369 resultados para Pavement recycling


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report is a supplement to one issued in late summer 1986 which covered construction on U.S. 71, in Buena Vista County Iowa. The work involved rehabilitation of an older 20 feet wide pavement by placing a four inch thick bonded concrete overlay monolithically with two feet of widening on each side. The work was performed on one lane at a time while construction traffic and limited public traffic used the adjacent traffic lane. When work on the first lane was complete traffic was moved onto it and rehabilitation was completed on the second lane. This report covers the condition of the rehabilitated roadway in May 1987 after the first winter. The condition is described by visual observations, core conditions, and various test results including core compressive strength, direct shear tests on cores for bond strength, profilometer results and delamtect test results.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In recent years, ultra-thin whitetopping (UTW) has evolved as a viable rehabilitation technique for deteriorated asphalt cement concrete (ACC) pavement. Numerous UTW projects have been constructed and tested, enabling researchers to identify key elements contributing to their successful performance. These elements include foundation support, the interface bonding condition, portland cement concrete (PCC) overlay thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. The interface bonding condition is the most important of these elements. It enables the pavement to act as a composite structure, thus reducing tensile stresses and allowing an ultra-thin PCC overlay to perform as intended. Although the main factors affecting UTW performance have been identified in previous research, neither the impact that external variables have on the elements nor the element interaction have been thoroughly investigated. The objective of this research was to investigate the interface bonding condition between an ultra-thin PCC overlay and an ACC base over time, considering the previously mentioned variables. Laboratory testing and full scale field testing were planned to accomplish the research objective. Laboratory testing involved monitoring interface strains in fabricated PCC/ACC composite test beams subjected to either static or dynamic flexural loading. Variables investigated included ACC surface preparation, PCC thickness, and synthetic fiber reinforcement usage. Field testing involved monitoring PCC/ACC interface stains and temperatures, falling weight deflectometer (FWD) deflection responses, direct shear strengths, and distresses on a 7.2 mile Iowa Department of Transportation (Iowa DOT) UTW project (HR-559). The project was located on Iowa Highway 21 between Iowa Highway 212 and U.S. Highway 6 in Iowa County, near Belle Plaine, Iowa. Variables investigated included ACC surface preparation, PCC thickness, synthetic fiber reinforcement usage, joint spacing, and joint sealing. This report documents the planning, equipment selection, and construction of the project built in 1994.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Since 1978 the concept of longitudinal edge drains along Iowa primary and Interstate highways has been accepted as a cost-effective way of prolonging pavement life. Edge-drain installations have increased over the years, reaching a total of nearly 3,000 mi by 1989. With so many miles of edge drain installed, the development of a system for inspection and evaluation of the drains became essential. Equipment was purchased to evaluate 4-in.-diameter and geocomposite edge drains. Initial evaluations at various sites supported the need for a postconstruction inspection program to ensure that edge-drain installations were in accord with plans and specifications. Information disclosed by video inspections in edge drains and in culverts was compiled on videotape to be used as an informative tool for personnel in the design, construction, and maintenance departments. Video evaluations have influenced changes in maintenance, design, and construction inspection for highway drainage systems in Iowa.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Over the years, the Iowa Department of Transportation has established an outstanding network of connector highways across the state of Iowa. Construction and paving of these primary roadways has essentially been completed. Unfortunately, many of these primary highway pavements are reaching their design life and are in need of rehabilitation. The emphasis, therefore, has shifted from the construction of new highways to the maintenance and rehabilitation of existing highways. The Iowa DOT in recent years has become more concerned with preventing the ingress of surface water into the pavement structure. Crack sealing is receiving greater emphasis. Specifications have been modified to require improved low modulus crack and joint sealing materials.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fast Track concrete has proven to be successful in obtaining high early strengths. This benefit does not come without cost. Special Type III cement and insulating blankets to accelerate the cure add to its expense when compared to conventional paving. This research was intended to determine the benefit derived from the use of insulating blankets to accelerate strength gain in three concrete mixes using Type I cement. The goal was to determine mixes and curing procedures that would result in a range of opening times. This determination would allow the most economical design for a particular project by tailoring it to a specific time restraint. Three mixes of various cement content were tested in the field. Flexural beams were cast for each mix and tested at various ages. Two test sections were placed for each mix, one section being cured with the addition of insulating blankets and the other being cured with only conventional curing compound. Iowa Department of Transportation specifications require 500 psi flexural strength before a pavement can be opened to traffic. Concrete with Fast Track proportions (nominal 7 1/2 bag), Type I cement, and insulating blankets reached that strength in approximately 36 hr, a standard mix (nominal 6 1/2 bag) using the blankets in approximately 48 hr, and the Fast Track proportions with Type I cement without blankets in about 60 hr. The results showed a significant improvement in early strength gain with the use of insulating blankets.