35 resultados para Accelerating Seismic Energy


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Through the City Energy Management Program, energy managers will directly work with up to 20 municipalities in Iowa to help identify opportunities to reduce energy costs in city-owned buildings, exterior lighting, and water/wastewater facilities. This assistance will be provided to the selected municipalities who will provide an in-kind match to achieve energy efficiency within their community.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Through the City Energy Management Program, energy managers will directly work with up to 20 municipalities in Iowa to help identify opportunities to reduce energy costs in city-owned buildings, exterior lighting, and water/wastewater facilities. This assistance will be provided to the selected municipalities who will provide an in-kind match to achieve energy efficiency within their community. Power Point of theses resources.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Economic Development Authority (IEDA) Energy Office sets energy policy direction for Iowa and receives designated funding from the State Energy Program Formula from the Department of Energy to carry out designated energy activities. These activities include promoting energy efficiency, biofuels and renewable energy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Economic Development Authority (IEDA) Energy Office sets energy policy direction for Iowa and receives designated funding from the State Energy Program Formula from the Department of Energy to carry out designated energy activities. These activities include promoting energy efficiency, bio-fuels and renewable energy.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Use of bridge deck overlays is important in maximizing bridge service life. Overlays can replace the deteriorated part of the deck, thus extending the bridge life. Even though overlay construction avoids the construction of a whole new bridge deck, construction still takes significant time in re-opening the bridge to traffic. Current processes and practices are time-consuming and multiple opportunities may exist to reduce overall construction time by modifying construction requirements and/or materials utilized. Reducing the construction time could have an effect on reducing the socioeconomic costs associated with bridge deck rehabilitation and the inconvenience caused to travelers. This work included three major tasks with literature review, field investigation, and laboratory testing. Overlay concrete mix used for present construction takes long curing hours and therefore an investigation was carried out to find fast-curing concrete mixes that could reduce construction time. Several fast-cuing concrete mixes were found and suggested for further evaluation. An on-going overlay construction project was observed and documented. Through these observations, several opportunities were suggested where small modifications in the process could lead to significant time savings. With current standards of the removal depth of substrate concrete in Iowa, it takes long hours for the removal process. Four different laboratory tests were performed with different loading conditions to determine the necessary substrate concrete removal depth for a proper bond between the substrate concrete and the new overlay concrete. Several parameters, such as failure load, bond stress, and stiffness, were compared for four different concrete removal depths. Through the results and observations of this investigation several conclusions were made which could reduce bridge deck overlay construction time.