478 resultados para Granular Pavements
Resumo:
This is the second part of the final report submitted to the Iowa Department of Transportation. Part 1 contained a comparison of unaged fiber composite and steel dowels and derivation of the appropriate theoretical model for analyzing the results. Part 2 of this final report covers the theoretical and experimental models for accelerated aging of fiber composite reinforcing bars and dowels cast in a concrete environment. Part 2 contains results from testing of unaged and aged fiber composite dowels and steel dowels, in addition to unaged and aged fiber composite reinforcing bars. Additional tests have been performed on unaged dowels (both steel and fibercomposite) to verify results from Part 1 and to keep the testing program consistent. Slight modifications have been made to the dowel specimens presented in Part 1. These modifications are noted in the Section 3.4 of this report. The flexural modulus of elasticity for the FC dowel bar given in Part 1 of the final report (Table 3. 2) was for the incorrect structural shape (non-circular cross section). The value is corrected and given in Part 2 of the final report (Table 3.4 for the.modulus of elasticity supplied by the manufacturer, and Tables 3. 5 and 3. 6 for experimentally determined modulus of elasticities) • The value in Part 1 was not used for any analysis of the FC dowel bars.
Resumo:
Roughly 242 million used tires are generated annually in the United States. Many of these tires end up being landfilled or stockpiled. The stockpiles are unsightly, unsanitary, and also collect water which creates the perfect breeding ground for mosquitoes, some of which carry disease. In an effort to reduce the number of used tire stockpiles the federal government mandated the use of recycled rubber in federally funded, state implemented department of transportation (DOT) projects. This mandate required the use of recycled rubber in 5% of the asphalt cement concrete (ACC) tonnage used in federally funded projects in 1994, increasing that amount by 5% each year until 20% was reached, and remaining at 20% thereafter. The mandate was removed as part of the appropriations process in 1994, after the projects in this research had been completed. This report covers five separate projects that were constructed by the Iowa Department Of Transportation (DOT) in 1991 and 1992. These projects had all had some form of rubber incorporated into their construction and were evaluated for 5 years. The conclusion of the study is that the pavements with tire rubber added performed essentially the same as conventional ACC pavement. An exception was the use of rubber chips in a surface lift. This performed better at crack control and worse with friction values than conventional ACC. The cost of the pavement with rubber additive was significantly higher. As a result, the benefits do not outweigh the costs of using this recycled rubber process in pavements in Iowa.
Resumo:
Provides basic job-site Spanish and English terms for concrete paving workers.
Resumo:
The major objective of this research project was to use thermal analysis techniques in conjunction with x-ray analysis methods to identify and explain chemical reactions that promote aggregate related deterioration in portland cement concrete. Twenty-two different carbonate aggregate samples were subjected to a chemical testing scheme that included: • bulk chemistry (major, minor and selected trace elements) • bulk mineralogy (minor phases concentrated by acid extraction) • solid-solution in the major carbonate phases • crystallite size determinations for the major carbonate phases • a salt treatment study to evaluate the impact of deicer salts Test results from these different studies were then compared to information that had been obtained using thermogravimetric analysis techniques. Since many of the limestones and dolomites that were used in the study had extensive field service records it was possible to correlate many of the variables with service life. The results of this study have indicated that thermogravimetric analysis can play an important role in categorizing carbonate aggregates. In fact, with modern automated thermal analysis systems it should be possible to utilize such methods on a quality control basis. Strong correlations were found between several of the variables that were monitored in this study. In fact, several of the variables exhibited significant correlations to concrete service life. When the full data set was utilized (n = 18), the significant correlations to service life can be summarized as follows ( a = 5% level): • Correlation coefficient, r, = -0.73 for premature TG loss versus service life. • Correlation coefficient, r, = 0.74 for relative crystallite size versus service life. • Correlation coefficient, r, = 0.53 for ASTM C666 durability factor versus service life. • Correlation coefficient, r, = -0.52 for acid-insoluble residue versus service life. Separation of the carbonate aggregates into their mineralogical categories (i.e., calcites and dolomites) tended to increase the correlation coefficients for some specific variables (r sometimes approached 0.90); however, the reliability of such correlations was questionable because of the small number of samples that were present in this study.