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Discarded tires have become a major disposal problem in the U.S. Different techniques of recycling these discarded tires have been tried. The state of Iowa is currently evaluating the use of discarded tires ground into crumb rubber and blending it with asphalt to make asphalt rubber cement (ARC}. This was the sixth project this process has been used in. This project is located on US 169 from the east junction of IA 175 west and north to US 20. Only the binder course was placed this year with the surface course to be let at a later date. There are four test sections, two sections with conventional mixtures and two with ARC mixtures.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Discarded tires present major disposal and environmental problems. One method of recycling tires is to use finely ground rubber from tires in asphalt cement concrete (ACC). This process has been researched in Iowa since 1991. There are currently eight projects being researched. This project involved using crumb rubber modifier (CRM) in ACC using a dry process. This project is located on US 63 in Howard County. It involved 17 test sections. There were five test sections using 20 lb of CRM per ton, four test sections using 10 lb of CRM per ton and eight test sections using a conventional mix. Not only were different mixes used, but the overlay was also placed in various thicknesses ranging from 2 in. to 8 in. (5 cm to 20 cm). The project was completed in August 1994. The project construction went well with only minor problems. This report contains information about procedures and tests that were completed and those that will be completed. Evaluation on the project will continue for five years.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This is Part 3 of a study of creep and resilient modulus testing of hot mix asphalt concrete. The creep and resilient modulus testing in Part 1 showed the improved load carrying characteristics of crushed particles. Cores from pavements drilled in Part 2 exhibited a poor correlation with rutting and creep/resilient modulus on pavement with a range of rut depths. The objective of Part 3 was to determine the relationship of creep and resilient modulus for 1) Marshall specimens from laboratory mixing for mix design; 2) Marshall specimens from construction plant mixing; and 3) cores drilled from the hot mixed asphalt pavement. The creep and resilient modulus data from these three sources exhibited substantial variations. No meaningful correlations of the results from these three sources were obtained.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this research was to evaluate the performance and the use of asphalt rubber binders and recycled rubber granules in asphalt pavement in the state of Iowa. This five year research project was initiated in June 1991 and it was incorporated into Muscatine County Construction Project US 61 from Muscatine to Blue Grass over an existing 10 in. (25.4 cm) by 24 ft (7.3 m) jointed rigid concrete pavement constructed in 1957. The research site consisted of four experimental sections (one section containing rubber chip, one section containing reacted asphalt rubber in both binder and surface, and two sections containing reacted asphalt rubber in surface) and four control sections. This report contains findings of the University of Northern Iowa research team covering selected responsibilities of the research project "Determination of the aging and changing of the conventional asphalt binder and asphalt-rubber binder". Based on the laboratory test, the inclusion of recycled crumb rubber into asphalt affects the ductility of modified binder at various temperatures.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

One of the most serious impediments to the continued successful use of hot-mix asphalt (HMA) pavements is rutting. The Iowa Department of Transportation has required 85% crushed particles and 75-blow Marshall mix design in an effort to prevent rutting on Interstate roadways. Relationships between the percent of crushed particles and resistance to rutting in pavement through the use of various laboratory test procedures must be developed. HMA mixtures were made with 0, 30, 60, 85, and 100% crushed gravel, crushed limestone, and crushed quartzite combined with uncrushed sand and gravel. These aggregate combinations were used with 4, 5, and 6% asphalt cement (ac). Laboratory tests included Marshall stability, resilient modulus, indirect tensile, and creep. A creep resistance factor (CRF) was developed to provide a single numeric value for creep test results. The CRF values relate well to the amount of crushed particles and the perceived resistance to rutting. The indirect tensile test is highly dependent on the ac with a small effect from the percent of crushed particles. The Marshall stability from 75-blow compaction relates well to the percent of crushed particles. The resilient modulus in some cases is highly affected by grade of ac.