24 resultados para user relations


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study is a concise summary of a study of trail users on the Raccoon River Valley Trail commissioned by the Dallas County Conservation Board. It provides information associated with natural and cultural resources.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa DOT reviewed Corps of Engineers accounting records to determine the costs of operating and maintaining a 300 mile section of the Mississippi River. This document reviews the details the study.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Report of recommendations to the Public Employment Relations Board for the year ending June 30, 2005

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agency Performance Plan, Public Employment Relations Board

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Provides instructions for using the computer program which was developed under the research project, "The Economics of Reducing the County Road System: Three Case Studies In Iowa". This program operates on an IBP personal computer with 300K storage. A fixed disk is required with at least 3 megabytes of storage. The computer must be equipped with DOS version 3.0; the programs are written in Fortran. The user's manual describes all data requirements including network preparation, trip information, cost for maintenance, reconstruction, etc. Program operation instructions are presented, as well as sample solution output and a listing of the computer programs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Audit report on the Public Employment Relations Board for the year ended June 30, 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Agency Performance Plan, Public Employment Relations Board

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Stage-discharge relations constitute a viable, alternative technique for estimating accurately flow for ungaged sites. In this research, we have utilized pressure transducers and Large Scale Particle Image Velocimetry techniques to develop stage-discharge relations at eleven sites in the Hungry Canyon Area (HCA) of southwestern Iowa under different hydrologic conditions. We have employed these data to calibrate and verify an established hydrologic model and then we have used this model to provide a stage discharge relation for different hydrologic conditions (i.e. rating curves). The benefits of the project are numerous including that the discharge data will be used for a number of purposes, including operational decision making in the HCA about the design of water-control and conveyance structures, input for hydraulic and hydrologic models, and calculation of sediment and other water quality constituents transport and “loads”, and for decision making. This project has also pointed out the difficulties in measuring flows in ungaged streams with ice jams, steep banks, erodible beds, and floating debris.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This manual describes how to use the Iowa Bridge Backwater software. It also documents the methods and equations used for the calculations. The main body describes how to use the software and the appendices cover technical aspects. The Bridge Backwater software performs 5 main tasks: Design Discharge Estimation; Stream Rating Curves; Floodway Encroachment; Bridge Backwater; and Bridge Scour. The intent of this program is to provide a simplified method for analysis of bridge backwater for rural structures located in areas with low flood damage potential. The software is written in Microsoft Visual Basic 6.0. It will run under Windows 95 or newer versions (i.e. Windows 98, NT, 2000, XP and later).