357 resultados para road project
Resumo:
Adverse weather conditions dramatically affect the nation’s surface transportation system. The development of a prototype winter Maintenance Decision Support System (MDSS) is part of the Federal Highway Administration’s effort to produce a prototype tool for decision support to winter road maintenance managers to help make the highways safer for the traveling public. The MDSS is based on leading diagnostic and prognostic weather research capabilities and road condition algorithms, which are being developed at national research centers. In 2003, the Iowa Department of Transportation was chosen as a field test bed for the continuing development of this important research program. The Center for Transportation Research and Education assisted the Iowa Department of Transportation by collecting and analyzing surface condition data. The Federal Highway Administration also selected five national research centers to participate in the development of the prototype MDSS. It is anticipated that components of the prototype MDSS system developed by this project will ultimately be deployed by road operating agencies, including state departments of transportation, and generally supplied by private vendors.
Resumo:
Senate File 2355, 85th General Assembly, states the Iowa Department of Transportation shall submit annual reports regarding the implementation of efficiency measures identified in the “Road Use Tax Fund Efficiency Report,” January 2012. This report shall provide details of activities undertaken in the previous year relating to one-time and long-term program efficiencies and partnership efficiencies. Issues to be covered in the reports shall include but are not limited to savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
The U.S. Environmental Protection Agency (EPA) is completing a third five-year review of the E.I. du Pont de Nemours & Co., Inc., County Road X-23 Superfund site in Lee County, Iowa. The site is also known as the Baier and McCarl subsites. The EPA is inviting public comment on whether the current site remedy continues to be protective of public health and the environment. The Iowa Department of Public Health in cooperation with the Agency for Toxic Substances and Disease Registry (ATSDR) prepared this health consultation to review the current status of the Baier and McCarl subsites and to provide an evaluation of the public health status of these subsites. The information in this health consultation was current at the time of writing. Data that emerges later could alter this docum ent’s conclusions and recommendations.
Resumo:
A resident within one of the counties in your region has expressed some concern regarding potential adverse health effects from dust and material that may be found within foundry slag that has been used as a replacement for road rock. This consultation includes a comparison of nuisance issues from dust generated from a road constructed of foundry slag and dust generated from a road constructed from typical road rock. This consultation also includes a discussion of the potential health effects of exposure of heavy metals from incidental ingestion of foundry slag.
Resumo:
The Mitchell County Soil and Water Conservation District is applying on behalf of the incorporated community of Carpenter to construct a wastewater collection and treatment system to assist in the environmental cleanup and protection of Deer Creek. IDNR water monitoring of the community tile line has shown consistently elevated levels of fecal coliform bacteria indicating the presence of untreated sewage water. These are obvious health threats to the downstream users and wildlife in Deer Creek and the Cedar River. A new sewer system for the community of Carpenter will eliminate illegal discharges into the creed and be the first step in the overall protection of the stream.
Resumo:
Lime Creek is a sub-watershed of the Cedar River above; approximately 25 miles from Cedar Rapids. The lower half of the stream is on the Iowa 2004 Section 303(d) impaired waters list. Monitoring by the Cedar River Watershed Monitoring Coalition documents that Lime Creek delivers above average amounts of nitrate+ nitrite-N, ammonia-Nand total phosphorus (above the 901 percentile) compared to other Cedar River sub-watersheds. The Cedar Rapids water utility is concerned about increasing delivery of nitrate+nitrate to the Cedar River, which provides drinking water for about 125,000 people in the area. A group of local citizens has formed the Lime Creek watershed council with the goal of reducing pollutant delivery to the creek and promoting sustainable, watershed-wide action by producers, urban and rural residents for improved environmental management. The council has established a performance-based program that rewards cooperators for improvement in research-based test and index scores which directly measure environmental impact of BMPs. The Iowa Com Growers Association is funding the performance rewards. The Watershed Coalition is contributing in-kind monitoring. Council and performance cooperators participate primarily with commitment of their own resources. WIRB funds will be used to increase program cooperators and for staff support. In addition to improvement of water quality in Lime Creek, the project will establish baseline values for arket-based a pro ch to valuing pollutant reduction by intensive livestock operations in eastern Iowa.
