53 resultados para Final year project


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for a full deployment of a field data collection.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Lake Icaria is a 660 acre man-made lake in rural Adams County. Lake Icaria is a popular recreational attraction providing ample fishing, boating, and swimming opportunities. Constructed in 1977 for water supply, Lake lcaria continues to provide reliable drinking water to 1,900 households in Adams and Montgomery counties. No stranger to the water quality world, Lake Icaria was the primary lake in the 3Lakes Water Quality Project(1996-2004), an eight year water quality effort which came to be known as one oflowa's first great water quality successes. At time of construction the Lake Icaria watershed was primarily grass. A shift towards maximizing crop production in the 1980's brought about the end of dairy farms and a concern for sediment loss and how that would affect water quality. This change in land use set the stage for the first water quality project at Lake Icaria. Since the conclusion of the 3Lakes Water Quality Project in 2004land use in the watershed has made yet another monumental shift towards crop production. Nearly 2,000 acres ofland that was once in the conservation reserve program is now being planted to a crop. This change in land use has once again brought about serious concerns for the quality of water being provided by Lake Icaria.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In 2004, Walnut Creek was placed on the 303d list of Impaired Waters due to a low biotic index (lack of aquatic life) during IDNR stream sampling events. Sediment originating from agriculture, streambank erosion, and channelization were listed as the most likely sources impacting aquatic life. In an effort to address these concerns, a preliminary study was completed of the multi-county watershed to identify priority areas. A Watershed Development & Planning Assistance Grant was then funded by the IDALS-DSC to conduct a detailed assessment of these prioritized sub-watersheds. The impending assessment of the watershed and the stream corridor revealed ample opportunities to address gully, sheet and rill erosion while addressing in-stream water velocity issues that plagued the riparian corridor. A comprehensive plan was developed comprised of a variety of best management practices to address the identified concerns. In 2009, this plan was submitted to the WIRB Board by the East Pottawattamie and Montgomery SWCDs and $489,455 was awarded to address concerns identified during watershed assessment inquiries. Despite adverse weather conditions, which has hampered conservation construction recently, this project has held fast to pre-project goals due to the fortitude of the project sponsors and the overwhelming participation by the watershed landowners. Unfortunately, state budget shortfalls are bringing project progress to a halt. As specified in the original WIRB funding request, practice funding for Year 3 was to come from the Division of Soil Conservation’s Watershed Protection Fund (WSPF). Due to Iowa’s budgetary restraints, the Walnut Creek WSPF application, which was submitted this spring, was not funded since no new applications in the state were funded. If funded again, this grant will serve as the critical step in continuing what is destined to be a true watershed success story.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Central Park Lake Watershed Assessment and Management Plan identified four categories where improvements are needed to remove the 23 acre lake from the impaired waters list. These include the wastewater system, runoff from surrounding lands, in-lake nutrient re-suspension and runoff from hard surfaces within the park. The lake is currently impaired for bacteria, algae and pH. Through outcomes of the Watershed Assessment and Management Plan, this proposal includes for abandonment and reclamation of the single cell wastewater lagoon site, replacement with three conventional septic systems and construction of two wetlands. One of the wetlands is located on the same site as the reclaimed lagoon and the other is located to intercept sediment and trap nutrients transported by tile lines. The prescribed wastewater system improvements are based on assessment by grab samples test by the State Hygienic Lab, development of a Preliminary Engineering Report, soil analysis and communication with IDNR wastewater officials. The two wetland sites were assessed by officials from IDALS and the Jones County SWCD. This project is part of $1.7 million lake restoration effort to reclaim the 47 year old lake. The lake has a positive economic impact of more than $7.6 million annually and supports an average annual visitation of 58,145, according to the Iowa Lakes Valuation Project, conducted by Iowa State University.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Little Clear Lake is a 162 acre natural lake located in the western part of Pocahontas County. The lake has a 375 acre watershed that is gently rolling with nearly 84% of the watershed in row crop production. The lake is listed on the Iowa DNR’s impaired waters list due to nutrients, siltation and exotic species (purple loosestrife). These impairments have been verified with in-lake monitoring and landowner conversations as well as watershed modeling. The watershed models estimates that the average sheet and rill erosion is 1.74 tons/acre/year and sediment delivery is .12 tons/acre/year with a total of 44 tons/year being delivered to Little Clear Lake. The goal of the Little Clear Lake Watershed Protection Plan is to (1) reduce sediment delivery to Little Clear Lake by 60%, or 26.5 tons annually, by installing best management practices within the watershed. Doing this will control nearly 100% of the of the lake’s drainage area; and (2) initiate an information and education campaign for residents within the Little Clear Lake watershed which will ultimately prepare the residents and landowners for future project implementation. In an effort to control sediment and nutrient loading the Little Clear Lake Watershed Protection Plan has included 3 sediment catch basin sites and 5 grade stabilization structures, which function to stabilize concentrated flow areas.