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In searching for simple and reliable test methods to evaluate the quality of Iowa portland cement concrete (PCC) pavements, the Duggan test was conducted for concretes made of twenty-six types of cements in this laboratory research. The influence of some factors, such as chemical composition and type of cements, use of air-entraining agent and water reducer, and water to cement ratio, on the result of the Duggan test was examined. It was found that the expansion increases with increasing values of potassium alkali (K2O) and sulfur trioxide (SO3) in cements. It was also found that the Type I cements generally produce higher expansion than the Type II, IP and IS cements. Since it is difficult to identify the major mechanism leading to the expansion observed in the Duggan test, more studies are certainly needed before it can be used as a reliable test method for evaluating the service life of concrete pavement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Highway safety and pavement performance can be directly influenced by the type of shoulders that are constructed. Shoulder design alternatives have always been rather limited. Moreover, the use of some of the alternatives has always been restricted by funding limitations. This research project seeks to explore the use of modified macadam base construction for shoulders. This type of shoulder design could offer the designer another option when paved or stabilized shoulders are being considered. Macadam base construction has in the past been shown to be quite strong and freedraining. Two macadam base shoulder designs were developed and constructed for this research project. A new roadway embankment and P.C.C. pavement were constructed on a section of US 6 east of Adel in Dallas County. The macadam base shoulders were constructed adjacent to the pavement as part of the project. The north shoulder was finished with a choke stone course and bituminous surface treatment and the south shoulder was finished with a two (2) inch layer of Type B Class II asphalt concrete. The initial results are considered satisfactory. Follow-up performance evaluation and load bearing tests are planned.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Methods of improving highway safety are of major concern to everyone who is involved in the planning, development and construction of improvements of our vast highway network. Other major concerns are the conservation of our rapidly disappearing sources of energy and quality building materials. This research is devoted to further exploration of a process which will: 1. help preserve higher quality aggregates; and, 2. improve the frictional characteristics and surface texture of asphalt pavement surfaces. Sprinkle treatment of asphalt concrete pavement surfaces with a non-polishing aggregate, a procedure which was developed in Europe, is one method which has shown promise in accomplishing the above listed objectives. This research seeks to explore the feasibility and cost effectiveness of using standard asphalt mixtures of local, less expensive aggregates for surface courses followed by a surface sprinkle treatment of a hard, durable, non-polishing layer of precoated chips to produce a durable, non-skid pavement surface for safe highway travel. Three standard mixture types are being evaluated for aggregate retention characteristics and six sprinkle aggregates are being evaluated for durability, polishing and friction characteristics. In addition, measurements of the surface texture by the silicone putty method are being made. Another feature of this research is the evaluation of a rubberized asphalt material called Overflex MS as a crack filler. It has been reported that the material could be beneficial in reducing reflective cracking. The project was begun in July of 1978 and was completed in August. A review made in the spring of 1979 indicates very satisfactory performance. It was determined from slide photos taken after construction and again in the spring that aggregate retention was very good. However, many cracks had reflected indicating that the Overflex MS had not been effective. Follow up friction test results and texture analysis were also very good. The results of these tests are shown in Appendix A.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In 1980, a Vanguard High Pressure Water Blaster capable of providing 10 gallons of water per minute at 2000 psi was purchased to evaluate water blasting as a crack cleaning method prior to crack filling on asphalt concrete pavements. Afer some iniital trials demonstrated its effectiveness of removing dirt, debris and vegetation, it was included in joint and crack maintenance research on Iowa 7 in Webster County. The objective of the research was to evaluate six crack preparation methods and seven "sealant" materials. The cleaning and sealing was performed in the spring of 1983. Visual evaluations of the performance were made in the fall of 1983 and spring of 1985. Compressed air and/or high pressure water did not adequately prepare cracks less than 3/8 inch wide. Routing or sawing was necessary to provide a sealant reservoir. The water blaster was more effective than compressed air in removing dirt, debris and vegetation but this did not yield significant improvement in sealant adhesion or longevity. Periodic crack filling is necessary on ACC surfaces throughout the remaining life of the pavement.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The objectives of this research were to develop a low cost fly ash-sand stabilized roadway and to correlate field performance with pavement design assumptions on a county road heavily trafficked by trucks hauling grain. The road was constructed during the summer of 1984. Three test sections comprised of different base thicknesses were incorporated in the roadway and were tested for compressive stength, structural rating, and rut depth. Annual crack surveys showed no appreciable difference in transverse cracking between the test sections and little to no rutting. The sandbase drainage characteristics beneath the roadway may have contributed to the satisfactory performance of the test sections. This project indicates that in spite of the inflated cost of construction due to the research nature of the work, a fly ash-sand base can be a viable alternative for roadway stabilization.