Resumo:
The Center for Transportation Research and Education performed a traffic signal inventory study for the Iowa Department of Transportation. The purpose of this study was to determine the level of compliance with the Manual on Uniform Traffic Control Devices (MUTCD) and other industry standards of traffic signals on the state highway system. Signals were randomly selected throughout the State of Iowa. Only signals in cities with a population less than 5,000 were considered. Several intersections need to be addressed immediately to correct clearance timing settings. Red clearance intervals were frequently too short. A handful of intersections had inadequate pedestrian clearance times. Six intersections had at least one yellow clearance interval that did not meet Institute of Transportation Engineers standards. Some of the intersections likely would not meet traffic signal warrants and should be investigated for possible removal. The most common problem found with traffic signals was a lack of maintenance. Many of the signals had at least one of the following problems: burned out lights (signals and/or pedestrian heads), pedestrian lenses in need of replacement, dirty cabinet/missing or poor filter, missing visors, or inoperative pedestrian push buttons. Timing sheets were frequently missing or out of date. Another frequent noncompliance issue was the use of backplates. The MUTCD states that backplates should be used on signals viewed against a bright sky. The majority of signals inventoried did not have backplates on the mast-arm mounted signals. The timing at some intersections could likely be improved by reducing the cycle length. Where there were multiple signals in close proximity rarely was there any attempt at signal coordination. Finally, a number of intersections had equipment that by today’s standards would be considered obsolete.
Resumo:
This research project was intended to produce a strategy for addressing current and future access management problems on state highway routes located just outside urban areas that serve as major routes for commuting into and out of major employment centers in Iowa. There were two basic goals: (1) to develop a ranking system for identifying high-priority segments for access management treatments on primary highways outside metro and urban areas and (2) to focus efforts on routes that are major commuting routes at present and in the future. The project focused on four-lane expressways and two-lane arterials most likely to serve extensive commuter traffic. Available spatial and statistical data were used to identify existing and possible future problem corridors with respect to access management. The research team developed a scheme for ranking commuter routes based on their need for attention to access management. This project was able to produce rankings for corridors based on a variety of factors, including proportion of crashes that appear to be access-related, severity of those crashes, and potential for improvement along corridors. Frequency and loss were found to be highly rank correlated; because of this, these indicators were not used together in developing final priority rankings. Most of the highest ranked routes are on two-lane rural cross sections, but a few are four-lane expressways with at-grade private driveways and public road intersections. The most important conclusion of the ranking system is that many of the poor-performing corridors are located in a single Iowa Department of Transportation district near two urban areas--Des Moines and Ames. A comprehensive approach to managing access along commuting corridors should be developed first in this district since the potential benefits would be highest in that region.
Resumo:
A water quality resource concern has come to the forefront in the Upper Miller Creek watershed in Black Hawk County after five to seven inches of rain fell on the area on May 22nd and 23rd of 2004 and unprecedented amounts of soil and organic debris were washed from cultivated areas, clogging most culverts and roadside ditches. The quantity of soil deposited in ditches gave a good indication of the amounts that were transported into the stream. The estimated total cost to Black Hawk County for cleanup and repair within the road right-of-way was $345,000. There were undetermined environmental costs incurred when the incredibly high volumes of soil washed from the fields into Miller Creek which flows directly into the Cedar River that is identified by the Department of Natural Resources as an impaired water body. The Upper Miller Creek Watershed Project is an innovative, collaborative project intended to meet a specific need identified by a local steering committee made up of concerned community agencies and local landowners. Led by the Soil and Water Conservation District and the Black Hawk County Board of Supervisors, the Miller Creek Watershed Project seeks to reduce soil erosion, improve water quality, and reduce county road infrastructure cost by implementing conservation practices, reducing nutrient and pesticide use and improving wildlife habitat.