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Hurley Creek Watershed is a micro-watershed of approximately 2,211 acres (3.5 square miles), which drains into the Platte River southwest of Creston. The watershed is 64% urban and 36% rural. The urban area includes the bulk of the town of Creston (population 7,597) and the rural area is just north of Creston, which includes the origin of Hurley Creek. Hurley Creek Watershed was examined for improvements following a citizens group in 2004 determined a need and desire to make McKinley Lake, a 65-acre city-owned lake, a quality fishery and viable swimming lake, as it once was. As part of a major park improvement project over ten-plus years, the watershed improvement project is undertaken to reduce pollution entering the lake. In 2006, IOWATER volunteers, under guidance of the town’s consultants, sampled the stream in 8 locations throughout the year, a total of 92 samples. The samples, along with visual inspections of the creek, found three major impairments: 1) high E. Coli levels, 2) severe erosion, and 3) storm water management. Using the Watershed Project Planning Protocol, the consultant and a volunteer committee of interested citizens determined that five physical and three administrative actions should be undertaken. The request will help: identify sources of E. Coli and reduce its delivery into the watershed, control animal access, manage storm water, implement stream-bank stabilization, educate the public, and develop miscellaneous small projects on specific properties.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Big Bear Creek is the upper portion of Bear Creek which drains 26,734 acres and ends at the Highway 136 crossing of Bear Creek. Bear Creek flows into the section of the Maquoketa River, which is on the EPA’s 303(d) List of Impaired Waters. Monitoring by the Iowa DNR indicates that Bear Creek is contributing significant amounts of sediment and nutrients to the Maquoketa River. The primary use of land in the Big Bear Creek Watershed is row crop production. A roadside survey completed by Anamosa Field Office Staff indicated that 123,747 tons/yr. of sediment was being lost due to sheet and rill erosion only. The sediment delivered to Big Bear Creek is 24,447 tons/yr. Based on this data, 34,226 lbs. of Phosphorus is reaching the stream per year. With the added amount of sediment and phosphorus delivery through gully and streambank erosion, one can clearly see that the water quality in Bear Creek is severely impaired. The Big Bear Watershed Project will work to reduce the sediment and phosphorus delivered to the stream by 30% through the installation of practices that trap sediment and reduce erosion.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Bear Creek is an impaired warm water fishery designated as class B(LR) by the Iowa DNR and is on 303 impaired waters list for fish kills and ammonia. Bear Creek is located in eastern Delaware County. This project is designed to improve the water quality of Bear Creek by educating the landowners, operators and watershed community about the importance of this water resource. The goal of the Bear Creek Watershed Project is to improve the water quality of Bear Creek by reducing the amounts of ammoniated manure discharge, fecal coliform bacteria, sediment, nitrogen, and phosphorous. The Bear Creek Watershed Project has been a watershed project since July 2004, first as a Demo project FY 2004-2005 and then full time WSPF/319 project FY06-09. Fish kills have not occurred in 2008-2009. Sediment delivery has decreased in the Bear Creek Watershed by 5,328 tons per year. The objectives of this watershed project will be to improve Livestock Waste Storage, to improve Livestock Waste Usage, to decrease Sediment Losses, and to improve Education & Area Outreach. This project will install 2 manure storage structures (EQIP/project funded), 19 ac of CRP waterways, 12 ac of project waterways, 17 ac of CRP filter strips along stream, 12 water and sediment control basins, 18,000 ft of terraces, 350 ac of new notill planting, and 3,700 ft of streambank protection.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The City of West Union has been selected by Iowa Department of Economic Development as a Green Pilot Community. A major project within this designation is the reconstruction of the downtown business district public infrastructure in a sustainable, innovative, and replicable way. A key component of this project is replacement of the impermeable street and sidewalk surfacing with a porous paver system. This system, along with bio-retention cells in intersection bumpouts and sidewalk planters, will infiltrate, then cleanse and cool the storm water prior to a very slow discharge rate to Otter Creek. The project area will see a 95% reduction in peak discharge rate for a 100 year storm and a 20% reduction in runoff volume. West Union is located within the Otter Creek watershed, a designated cold water trout stream just below the city. Fayette County Soil and Water Conservation District and IDNR consider improvement of the water quality of Otter Creek to be very important. This reconstruction of downtown West Union in a sustainable manner will be the start of an overall Otter Creek watershed improvement project.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Competine Creek watershed is a 24,956 acre sub-watershed of Cedar Creek. The creek traverses portions of three counties, slicing through rich and highly productive Southern lowa Drift Plain soils. The watershed is suffering from excessive sediment delivery and frequent flash floods that have been exacerbated by recent high rainfall events. Assessment data reveals soil erosion estimated to be 38,435 tons/year and sediment delivery to the creek at 15,847 tons/year. The Competine Creek Partnership Project is seeking WIRB funds to merge with IDALS-DSC funds and local funds, all targeted for structural Best Management Practices (BMPs) within the 2,760 acres of High Priority Areas (HPAs) identified by the assessment process. The BMPs will include grade stabilization structures, water and sediment basins, tile-outlet terraces, CRP, and urban storm water conservation practices. In addition, Iowa State University Extension-Iowa Learning Farm is investing in the project by facilitating a crop sampling program utilizing fall stalk nitrate, phosphorous index, and soil conditioning index testing. These tests will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce sediment and nutrient delivery to Competine Creek.