38 resultados para Adaptable seat
Resumo:
Kansas State University, with funding from the Kansas Department of Transportation (KDOT), has developed a computerized reduction system for profilograms produced by mechanical profilographs. The commercial version of the system (ProScan (trademark)) is marketed by Devore Systems, Inc. The system consists of an IBM Compatible PC 486SX33 computer or better, Epson LQ-570 printer, a Logitech Scanman 32 hand scanner system, a paper transport unit, and the ProScan software. The Scanner is not adaptable to IBM computers with the micro channel architecture. The Iowa DOT Transportation Centers could realize the following advantages by using ProScan: (1) Save about 5 to 8 staff hours of reduction and reporting time per Transportation Center per week for a Materials Technician 3 or 4 (the time savings would come during the busiest part of the season); (2) Reduce errors in reduction, transfer, and typing of profile values; (3) Increase the accuracy of the monitor results; and (4) Allow rapid evaluation of contractor traces when tolerance limits between monitor and certified results are exceeded.
Resumo:
Kossuth County is located in North Central Iowa bordering on the State of Minnesota. It is the largest county in Iowa consisting of 28 congressional townships. The population of the county is 23,000 of which 11,000 people live in the rural area. There are 13 towns located in the county with the county seat, Algona, being the largest with a population of 6,100. Major industry of the area is grain farming with some beef and hog production. Naturally, where there is good grain farm land it follows that there is poor soil available for road construction and pavements. However, below the 3 to 4 feet of good farm land of Kossuth there is present a good grade of clay soil which does make an adequate base for surfacing when placed and compacted on top of the roadbed. As early as 1950, the then Kossuth County Engineer, H.M. Smith, embarked on a program of stage construction in building new grades and pavements. The goal of his program was primarily to conserve the county's rapidly dwindling supply of surfacing materials, and also, to realize the side effects of providing smooth and dustless roads for the public. Engineer Smith was fully aware of the poor soils that existed for road construction, but he also knew about the good clay that lay below the farm soil. Consequently, in his grading program he insisted that road ditches be dug deep enough to allow the good clay soil to be compacted on top of the roadbed. The presence of the compacted clay on top of the road resulted in a briding affect over the farm soil. The stage construction program satisfied the objectives of aggregate construction and dust control but did generate other problems which we are now trying to solve as economically as possible.
Resumo:
The crack and seat (C & S) method of rehabilitating concrete pavements has been proposed to reduce the incidence of reflective cracking in asphalt overlays. These cracked pieces help reduce the thermal effects on lateral joint movement while the seating of slab pieces reduces vertical movement. This 1986 project demonstrated that a 0.6 m x 0.9 m (2 ft x 3 ft) cracking pattern was optimal to retard reflective cracking in an asphalt overlay. The best performance among three C & S test sections was section 4 with a 0.6 m x 0.9 m (2 ft x 3 ft) cracking pattern and 7.6 cm (3 in) overlay. Structural ratings determined from the Road Rater™ indicated little difference between each C & S section with varying AC thicknesses and crack spacings. Although reflection cracking is reduced in the early years after construction, the effectiveness of the C & S method diminishes over time.
Resumo:
Bridge deck and substructure deterioration due to the corrosive effects of deicing chemicals on reinforcing steel is a problem facing many transportation agencies. The main concern is protection of older bridges with uncoated reinforcing steel. Many different methods have been tried over the past years to repair bridge decks. The Iowa system of bridge deck rehabilitation has proven to be very effective. It consists of scarifying the deck surface, removing any deteriorated concrete, and overlaying with low slump dense concrete. Another rehabilitation method that has emerged is cathodic protection. It has been used for many years in the protection of underground pipelines and in 1973 was first installed on a bridge deck. Cathodic protection works by applying an external source of direct current to the embedded reinforcing steel, thereby changing the electrochemical process of corrosion. The corroding steel, which is anodic, is protected by changing it to a cathodic state. The technology involved in cathodic protection as applied to bridge decks has improved over the last 12 years. One company marketing new technology in cathodic protection systems is Raychem Corporation of Menlo Park, California. Their system utilizes a Ferex anode mesh that distributes the impressed direct current over the deck surface. Ferex mesh was selected because it seemed readily adaptable to the Iowa system of bridge deck rehabilitation. The bridge deck would be scarified, deteriorated concrete removed, Ferex anode mesh installed, and overlaid with low slump dense concrete. The Federal Highway Administration (FHWA) promotes cathodic protection under Demonstration Project No. 34, "Cathodic Protection for Reinforced Concrete Bridge Decks."