Resumo:
Two sections of the Yellow River have been named to the State of Iowa’s 303d list of impaired waters. The listing reflects streams with pollution problems linked to habitat alterations, in addition to those with potential disease causing bacteria, viruses and parasites. This fact, combined with local knowledge of water quality problems, shows the need for land treatment practices and habitat improvement measures. This project would target the Yellow River watershed, which totals approximately 49,800 acres. Areas that drain directly into the Yellow River mainstream will be targeted. Individually, these areas are too small to be considered sub-watersheds. This project will assess the drainage areas for active gullies and prioritize grade stabilization structures based upon severity and impact on the fishery. Funding would be utilized to target high priority grade stabilization structure sites and provide cost-share for those projects. A prerequisite for cost-share allocation is 75% of the land contributing to the drainage area must have some form of treatment in place. The Allamakee SWCD has received an EPA Region 7 Grant toward grade stabilization structures in the same area. Landowners have indicated that 75% cost-share is necessary to implement practices. To meet this request, the EPA funding would be used at a 15% cost-share rate if matched with 60% cost-share from WIRB funding. If matched with Federal EQIP funds, 25% of funds obtained from WIRB would be used. If other funds were depleted, WIRB funds would be utilized for the entire 75% cost-share.
Resumo:
An overall effort has been initiated to improve the quality of the Yellow River in Northeast Iowa by reducing the amount of sediment and bacteria entering the stream. Funding for this project will be utilized to improve stream quality to the level of fully supporting game fish such as brown, rainbow and brook trout, walleye, northern pike and smallmouth bass. The Yellow River has the potential to be one of the top trout streams, not only in Iowa, but in the entire Upper Midwest. This project will greatly enhance recreational activities such as fishing, canoeing and inner tubing and will greatly increase tourism dollars to the state. The project will specifically address two sources of impairment: stream bank erosion and coliform bacteria from both livestock and inadequate human septic systems.
Resumo:
Managing existing and newly constructed highway corridors has recently become a significant concern in many states, including Iowa. As urban land and land on the urban fringe develops, there is pressure to add features such as commercial driveways, at-grade public road intersections, and traffic signals to arterial highway routes that should primarily serve high-speed traffic. This diminishes the speed and traffic capacity of such roadways and can also cause significant safety issues. if mobility and safety are diminished, the value of the highway investment is diminished. Since a major highway corridor improvement may cost tens of millions of dollars or more, corridor management is as critical to preserving that investment as is more "hard side" management practices such as pavement or bridge management. Corridor management is a process that applies access management principles to highway corridors in an attempt to balance the competing needs of traffic service, safety, and support for land development. This project helped to identify routes that should be given high priority for corridor management. The pilot study in the form of two corridor management case studies provides an analytical process that can be replicated along the other Iowa commuting corridors using commonly available transportation and land use data resources. It also offers a general set of guidelines for the Iowa Department of Transportation to use in the development of its own comprehensive corridor management program.
Resumo:
This project concept and assessment of impacts includes information on future four-lane construction of U.S. 151 from the existing four-lane section near Cedar Rapids to Dubuque.
Resumo:
Summary of Project AWARE on the Wapsipinicon River in 2015.Project AWARE is a volunteer river cleanup event.
Resumo:
Fly ash, a by-product of coal-fired electricity generating plants, has for years been promoted as a material suitable for highway construction. Disposal of the large quantities of fly ash produced is expensive and creates environmental concerns. The pozzolanic properties make it promotable as a partial Portland cement replacement in pc concrete, a stabilizer for soil and aggregate in embankments and road bases, and a filler material in grout. Stabilizing soils and aggregates for road construction has the potential of using large quantities of fly ash. Iowa Highway Research Board Project HR-194, "Mission-Oriented Dust Control and Surface Improvement Processes for Unpaved Roads", included short test sections of cement, fly ash, and salvaged granular road material mixed for a base in western Iowa. The research showed that cement fly ash aggregate (CFA) has promise as a stabilizing agent in Iowa. There are several sources of sand that when mixed with fly ash may attain strengths much greater than fly ash mixed with salvaged granular road material at little additional cost