65 resultados para Concession Contract
Resumo:
An expert system has been developed that provides 24 hour forecasts of roadway and bridge frost for locations in Iowa. The system is based on analysis of frost observations taken by highway maintenance personnel, analysis of conditions leading to frost as obtained from meteorologists with experience in forecasting bridge and roadway frost, and from fundamental physical principles of frost processes. The expert system requires the forecaster to enter information on recent maximum and minimum temperatures and forecasts of maximum and minimum air temperatures, dew point temperatures, precipitation, cloudiness, and wind speed. The system has been used operationally for the last two frost seasons by Freese-Notis Associates, who have been under contract with the Iowa DOT to supply frost forecasts. The operational meteorologists give the system their strong endorsement. They always consult the system before making a frost forecast unless conditions clearly indicate frost is not likely. In operational use, the system is run several times with different input values to test the sensitivity of frost formation on a particular day to various meteorological parameters. The users comment. that the system helps them to consider all the factors relevant to frost formation and is regarded as an office companion for making frost forecasts.
Resumo:
Expansion joints increase both the initial cost and the maintenance cost of bridges. Integral abutment bridges provide an attractive design alternative because expansion joints are eliminated from the bridge itself. However, the piles in these bridges are subjected to horizontal movement as the bridge expands and contracts during temperature changes. The objective of this research was to develop a method of designing piles for these conditions. Separate field tests simulating a pile and a bridge girder were conducted for three loading cases: (1) vertical load only, (2) horizontal displacement of pile head only, and (3) combined horizontal displacement of pile head with subsequent vertical load. Both tests (1) and (3) reached the same ultimate vertical load, that is, the horizontal displacement had no effect on the vertical load capacity. Several model tests were conducted in sand with a scale factor of about 1:10. Experimental results from both the field and model tests were used to develop the vertical and horizontal load-displacement properties of the soil. These properties were input into the finite element computer program Integral Abutment Bridge Two-Dimensional (IAB2D), which was developed under a previous research contract. Experimental and analytical results compared well for the test cases. Two alternative design methods, both based upon the American Association of State Highway and Transportation Officials (AASHTO) Specification, were developed. Alternative One is quite conservative relative to IAB2D results and does not permit plastic redistribution of forces. Alternative Two is also conservative when compared to IAB2D, but plastic redistribution is permitted. To use Alternative Two, the pile cross section must have sufficient inelastic rotation capacity before local buckling occurs. A design example for a friction pile and an end-bearing pile illustrates both alternatives.
Resumo:
This research evaluated the concrete strength of two mixes which were used in the Polk County project NHS-500-1(3)--10-77 and were developed to meet a contract requirement of 900 psi third-point 28-day flexural strength. Two concrete mixes, the Proposed Mix and the Enhanced Mix, were tested for strength. Based on the experimental results, it was found that the addition of 50 lb of cementitious materials did not significantly increase concrete strength. The requirement of 900 psi 28-day third-point flexural strength (MOR-TPL) was not achieved by this amount of addition of cementitious materials.
Resumo:
This contract extension was granted to analyze data obtained in the original contract period at a level of detail not called for in the original contract nor permitted by the time constraints of the original contract schedule. These further analyses focused on two primary questions: I. What sources of variation can be isolated within the overall pattern of driver recognition errors reported previously for the 16 signs tested in Project HR-256? 2. Were there systematic relations among data on the placement of signs in a simulated signing exercise and data on the respondents' ability to detect the presence of a sign in a visual field or their ability to recognize quickly and correctly a sign shown them or the speed with which these same persons can respond to a sign for a driver decision?
Resumo:
This report describes the continuation of the development of performance measures for the Iowa Department of Transportation (DOT) Offices of Construction. Those offices are responsible for administering transportation construction projects for the Iowa DOT. Researchers worked closely with the Benchmark Steering Team which was formed during Phase I of this project and is composed of representatives of the Offices of Construction. The research team conducted a second survey of Offices of Construction personnel, interviewed numerous members of the Offices and continued to work to improve the eight key processes identified during Phase I of this research. The eight key processes include Inspection of Work, Resolution of Technical Issues, Documentation of Work Progress and Pay Quantities, Employee Training and Development, Continuous Feedback for Improved Contract Documents, Provide Safe Traffic Control, External/Public Communication, and Providing Pre-Letting Information. Three to four measurements were specified for each key process. Many of these measurements required opinion surveys of employees, contractors, and others. During Phase II, researchers concentrated on conducting surveys, interviewing respondents to improve future surveys, and facilitating Benchmark Steering Team monthly meetings. Much effort was placed on using the information collected during the first year's research to improve the effectiveness and efficiency of the Offices of Construction. The results from Process Improvement Teams that studied Traffic Control and Resolution of Technical Issues were used to improve operations.
