removal or grinding.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report is divided into two volumes. This volume (Volume I) summarizes a structural health monitoring (SHM) system that was developed for the Iowa DOT to remotely and continuously monitor fatigue critical bridges (FCB) to aid in the detection of crack formation. The developed FCB SHM system enables bridge owners to remotely monitor FCB for gradual or sudden damage formation. The SHM system utilizes fiber bragg grating (FBG) fiber optic sensors (FOSs) to measure strains at critical locations. The strain-based SHM system is trained with measured performance data to identify typical bridge response when subjected to ambient traffic loads, and that knowledge is used to evaluate newly collected data. At specified intervals, the SHM system autonomously generates evaluation reports that summarize the current behavior of the bridge. The evaluation reports are collected and distributed to the bridge owner for interpretation and decision making. Volume II summarizes the development and demonstration of an autonomous, continuous SHM system that can be used to monitor typical girder bridges. The developed SHM system can be grouped into two main categories: an office component and a field component. The office component is a structural analysis software program that can be used to generate thresholds which are used for identifying isolated events. The field component includes hardware and field monitoring software which performs data processing and evaluation. The hardware system consists of sensors, data acquisition equipment, and a communication system backbone. The field monitoring software has been developed such that, once started, it will operate autonomously with minimal user interaction. In general, the SHM system features two key uses. First, the system can be integrated into an active bridge management system that tracks usage and structural changes. Second, the system helps owners to identify damage and deterioration.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The purpose of this report is to describe the major research activities during the period of February 1, 1985 - October 30, 1986 for the Iowa Highway Research Board under the research contract entitled "Development of a Conductometric Test for Frost Resistance of Concrete." The objective of this research, as stated in the project proposal, is to develop a test method which can be reasonably rapidly performed in the laboratory and in the field to predict the behavior of concrete subjected to the action of alternate freezing and thawing with a high degree of certainty. In the work plan of the proposal it was stated that the early part of the first year would be devoted to construction of testing equipment and preparation of specimens and the remainder of the year would be devoted to the testing of specimens. It was also stated that the second and third years would be devoted to performance and refinements of tests, data analysis, preparation of suggested specifications, and performance of tests covering variables which need to be studied such as types of aggregates, fly ash replacements and other admixtures. The objective of this report is to describe the progress made during the first 20 months of this project and assess the significance of the results obtained thus far and the expected significance of the results obtainable during the third year of the project.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Approximately 40,000 tons of deteriorated asphalt concrete has been removed from Interstate 80 in Cass County and stockpiled. Laboratory tests indicate that this material has considerable value when upgraded with new aggregate and asphalt cement. This report documents the procedures used and results obtained on an experimental recycling project. It was demonstrated that present drum mixing-recycling equipment and procedures can be used to utilize this material with satisfactory results. Laboratory analyses of material components and mixtures were performed; these analyses indicate mixture can be produced that is uniform, stable, and very closely resembles mixture produced with all virgin material. A 1700 foot long test section was constructed on US 169 in Kossuth County wherein salvaged asphalt concrete from I-80 in Cass County was utilized. The salvaged mix was blended with virgin aggregate and recycled through a modified drum mixing plant, the reprocessed mixture was satisfactorily placed 1 1/2 inches thick as a resurfacing course on an old PCC pavement. An inspection of the test section was made in December of 1978 to evaluate the performance after one full year of service. There was no evidence of rutting or shoving from traffic. The surface does, however, have a very dry and somewhat ravelled appearance. This can be related to a low asphalt content in the mix and some temperature control problems which were difficult to get fully corrected on such a short project and with a short supply of readily available materials.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The routine maintenance along Iowa's highways and roadways during the summer growing season is a time consuming and costly endeavor. Trimming around guardrail posts and delineator posts is especially costly due to the handwork required. Trimming costs account for approximately 50% of the shoulder mowing costs according to expense figures obtained from the Iowa Department of Transportation (DOT), Office of Maintenance. The FY 2001 statewide trimming costs for the Iowa DOT was approximately $430,000 ($305,000 labor, $125,000 equipment and materials). This product would be required to perform well for 9-21 years, on average, in order to recoup the cost of installation. This includes the durability of the product, but not the cost of repair due to traffic damage, snowplow and wing damage, or damage caused by mowing operations. Maintenance costs associated with vegetation creep over the mats and repair costs would extend the required service life. As a result of resource realignment, the Iowa DOT roadside maintenance policy, for FY 2003 and the future, will be to eliminate trimming around delineator posts unless the reflector is obstructed. This policy change will effectively eliminate the need for weed control mats due to the significant reduction in trimming. The use of the weed control mats could be justified in areas that are dangerous to maintenance workers such as guardrail installations in high traffic areas. Because the delineator posts are further from the edge of the traveled roadway, there is a reduced risk to the maintenance workforce while hand trimming. Because the DuroTrim Vegetation Control Mats appear to have performed adequately in the field trial, they could be considered for use, where safety conditions warrant. That use should be limited, however, due to the considerable initial cost and changes in Iowa DOT roadside maintenance policy. Application should be limited to instances where the use of the DuroTrim Vegetation Control Mats would have a significant impact on the safety of the roadside maintenance workers. The cost savings, due to the elimination of the trimming and mowing alone, is not enough to justify their use in most situations at their current cost. The test sections will continue to be monitored periodically so that approximate service life can be determined.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The paper reviews methods, materials, equipment and results to date of sprinkle treatment within the state. The Iowa Department of Transportation formerly the Iowa State Highway Commission, made its first attempts at sprinkle treatment of fresh asphalt concrete in 1974. Increased emphasis in mix design of asphalt mixes and aggregate selection of durable non-polishing materials has generated costly restrictions on the use of local materials. During the summer of 1975, a dual spinner, tail-gate spreader was mounted on a standard departmental dump truck to attempt additional sprinkle treatment on a section of Iowa 7 west of Ft. Dodge. The dump truck equipment was marginally satisfactory, but results of increased surface skid texture and durability were well demonstrated. On 1976 a new, current order dump truck was modified with an auxiliary transmission and a set of slick surfaced tires, and dual spinner spreader was mounted to again attempt surface sprinkle treatment, which was conducted in 1977.