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Whit Oak Lake was listed on the 2008 Section 303(d) List if impaired waters in four categories. The first phase of the project has already helped to affect approximately 60% of the watershed. There has been an estimated sediment reduction of 609 tons per year with phase one. The structure being planned for the South end of the lake, (phase two) will affect nearly all of the remaining 40%. If we can accomplish similar results, we can expect a sediment reduction of approximately 273 tons additional per year. We have been working with the Mahaska County NRCS office, Snyder & Associates (engineers) and private landowners in the watershed to make this project a reality.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The Mitchell County Soil and Water Conservation District is applying on behalf of the incorporated community of Carpenter to construct a wastewater collection and treatment system to assist in the environmental cleanup and protection of Deer Creek. IDNR water monitoring of the community tile line has shown consistently elevated levels of fecal coliform bacteria indicating the presence of untreated sewage water. These are obvious health threats to the downstream users and wildlife in Deer Creek and the Cedar River. A new sewer system for the community of Carpenter will eliminate illegal discharges into the creed and be the first step in the overall protection of the stream.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Lime Creek is a sub-watershed of the Cedar River above; approximately 25 miles from Cedar Rapids. The lower half of the stream is on the Iowa 2004 Section 303(d) impaired waters list. Monitoring by the Cedar River Watershed Monitoring Coalition documents that Lime Creek delivers above average amounts of nitrate+ nitrite-N, ammonia-Nand total phosphorus (above the 901 percentile) compared to other Cedar River sub-watersheds. The Cedar Rapids water utility is concerned about increasing delivery of nitrate+nitrate to the Cedar River, which provides drinking water for about 125,000 people in the area. A group of local citizens has formed the Lime Creek watershed council with the goal of reducing pollutant delivery to the creek and promoting sustainable, watershed-wide action by producers, urban and rural residents for improved environmental management. The council has established a performance-based program that rewards cooperators for improvement in research-based test and index scores which directly measure environmental impact of BMPs. The Iowa Com Growers Association is funding the performance rewards. The Watershed Coalition is contributing in-kind monitoring. Council and performance cooperators participate primarily with commitment of their own resources. WIRB funds will be used to increase program cooperators and for staff support. In addition to improvement of water quality in Lime Creek, the project will establish baseline values for arket-based a pro ch to valuing pollutant reduction by intensive livestock operations in eastern Iowa.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Clear Lake, Iowa's third largest natural lake, is a premier natural resource and popular recreational destination in north central Iowa. Despite the lake's already strong recreational use, water quality concerns have not allowed the lake to reach its full potential. Clear Lake is listed on Iowa's 2004 303(d) Impaired Waters List due to excessive levels of phosphorus, bacteria, and turbidity. Urban storm water runoff from the 8,600 acre watershed is a significant contributor to Clear Lake's impairment. Local communities have been working towards the goal of making improvements at all 30 storm water outlets that have a drainage area of five acres or more and have a cost effective solution. Many improvements have already been made, and now there are only seven storm water outlet sites remaining that still need protection in order to meet the goal. The storm water improvements have been very effective in reducing contaminants in urban runoff, achieving reduction levels in the 50-80% range. The proposed Clear Lake Storm Water Improvement Project will address the remaining seven outlet sites and take place over three years. The first year will consist of performing engineering and design of storm water best management practices (BMPs) at the seven outlet sites to determine if a cost effective solution exists for each. Years two and three will consist of installing two storm water improvements each year to implement the most cost effective BMPs at a minimum of four of the seven sites. The grant request addresses one of the main priorities of the Iowa Watershed Improvement Grant: storm water runoff.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Two sections of the Yellow River have been named to the State of Iowa’s 303d list of impaired waters. The listing reflects streams with pollution problems linked to habitat alterations, in addition to those with potential disease causing bacteria, viruses and parasites. This fact, combined with local knowledge of water quality problems, shows the need for land treatment practices and habitat improvement measures. This project would target the Yellow River watershed, which totals approximately 49,800 acres. Areas that drain directly into the Yellow River mainstream will be targeted. Individually, these areas are too small to be considered sub-watersheds. This project will assess the drainage areas for active gullies and prioritize grade stabilization structures based upon severity and impact on the fishery. Funding would be utilized to target high priority grade stabilization structure sites and provide cost-share for those projects. A prerequisite for cost-share allocation is 75% of the land contributing to the drainage area must have some form of treatment in place. The Allamakee SWCD has received an EPA Region 7 Grant toward grade stabilization structures in the same area. Landowners have indicated that 75% cost-share is necessary to implement practices. To meet this request, the EPA funding would be used at a 15% cost-share rate if matched with 60% cost-share from WIRB funding. If matched with Federal EQIP funds, 25% of funds obtained from WIRB would be used. If other funds were depleted, WIRB funds would be utilized for the entire 75% cost-share.