Resumo:
The Iowa Department of Transportation Materials Laboratory personnel developed a process to produce a road deicer consisting of sand grains coated with calcium magnesium acetate (CMA). Research project HR-253 was established to explore commercial production of the CMA/sand deicer by an independent contractor. About 60 tons of the deicer was produced at a ready-mix concrete facility and evaluated in the field during the 1983-1984 winter season. The initial contracted production of CMA/sand deicer under research project HR-253 identified two major problems: (1) excessive unreacted lime in the final product, and (2) formation of spherical lumps within the product requiring subsequent size reduction. It was recommended in the HR-253 report that additional deicer be produced as a continuation of the project in order to address these problems and further develop the production process. A contract was negotiated with W. G. Block Co. to produce and deliver 50 tons of additional deicer. This addendum report covers this production effort including descriptions and results of all modifications of equipment and process procedures used.
Resumo:
In the United States civil marriages are entered into either ceremonially, by means of compliance of the parties with state statutory requirements for marriage, or non-ceremonially by the parties satisfying the requirements of a common law marriage. A marriage contracted validly, whether by complying with statutory requirements or the requirements of a common law marriage, confers the identical rights, responsibilities, and privileges on the parties. The purpose of this Legislative Guide is to provide an overview of marriage as a civil contract imbued with a public interest, and of common law marriage and statutory marriage provisions. The Guide also provides a brief summary of recent developments in marriage law.
Resumo:
When referenced, the 2012 edition of the Iowa Department of Transportation’s (Iowa DOT) Standard Specifications for Highway and Bridge Construction shall be used for contract work awarded by the Iowa DOT. They may also be incorporated by reference in other contract work on secondary, urban, local systems, or other contract work in which the Iowa DOT has an interest. As modified by the General Supplemental Specifications, these Standard Specifications represent the minimum requirements and may be modified by Supplemental Specifications, Developmental Specifications, and Special Provisions on specific contracts. These Standard Specifications have been written so the Contractor’s responsibilities are indicated by plain language using the Imperative Mood and Active Voice form. Sentences are of the form: Construct isolation joints at all points where driveways meet other walks, curbs, or fixtures in the surface. Ensure finished members are true to detailed dimensions and free from twists, bends, open joints, or other defects resulting from faulty fabrication or defective work. Personnel preparing the JMF shall be Iowa DOT certified in bituminous mix design. The Contracting Authority’s responsibilities are (with some exceptions) indicated by the use of the modal verb “will”. Sentences are of the form: The Engineer will obtain and test density samples for each lot according to Materials I.M. 204. Payment will be the contract unit price for Fabric Reinforcement per square yard (square meter). These standard specifications contain dual units of measure: the United States Standard measure (English units) and the International System of Units (SI or “metric” units). The English units are expressed first then followed by the metric units in parentheses. The measurements expressed in the two systems are not necessarily equal. In some cases the measurements in metric units is a “hard” conversion of the English measurement; i.e. the metric unit has been approximated with a rounded, rationalized metric measurement that is easy to work with and remember. The proposal form will identify whether the work was designed and shall be constructed in English or metric units.
Resumo:
This information is based on Iowa Department of Administrative Services (DAS) rules and policies and does not create an employment contract. Much of the information in this handbook is also covered in the State’s collective bargaining agreements. Where there are differences between a collective bargaining agreement and this handbook, the collective bargaining agreement prevails for employees covered by the agreement. Where there are differences between this handbook and DAS rules and policies, DAS rules and policies prevail.
