82 resultados para Alcohol Safety Action Program--Tampa, Fla.
Resumo:
This report summarizes state and utility low-income weatherization program activity for dwellings weatherized to completion during calendar year 2008. The report includes state, utility, and agency summaries of calendar year 2008 spending and impacts by measure, end-use, and fuel. The base data consisted of statewide program tracking databases of spending and measure installations maintained by the Iowa Department of Community Action Agencies.
Resumo:
These Facts sheets have been developed to provide a multitude of information about executive branch agencies/departments on a single sheet of paper. The Facts provides general information, contact information, workforce data, leave & benefits information, and affirmative action data. This is the most recent update of information for the fiscal year 2007.
Resumo:
These Facts sheets have been developed to provide a multitude of information about executive branch agencies/departments on a single sheet of paper. The Facts provides general information, contact information, workforce data, leave & benefits information, and affirmative action data. This is the most recent update of information for the fiscal year 2007.
Resumo:
Binge drinking by Iowans is a serious problem. Binge drinking is commonly defined as five or more drinks of alcohol on the same occasion for men and four or more for women. The 2006 National Survey on Drug Use and Health (NSDUH) estimated that 11% (approximately 28,000) of Iowans 12-17 years of age and 51% (approximately 177,000) of Iowans ages 18-25 had engaged in binge drinking during the past month. Favorable community and peer norms about alcohol use and easy access both contribute to this problem. Consequences of binge drinking can be immediate, like alcohol poisoning or injury, or much more delayed such as an increased risk for stroke or alcoholism. In either case the results can be severe.
Resumo:
IN BRIEF • More than one in three 11th graders drank alcohol in the past month. • For every four 11th graders in Iowa, one engaged in binge drinking in the past month. • Binge drinking is defined as four or more drinks for females and five or more for males on the same occasion (i.e., at the same time or within a couple of hours of each other) on at least one day in the past 30 days. • A drink refers to one half ounce of alcohol (one 12-oz beer, one 5-oz glass of wine, or one 1-oz shot of 100 proof distilled spirits).
Resumo:
This report includes violations of maximum contaminant levels, maximum residual disinfectant levels, treatment technique requirements, action level exceedances, major monitoring or reporting requirements, and operation certification requirements of public water supplies in the state of Iowa.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
In this report, changes to the overall diversity and progress we have made to balance our workforce in FY2010m and provide updates on our diversity-related plans, initiatives, and program changes for FY2011.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
The historically-reactive approach to identifying safety problems and mitigating them involves selecting black spots or hot spots by ranking locations based on crash frequency and severity. The approach focuses mainly on the corridor level without taking the exposure rate (vehicle miles traveled) and socio-demographics information of the study area, which are very important in the transportation planning process, into consideration. A larger study analysis unit at the Transportation Analysis Zone (TAZ) level or the network planning level should be used to address the needs of development of the community in the future and incorporate safety into the long-range transportation planning process. In this study, existing planning tools (such as the PLANSAFE models presented in NCHRP Report 546) were evaluated for forecasting safety in small and medium-sized communities, particularly as related to changes in socio-demographics characteristics, traffic demand, road network, and countermeasures. The research also evaluated the applicability of the Empirical Bayes (EB) method to network-level analysis. In addition, application of the United States Road Assessment Program (usRAP) protocols at the local urban road network level was investigated. This research evaluated the applicability of these three methods for the City of Ames, Iowa. The outcome of this research is a systematic process and framework for considering road safety issues explicitly in the small and medium-sized community transportation planning process and for quantifying the safety impacts of new developments and policy programs. More specifically, quantitative safety may be incorporated into the planning process, through effective visualization and increased awareness of safety issues (usRAP), the identification of high-risk locations with potential for improvement, (usRAP maps and EB), countermeasures for high-risk locations (EB before and after study and PLANSAFE), and socio-economic and demographic induced changes at the planning-level (PLANSAFE).
Resumo:
This document produced by the Iowa Department of Administrative Services has been developed to provide a multitude of information about executive branch agencies/department on a single sheet of paper. The facts provides general information, contact information, workforce data, leave and benefits information and affirmative action data.
Resumo:
This document produced by the Iowa Department of Administrative Services has been developed to provide a multitude of information about executive branch agencies/department on a single sheet of paper. The facts provides general information, contact information, workforce data, leave and benefits information and affirmative action data.
Resumo:
This document produced by the Iowa Department of Administrative Services has been developed to provide a multitude of information about executive branch agencies/department on a single sheet of paper. The facts provides general information, contact information, workforce data, leave and benefits information and affirmative action data.
Resumo:
This document produced by the Iowa Department of Administrative Services has been developed to provide a multitude of information about executive branch agencies/department on a single sheet of paper. The facts provides general information, contact information, workforce data, leave and benefits information and affirmative action data.
Resumo:
This document produced by the Iowa Department of Administrative Services has been developed to provide a multitude of information about executive branch agencies/department on a single sheet of paper. The facts provides general information, contact information, workforce data, leave and benefits information and affirmative action data.