Resumo:
An ACC overlay is most often the rehabilitative effort used to maintain the serviceability of either an ACC or PCC pavement. The major problem in durability of this ACC overlay comes from reflective cracking. These cracks usually open, allowing water to enter the unsealed crack and strip the ACC in the overlay. The stripping of the ACC allows accelerated deterioration at the crack. Two engineering fabrics were evaluated in this project in order to determine their effectiveness in reducing reflective cracking. These two materials are: • PavePrep, Contech Construction Products Inc. • ProGuard, Phillips Fiber Corporation The data indicated a statistically significant decrease in reflective crack formation in the ProGuard fabric sections compared to control. There was little evidence of a similar effect from the PavePrep fabric sections compared to control. However, the rate of cracking (the rate of formation of new cracks) for both fabrics and control tended to be similar after three years. The benefits of using these fabrics (possible delay of some crack formation by two years) on this project did not outweigh the costs of up to $4200.00 per mile.
Resumo:
Concrete paving is often at a disadvantage in terms of pavement type selection due to the time of curing required prior to opening the pavement to traffic. The State of Iowa has been able to reduce traffic delay constraints through material selection and construction methods to date. Methods for monitoring concrete strength gain and quality have not changed since the first concrete pavements were constructed in Iowa. In 1995, Lee County and the Iowa DOT cooperated in a research project, HR-380, to construct a 7.1 mile (11. 43 km) project to evaluate the use of maturity and pulse velocity nondestructive testing (NDT) methods in the estimation of concrete strength gain. The research identified the pros and cons of each method and suggested an instructional memorandum to utilize maturity measurements to meet traffic delay demands. Maturity was used to reduce the traffic delay opening time from 5-7 days to less than 2 days through the implementation of maturity measurements and special traffic control measures. Recommendations on the development of the maturity curve for each project and the location and monitoring of the maturity thermocouples are included. Examples of equipment that could easily be used by project personnel to estimate the concrete strength using the maturity methods is described.
Resumo:
In recent years, the Iowa Department of Transportation has put greater emphasis on improving highway safety. This effort has been relatively successful with a reduction in traffic-related fatalities to levels experienced prior to 1950. The nationwide speed limit of 55 mph was probably the greatest contributor to the decline in traffic fatalities, but there have been many other efforts that have also contributed to this decline. The Iowa DOT has been testing all paved roadways periodically for friction coefficient since 1969. New techniques have been used to obtain a greater depth of surface texture on paved roadways. Transverse tined grooving has been used on portland cement concrete to provide increased texture depth.
Resumo:
ASPHALT STABILIZATION (ASPHADUR): Asphadur (now called 3M Additive 5990) was incorporated into asphaltic concrete on a lane delineation, AC resurfacing, project in Council Bluffs. The experimental feature was included in the eastbound lanes of Interstate 480, beginning at the bridge over the Missouri River and ending at the bridge over North 41st Street. The project was constructed in October 1979. The objective of the project was to investigate the manufacturer's claims of improved strength, stability and durability of an asphalt mix. REDUCTION OF REFLECTION CRACKS (MONSANTO BIDIM SYNTHETIC FABRIC): A lane delineation project was constructed in the eastbound lanes of Interstate 480 in Council Bluffs. A synthetic fabric, Monsanto Bidim C-28, was placed between the portland cement concrete and two inches of Type A asphaltic concrete resurfacing containing Asphadur. The experimental feature began at the bridge over the Missouri River and ended at the bridge over North 41st Street. The project was constructed in October 1979. The objective of this experimental project was to determine the effectiveness of the fabric in reducing reflective cracking in an asphaltic concrete overlay.
