19 resultados para whether entitlement to payment for completed work
Resumo:
This document contains a discussion of the reasons why the project did not succeed. A detailed discussion of the steps taken by the Iowa Department of Transportation to make the experiment work are contained in this document, along with recommendations for future projects.
Resumo:
This report describes a new approach to the problem of scheduling highway construction type projects. The technique can accurately model linear activities and identify the controlling activity path on a linear schedule. Current scheduling practices are unable to accomplish these two tasks with any accuracy for linear activities, leaving planners and manager suspicious of the information they provide. Basic linear scheduling is not a new technique, and many attempts have been made to apply it to various types of work in the past. However, the technique has never been widely used because of the lack of an analytical approach to activity relationships and development of an analytical approach to determining controlling activities. The Linear Scheduling Model (LSM) developed in this report, completes the linear scheduling technique by adding to linear scheduling all of the analytical capabilities, including computer applications, present in CPM scheduling today. The LSM has tremendous potential, and will likely have a significant impact on the way linear construction is scheduled in the future.
Effect of Delay in Testing Asphalt Concrete Specimens for Marshall Stability, MLR-86-08, Draft, 1986
Resumo:
The Central Laboratory has been delaying the mix design testing of 2 1/2" X 4" Marshall specimens for stability, until the next day after molding. For example, if the mixes are made and samples molded on Friday a man would have to come in and work on Saturday to test these specimens. The reason for this is that the ASTM-01559 "Resistance to Plastic Flow of Bituminous Mixes Using Marshall Apparatus," states that "the specimens after being molded shall be carefully transferred to a smooth, flat surface and allowed to stand overnight at room temperature, before being weighed, measured and tested." The AASHTO procedure, AASHTO Designation T-245-82 "Resistance to Plastic Flow of Bituminous Mixtures using Marshall Apparatus," does not say when the specimens shall be tested for stability. The IDOT Lab. Specifications, Test Method No. Iowa 502-8 and test method No. Iowa 506-C "compacting asphaltic concrete by the Marshall Method" and "Resistance to Plastic Flow of Bituminous Mixtures Using the Marshall Apparatus," respectively, only state that the specimens shall be cooled before testing. Due to the above conflict in specifications, a number of mix samples were tested, in the Central Lab, for stability on different days. This should furnish enough information to allow us to change the procedure and to test for stability the same day molded, or be able to delay the testing for 3 days or more.
Resumo:
Transportation planners typically use census data or small sample surveys to help estimate work trips in metropolitan areas. Census data are cheap to use but are only collected every 10 years and may not provide the answers that a planner is seeking. On the other hand, small sample survey data are fresh but can be very expensive to collect. This project involved using database and geographic information systems (GIS) technology to relate several administrative data sources that are not usually employed by transportation planners. These data sources included data collected by state agencies for unemployment insurance purposes and for drivers licensing. Together, these data sources could allow better estimates of the following information for a metropolitan area or planning region: · Locations of employers (work sites); · Locations of employees; · Travel flows between employees’ homes and their work locations. The required new employment database was created for a large, multi-county region in central Iowa. When evaluated against the estimates of a metropolitan planning organization, the new database did allow for a one to four percent improvement in estimates over the traditional approach. While this does not sound highly significant, the approach using improved employment data to synthesize home-based work (HBW) trip tables was particularly beneficial in improving estimated traffic on high-capacity routes. These are precisely the routes that transportation planners are most interested in modeling accurately. Therefore, the concept of using improved employment data for transportation planning was considered valuable and worthy of follow-up research.