Resumo:
Introduction: As part of the roadside development along the Interstate Highway System, the Iowa State Highway Commission has constructed eight pair of rest area facilities. Furthermore, two pair are presently under construction with an additional two pair proposed for letting in 1967. An additional nine and one-half pairs of rest areas are in the planning phase, a grand total of 45 rest Brea buildings. The facilities existing were planned and designed in a relatively short period of time. The rest area facilities are unusual in terms of water use, water demand rates, and the fact that there are no applicable guidelines from previous installations. Such facilities are a pioneering effort to furnish a service -which the travelling public desires and will use. The acceptance and current use of the existing facilities shows that the rest areas do provide a service the public will use and appreciate. The Iowa State Highway Commission is to be congratulated for this· pioneering effort. However there are problems, as should be expected when design of a new type of facility has no past operating experience to use as a guide. Another factor which enters is that a rest area facility is quite different and rather unrelated to engineering in the highway field of practice. Basically, the problems encountered can be resolved into several areas, namely 1) maintenance problems in equipment due to 2) insufficient capacity of several other elements of the water systems, and 3) no provisions for water quality control. This study and report is supposed to essentially cover the review of the rest areas, either existing and under construction or letting. However, the approach used has been somewhat different. Several basic economically feasible water system schemes have been developed which are· adaptable to the different well capacities and different water qualities encountered. These basic designs are used as a guide in recommending modifications to the existing rest area water systems, anticipating that the basic designs will be used for future facilities. The magnitude of the problems involved is shown by the fact that the projected water use and demand variations of each rest area building is equivalent to the water supply for a community of about 100 people. The problems of proper operation and maintenance of an eventual thirty to forty-five such facilities are gigantic. For successful operation the rest area water systems must have a high degree of standardization and interchangeability of all elements of the water systems, even if it means a limited degree of over-design in some rest area facilities.
Resumo:
Reflective cracks form in pavements when hot-mix asphalt (HMA) overlays are placed over jointed and/or severely cracked rigid and flexible pavements. In the first part of the research, survival analysis was conducted to identify the most appropriate rehabilitation method for composite pavements and to evaluate the influence of different factors on reflective crack development. Four rehabilitation methods, including mill and fill, overlay, heater scarification (SCR), and rubblization, were analyzed using three performance indicators: reflective cracking, international roughness index (IRI), and pavement condition index (PCI). It was found that rubblization can significantly retard reflective cracking development compared to the other three methods. No significant difference for PCI was seen among the four rehabilitation methods. Heater scarification showed the lowest survival probability for both reflective cracking and IRI, while an overlay resulted in the poorest overall pavement condition based on PCI. In addition, traffic level was found not to be a significant factor for reflective cracking development. An increase in overlay thickness can significantly delay the propagation of reflective cracking for all four treatments. Soil types in rubblization pavement sites were assessed, and no close relationship was found between rubblized pavement performance and subgrade soil condition. In the second part of the research, the study objective was to evaluate the modulus and performance of four reflective cracking treatments: full rubblization, modified rubblization, crack and seat, and rock interlayer. A total of 16 pavement sites were tested by the surface wave method (SWM), and in the first four sites both falling weight deflectometer (FWD) and SWM were conducted for a preliminary analysis. The SWM gave close concrete layer moduli compared to the FWD moduli on a conventional composite pavement. However, the SWM provided higher moduli for the rubblized concrete layer. After the preliminary analysis, another 12 pavement sites were tested by the SWM. The results showed that the crack and seat method provided the highest moduli, followed by the modified rubblization method. The full rubblization and the rock interlayer methods gave similar, but lower, moduli. Pavement performance surveys were also conducted during the field study. In general, none of the pavement sites had rutting problems. The conventional composite pavement site had the largest amount of reflective cracking. A moderate amount of reflective cracking was observed for the two pavement sites with full rubblization. Pavements with the rock interlayer and modified rubblization treatments had much less reflective cracking. It is recommended that use of the modified rubblization and rock interlayer treatments for reflective cracking mitigation are best.
Resumo:
This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for or against full deployment of the pilot solution.
Final Report (SPR Project 90-00-RB10-012) on the Maintenance Asset Management Project Phase II, 2013
Resumo:
This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT resources such as the videolog and LRS and our current technology platforms including Oracle and our GIS web infrastructure. The concept examined the feasibility of newly available technologies, such as mobile devices, while balancing ease of use in the field. Implementation and deployment costs were also important considerations in evaluating the success of the project. These project funds allowed the pilot to address the needs of two DOT districts. A report of findings was prepared, including recommendations for a full deployment of a field data collection.