Resumo:
Safety is an important aspect of highway design. Texture and frictional properties are important characteristics in providing safe roadways. Longevity of desirable frictional properties is highly dependent on the aggregate within asphalt pavement. Iowa unfortunately has areas of the State where the locally available aggregate will not give long lasting desirable frictional properties. Iowa has utilized sprinkle treatments to improve the safety of many new asphalt concrete pavements.
Resumo:
The Special Investigations Section recently completed the final evaluation of the I-80 eastbound bonded overlay placed in 1979 between the Shelby and Avoca interchanges in Pottawattamie County.
Resumo:
Iowa's first field application of synthetic engineering fabrics was on research project HR-158, "Prevention of Reflective Cracking in Asphalt Overlays". This research placed in September 1971 used three different engineering fabrics. A final report concluding generally favorable performance was distributed in May 1977. There have been a number of Iowa engineering fabric installations since that initial project.
Resumo:
Stopping and turning maneuvers on high traffic volume asphalt cement concrete surfaced roads and streets often cause distortion of the pavement. Distortion may show up as excessive rutting in the wheel path, shoving of the pavement and/or rippling of the surface. Often times repeated corrective work such as cold milling or heater planing is required in these areas to maintain the pavement surface in a reasonable condition. In recent years polymer additives have been developed for asphalt cement concrete paving mixes that show promise in improving the inplace stability of the pavements. AC-13 (Styrelf 13) available from Bitucote Products Company, St. Louis, Missouri is an asphalt cement that has been modified by an additive to exhibit characteristics of very high stability in asphalt mixes.
Resumo:
Foamed asphalt shoulders were placed on an Industrial Connector road at the south edge of Muscatine. The foamed asphalt was produced by injecting 1 to 2 percent water into hot asphalt cement in a patented foaming chamber. A foam develops which is 10 to 15 times the original volume. of the asphalt cement. A 3/8" limestone aggregate was used in the foamed asphalt mixture. This foamed asphalt was placed on the shoulders and in the radii on the Industrial Connector road in May 1987. The radii were later replaced due to reconstruction, but the shoulders remain and performed fairly well with some recent stripping and potholing. The performance appeared to be lower than expected from conventional hot mix on projects with similar traffic.
Resumo:
The report compares and contrasts the automated PASCO method of pavement evaluation to the manual procedures used by the Iowa Department of Transportation (DOT) to evaluate pavement condition. Iowa DOT's use of IJK and BPR roadmeters and manual crack and patch surveys are compared to PASCO's use of 35-mm photography, artificial lighting and hairline projection, tracking wheels and lasers to measure ride, cracking and patching, rut depths, and roughness. The Iowa DOT method provides a Present Serviceability Index (PSI) value and PASCO provides a Maintenance Control Index (MCI). Seven sections of Interstate Highway, county roads and city streets, and one shoulder section were tested with different speeds of data collection, surface types and textures, and stop and start conditions. High correlation of results between the two methods in the measurement of roughness (0.93 for the tracking wheel and 0.84 for the laser method) were recorded. Rut depth correlations of 0.61 and cracking of 0.32 are attributed to PASCO's more comprehensive measurement techniques. A cost analysis of the data provided by both systems indicates that PASCO is capable of providing a comparable result with improved accuracy at a cost of $125-$150 or less per two-lane mile depending on survey mileage. Improved data collection speed, accuracy, and reliability, and a visible record of pavement condition for comparable costs are available. The PASCO system's ability to provide the data required in the Highway Pavement Distress Identification Manual, the Pavement Condition Rating Guide, and the Strategic Highway Research Program Long Term Pavement Performance (LTPP) Studies, is also outlined in the report.
Resumo:
A one mile section each of thermoplastic and epoxy pavement marking materials were placed on new ACC pavement near Carroll, IA on Highway 30. The markings were evaluated for four years to see if they were suitable materials for durable pavement markings. The epoxy markings were inadvertently repainted after two years. They were performing well up to that time with little plow damage and good retroreflectivity. The thermoplastic dash lines suffered heavy snow plow damage after the first year and were repainted after the third winter. The thermoplastic edge lines performed fairly well for four years.