360 resultados para Special districts
Resumo:
Weekly newsletter for Center For Acute Disease Epidemiology of Iowa Department of Public Health. SPECIAL ALERT
Resumo:
Weekly newsletter for Center For Acute Disease Epidemiology of Iowa Department of Public Health. SPECIAL ALERT
Resumo:
Special investigation of the City of Farmington for the period July 1, 2009 through November 30, 2012
Resumo:
Report on a special investigation of the City of Grand River for the period July 1, 2004 through March 7, 2012
Resumo:
Weekly newsletter for Center For Acute Disease Epidemiology of Iowa Department of Public Health. SPECIAL ALERT
Resumo:
Report on a special investigation of the football program at Lincoln High School within the Des Moines Independent Community School District for the period May 30, 2003 through October 31, 2012
Resumo:
Addendum to a report on a special investigation of the Iowa Department of Transportation for the period January 29, 1994 through June 30, 2013
Resumo:
Report on a special investigation of Remsen-Union Family Connections for the period July 1, 2011 through October 31, 2012
Resumo:
Report on a special investigation of the City of Sloan for the period May 19, 2009 through March 31, 2013
Resumo:
Special investigation of the Garner Volunteer Ambulance Service for the period July 1, 2011 through June 30, 2012
Resumo:
Report on a special investigation of the City of Riverside for the period July 1, 2006 through December 31, 2012
Resumo:
Research project HR-231, "Special Surface Preparation Prior to Bituminous Overlay", was initiated in 1982 to study the effectiveness of three different crack fillers in extending pavement life. In particular, this project was designed to determine if any of the fillers could substantially reduce the rate of subsurface deterioration and general deterioration of an asphalt pavement at crack locations. This project also sought to determine the effects of the various crack filling procedures on different thicknesses of bituminous overlays. The three fillers, a fly ash slurry, an emulsion, and a rubberized asphalt mixture, were used along with a control section with no crack filler material on a 2.5 mile section of Cerro Gordo Trunk Route S-25 south of the town of Thornton. This report discusses the construction and performance of each filler material and makes recommendations concerning future use of any of the materials used.
Resumo:
Report on a special investigation of Grange Township for the period January 1, 2006 through November 15, 2013
Resumo:
Iowa Lottery Retailer Newsletter Special Edition
Resumo:
Iowa Lottery Action Special Edition Retailer Newsletter