Resumo:
Granular shoulders need to be maintained on a regular basis because edge ruts and potholes develop, posing a safety hazard to motorists. The successful mitigation of edge-rut issues for granular shoulders would increase safety and reduce the number of procedures currently required to maintain granular shoulders in Iowa. In addition, better performance of granular shoulders reduces the urgency to pave granular shoulders. Delaying or permanently avoiding paving shoulders where possible allows more flexibility in making investments in the road network. To stabilize shoulders and reduce the number of maintenance cycles necessary per season, one possible stabilizing agent—acidulated soybean oil soapstock—was investigated in this research. A pilot testing project was conducted for selected problematic shoulders in northern and northeastern Iowa. Soapstock was applied on granular shoulders and monitored during application and pre- and post-application. Application techniques were documented and the percentage of application success was calculated for each treated shoulder section. As a result of this research, it was concluded that soybean oil soapstock can be an effective stabilizer for granular shoulders under certain conditions. The researchers also developed draft specifications that could possibly be used to engage a contractor to perform the work using a maintenance-type construction contract. The documented application techniques from this project could be used as guidance for those who want to apply soapstock for stabilizing granular shoulders but might not be familiar with this technique.
Resumo:
This issue review examines the change in the number of executive branch employees, supervisors and payroll between January 2011 and August 2012. In recent years, a variety of factors have encouraged a reduction in the number of state employees, salary adjustment that pays for contract-related salary and benefits increases has not been funded, limited departments' ability to pay increasing personnel costs. Early retirement packages have been offered, encouraging higher-paid employees to retire. Beginning in January 2011, the Governor set a goal of reducing the cost of state government by 15 percent, which could impact the number of employees.
Resumo:
Each year, IEDA’s contract compliance team compiles a report of the status of each business project awarded or under contract. The FY14 annual report measures status and progress of projects awarded since 2003 and tracked by the compliance team. Within this version of the report, the projects are grouped by status. Within this version of the report, the projects are first grouped by the county in which they were awarded and subcategorized according to their status. Below is an explanation for each status as well as an explanation on how they appear within the report.
Resumo:
Each year, IEDA’s contract compliance team compiles a report of the status of each business project awarded or under contract. The FY14 annual report measures status and progress of projects awarded since 2003 and tracked by the compliance team. Within this version of the report, the projects are grouped by status. Within this version of the report, the projects are first grouped by the status.
Resumo:
Iowa has approximately 1000 bridges that have been overlaid with a nominal 2" of portland cement concrete. A Delamtect survey of a sampling of the older overlaid bridges indicated delaminations in several of them. Eventually these bridges as well as those that have not received an overlay must be programmed for rehabilitation. Prior to rehabilitation the areas which are delaminated must be identified. There are currently two standard methods of determining delaminated areas in bridge decks; sounding with a metal object or a chain drag and sounding with an electro-mechanical sounding system (Delamtect). Sounding with a metal object or chain drag is time consuming and the accuracy is dependent on the ear of the operator and may be affected by traffic noise. The Delamtect requires less field time but the graphical traces require that data reduction be done in the office. A recently developed method of detecting delamination is infrared thermography. This method is based on the temperature difference between sound and delaminated concrete. A contract was negotiated with Donohue and Associates, Inc. of Sheboygan, Wisconsin, to survey 18 p.c. concrete overlaid bridge decks in Iowa using the infrared thermography method of detecting delaminations.
Resumo:
The purpose of this report is to describe the major research activities during the period of February 1, 1985 - October 30, 1986 for the Iowa Highway Research Board under the research contract entitled "Development of a Conductometric Test for Frost Resistance of Concrete." The objective of this research, as stated in the project proposal, is to develop a test method which can be reasonably rapidly performed in the laboratory and in the field to predict the behavior of concrete subjected to the action of alternate freezing and thawing with a high degree of certainty. In the work plan of the proposal it was stated that the early part of the first year would be devoted to construction of testing equipment and preparation of specimens and the remainder of the year would be devoted to the testing of specimens. It was also stated that the second and third years would be devoted to performance and refinements of tests, data analysis, preparation of suggested specifications, and performance of tests covering variables which need to be studied such as types of aggregates, fly ash replacements and other admixtures. The objective of this report is to describe the progress made during the first 20 months of this project and assess the significance of the results obtained thus far and the expected significance of the results obtainable during the third year of the project.