Resumo:
This report describes the development of performance measures for the Iowa DOT Construction Offices. The offices are responsible for administering all transportation construction projects for the Iowa DOT. In conjunction with a steering team composed of representatives of the Construction Offices, the research team developed a list of eight key processes and a set of measures for each. Two kinds of data were gathered: baseline data and benchmark data. Baseline data is used to characterize current performance. Benchmark data is gathered to find organizations that have excellent performance records for one or more key functions. This report discusses the methodology used and the results obtained. The data obtained represents the first set of data points. Subsequent years will establish trends for each of the measures, showing improvement or lack of it.
Resumo:
This report describes the continuation of the development of performance measures for the Iowa Department of Transportation (DOT) Offices of Construction. Those offices are responsible for administering transportation construction projects for the Iowa DOT. Researchers worked closely with the Benchmark Steering Team which was formed during Phase I of this project and is composed of representatives of the Offices of Construction. The research team conducted a second survey of Offices of Construction personnel, interviewed numerous members of the Offices and continued to work to improve the eight key processes identified during Phase I of this research. The eight key processes include Inspection of Work, Resolution of Technical Issues, Documentation of Work Progress and Pay Quantities, Employee Training and Development, Continuous Feedback for Improved Contract Documents, Provide Safe Traffic Control, External/Public Communication, and Providing Pre-Letting Information. Three to four measurements were specified for each key process. Many of these measurements required opinion surveys of employees, contractors, and others. During Phase II, researchers concentrated on conducting surveys, interviewing respondents to improve future surveys, and facilitating Benchmark Steering Team monthly meetings. Much effort was placed on using the information collected during the first year's research to improve the effectiveness and efficiency of the Offices of Construction. The results from Process Improvement Teams that studied Traffic Control and Resolution of Technical Issues were used to improve operations.
Resumo:
This is the final Report to the Iowa DOT Offices of Construction and the Highway Division for the calendar year 1999 research project entitled - Continuation of Benchmarking Project: Phase IV. This project continues efforts started in 1995 with the development of a performance measurement system. The performance measurements were used to identify areas that required improvement and process improvement teams (PITs) were launched to make recommendations for improvement. This report provides a brief historical background, documents Benchmark Steering Team Activities, describes measurement activities including the employee survey and collection of non-survey data. Then a retrospective of past PIT activities is given, which sets the stage for the substantial increase in PIT activity that occurred during the winter of 1998/9. Finally, the report closes with suggestions for future directions in Benchmarking Activity.
Resumo:
The main function of a roadway culvert is to effectively convey drainage flow during normal and extreme hydrologic conditions. This function is often impaired due to the sedimentation blockage of the culvert. This research sought to understand the mechanics of sedimentation process at multi-box culverts, and develop self-cleaning systems that flush out sediment deposits using the power of drainage flows. The research entailed field observations, laboratory experiments, and numerical simulations. The specific role of each of these investigative tools is summarized below: a) The field observations were aimed at understanding typical sedimentation patterns and their dependence on culvert geometry and hydrodynamic conditions during normal and extreme hydrologic events. b) The laboratory experiments were used for modeling sedimentation process observed insitu and for testing alternative self-cleaning concepts applied to culverts. The major tasks for the initial laboratory model study were to accurately replicate the culvert performance curves and the dynamics of sedimentation process, and to provide benchmark data for numerical simulation validation. c) The numerical simulations enhanced the understanding of the sedimentation processes and aided in testing flow cases complementary to those conducted in the model reducing the number of (more expensive) tests to be conducted in the laboratory. Using the findings acquired from the laboratory and simulation works, self-cleaning culvert concepts were developed and tested for a range of flow conditions. The screening of the alternative concepts was made through experimental studies in a 1:20 scale model guided by numerical simulations. To ensure the designs are effective, performance studies were finally conducted in a 1:20 hydraulic model using the most promising design alternatives to make sure that the proposed systems operate satisfactory under closer to natural scale conditions.