55 resultados para Failure of management oversight


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agency Performance Report

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agency Performance Report

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agency Performance Report

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agency Performance Report

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agency Performance Report

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report outlines the strategic plan for Department of Management, goals and mission.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agency Performance Report

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Audit report on the Department of Management for the year ended June 30, 2013

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This report outlines the strategic plan for Department of Management, goals and mission.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agency Performance Report

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Agency Performance Plan

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Moisture sensitivity of Hot Mix Asphalt (HMA) mixtures, generally called stripping, is a major form of distress in asphalt concrete pavement. It is characterized by the loss of adhesive bond between the asphalt binder and the aggregate (a failure of the bonding of the binder to the aggregate) or by a softening of the cohesive bonds within the asphalt binder (a failure within the binder itself), both of which are due to the action of loading under traffic in the presence of moisture. The evaluation of HMA moisture sensitivity has been divided into two categories: visual inspection test and mechanical test. However, most of them have been developed in pre-Superpave mix design. This research was undertaken to develop a protocol for evaluating the moisture sensitivity potential of HMA mixtures using the Nottingham Asphalt Tester (NAT). The mechanisms of HMA moisture sensitivity were reviewed and the test protocols using the NAT were developed. Different types of blends as moisture-sensitive groups and non-moisture-sensitive groups were used to evaluate the potential of the proposed test. The test results were analyzed with three parameters based on performance character: the retained flow number depending on critical permanent deformation failure (RFNP), the retained flow number depending on cohesion failure (RFNC), and energy ratio (ER). Analysis based on energy ratio of elastic strain (EREE ) at flow number of cohesion failure (FNC) has higher potential to evaluate the HMA moisture sensitivity than other parameters. If the measurement error in data-acquisition process is removed, analyses based on RFNP and RFNC would also have high potential to evaluate the HMA moisture sensitivity. The vacuum pressure saturation used in AASHTO T 283 and proposed test has a risk to damage specimen before the load applying.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purposes of this Report: • Recommend the most logical and economical options to address state governmental space needs in the Polk County metropolitan area to the year 2010. • Include building size, location, phasing, financing, method of project delivery and estimated cost. • Develop a software tool to compare costs of leasing vs. ownership of space. Methodology: Identify: 1. Current amount and location of owned and leased space, by agency; 2. Types of space and whether best located on or off of the Capitol Complex; 3. Utilization of space, noting over-crowding and under-utilization; 4. Current number of workstations for full and part time employees, Personnel Employment Organization (PEO) workers, contractors, interns, etc.; and, 5. History of staff levels to assist in the prediction of staff growth. Scope: This report focuses on 10 state-owned buildings located on the Capitol Complex and 48 leased spaces in the Polk County metropolitan area. (See Figures 1 and 2.) • Due to a separate space study under way by the Legislature, implications of area and staff for the State Capitol building are included only for the Governor, Lieutenant Governor, Treasurer, Secretary of State, Auditor and the Department of Management. • Because it is largely a museum building that does not have office space available for other agencies, the area and staff of the Historical Building are not fully addressed. • Only the parking implications of the new Judicial Building are included in this study because the building space is under the jurisdiction of the Judicial Branch and not available for other agencies. Several state-owned buildings are not included in the scope of this report, generally because they have highly focused purposes, and their space is not available for assignment to other agencies. Several leased locations are not included for similar reasons, including leases that do not fall within the authority of the Department of General Services.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

A Public Intellectual recently suggested that I read the book Life Out Of Context by the very productive writer Walter Mosley. In this book, Mosley began to summarize a speech that was given by Harry Belafonte. Belafonte made a comparison between a particular Olympic relay race and the Civil Rights Movement. In the race, an experienced runner stumbled a little while passing the baton, and the race was lost. For Belafonte, this momentary slip was a metaphor for the failure of the Civil Rights Movement to “pass the baton” to the younger generation as “it moved past its original phase and into the latter part of the century.” Regardless of your views of the strengths and weaknesses of the Civil Rights Movement, I think all of us would agree that the current issues facing Black Iowa today--e.g., the need for economic development, increased educational achievement and more political involvement in our communities--demand our immediate attention and action. This urgency requires that we cross generational, class, and territorial boundaries within the state to collaborate among ourselves and with others to deal constructively with these issues. We cannot afford to have another “momentary slip.” Serving as the Administrator for ICSAA allows me to serve Black Iowa in a significant way, and Kimberly Cheeks and I in this Division look forward to the work ahead over the next several months and years. Working closely with Walter Reed, Director of the Department of Human Rights, along with so many others across this state, we are keenly aware that we are provided with a great opportunity to positively impact the quality of life for African-Americans in Iowa.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Executive Summary Purposes of this Report: • Recommend the most logical and economical options to address state governmental space needs in the Polk County metropolitan area to the year 2010. • Include building size, location, phasing, financing, method of project delivery and estimated cost. • Develop a software tool to compare costs of leasing vs. ownership of space. Methodology: Identify: 1. Current amount and location of owned and leased space, by agency; 2. Types of space and whether best located on or off of the Capitol Complex; 3. Utilization of space, noting over-crowding and under-utilization; 4. Current number of workstations for full and part time employees, Personnel Employment Organization (PEO) workers, contractors, interns, etc.; and, 5. History of staff levels to assist in the prediction of staff growth. Scope: This report focuses on 10 state-owned buildings located on the Capitol Complex and 48 leased spaces in the Polk County metropolitan area. (See Figures 1 and 2.) • Due to a separate space study under way by the Legislature, implications of area and staff for the State Capitol building are included only for the Governor, Lieutenant Governor, Treasurer, Secretary of State, Auditor and the Department of Management. • Because it is largely a museum building that does not have office space available for other agencies, the area and staff of the Historical Building are not fully addressed. • Only the parking implications of the new Judicial Building are included in this study because the building space is under the jurisdiction of the Judicial Branch and not available for other agencies. Several state-owned buildings are not included in the scope of this report, generally because they have highly focused purposes, and their space is not available for assignment to other agencies. Several leased locations are not included for similar reasons, including leases that do not fall within the authority of the Department of General Services.