29 resultados para stakeholder pressures
Resumo:
Results are presented of triaxial testing of three crushed limestones to which either hydrated high-calcium lime, sodium chloride or calcium chloride had been added. Lime was added at rates of 1, 3, 10 and 16 percent, chlorides were added at 0.5 percent rate only. Speciments were compacted using vibratory compaction apparatus and were tested in triaxial compression using lateral pressures from 10 to 100 psi. Triaxial test results indicate that: (1) sodium chloride slightly decreased the angle of internal friction and increased cohesion, (2) calcium chloride slightly increased the angle of internal friction and decreased cohesion, and (3) lime had no appreciable effect on angle of internal friction but increased cohesion, decreased density and increased pore water pressure.
Resumo:
A highway base course may be defined as a layer of granular material which lies immediately below the wearing surface of a pavement and must possess high resistance to deformation in order to withstand pressures imposed by traffic. A material commonly used for base course construction is crushed limestone. Sources of limestone, acceptable for highway bases in the state of Iowa, occur almost entirely in the Pennsylvanian, Mississippian and Devonian strata. Performance records of the latter two have been quite good, while material from the Pennsylvanian stratum has failed on numerous occasions. The study reported herein is one segment of an extensive research program on compacted crushed limestone used for flexible highway base courses. The primary goals of the total study are: 1. Determination of a suitable and realistic laboratory method of compaction. 2. Effect of gradation, and mineralogy of the fines, on shearing strength. 3. Possible improvement of the shear strength with organic and inorganic chemical stabilization additives. Although the study reported herein deals primarily with the third goal, information gathered from work on the first two was required for this investigation. The primary goal of this study was the evaluation of various factors of stability of three crushed limestones when treated with small amounts of type I Portland cement. Investigation of the untreated materials has indicated that shear strength alone is not the controlling factor for stability of crushed stone bases. Thus the following observations were made in addition to shear strength parameters, to more adequately ascertain the stability of the cement treated materials: 1. Volume change during consolidation and shear testing. 2. Pore pressure during shear. The consolidated-undrained triaxial shear test was used for determination of the above factors.
Resumo:
The main consideration for base construction under the pavement, in the design of Iowa's interstate, was structural capacity. The material was dense graded with the aim of supporting the pavement and distributing the load as it is transferred to the underlying grade. The drainage characteristics of the base was apparently not given adequate consideration. On jointed portland cement concrete pavement, the water that is trapped immediately beneath the pavement causes severe problems. The traffic causes rapid movement of the water resulting in the hydraulic pressures or "pumping" (movement and redeposit of base fine material), further resulting in faulting between individual slabs. The objective of this evaluation is to determine if longitudinal subdrains are effective in preventing or reducing pumping, faulting and related deterioration. Results suggest that, based upon the flow from the outlets observed during periodic checks and evidence of water flow at the outlets, it appears that to date the subdrains are effective in draining the subbase and subgrade. Because of the limited data available at this time, however, the pavement condition and faulting results are inconclusive.
Resumo:
Construction of the interstate highway system began in 1956. This U.S. network of highway consists of more than 41,000 miles with 790 miles in Iowa. There have been many benefits of the controlled access roadway, but probably the most significant is the improved safety for the motorist. In Iowa, we have always endeavored to utilize quality locally available materials in our construction using the most economical or cost effective methods. Obviously when the effort is to build a cost effective system, there will be some portions of the network that will not perform as well as expected. In the design of our interstate, the main consideration for base construction under the pavement was structural capacity. The material was dense graded with the aim of supporting the pavement and distributing the load as it is transferred to the underlying grade. The drainage characteristic of the base was apparently not given adequate consideration. On jointed portland cement concrete (pcc) pavement, the water that is trapped immediately beneath the pavement causes severe problems. The traffic causes rapid movement of the water resulting in the hydraulic pressures or "pumping" (movement and redeposit of base fine material) resulting in faulting between individual slabs. Recognizing the need for maintaining this large national highway network, the Federal Highway Administration has initiated a funding program for resurfacing, restoration and rehabilitation (3R). Many miles of the system are more than 20 years old and in need of major maintenance. This new 3R Program necessitated a complete inventory of the Iowa interstate system to establish priorities and to identify those sections in need of immediate remedial treatments.
Resumo:
Senate File 2355, 85th General Assembly, states the Iowa Department of Transportation shall submit annual reports regarding the implementation of efficiency measures identified in the “Road Use Tax Fund Efficiency Report,” January 2012. This report shall provide details of activities undertaken in the previous year relating to one-time and long-term program efficiencies and partnership efficiencies. Issues to be covered in the reports shall include but are not limited to savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
The goal of this project was to provide an objective methodology to support public agencies and railroads in making decisions related to consolidation of at-grade rail-highway crossings. The project team developed a weighted-index method and accompanying Microsoft Excel spreadsheet based tool to help evaluate and prioritize all public highway-rail grade crossings systematically from a possible consolidation impact perspective. Factors identified by stakeholders as critical were traffic volume, heavy-truck traffic volume, proximity to emergency medical services, proximity to schools, road system, and out-of-distance travel. Given the inherent differences between urban and rural locations, factors were considered, and weighted, differently, based on crossing location. Application of a weighted-index method allowed for all factors of interest to be included and for these factors to be ranked independently, as well as weighted according to stakeholder priorities, to create a single index. If priorities change, this approach also allows for factors and weights to be adjusted. The prioritization generated by this approach may be used to convey the need and opportunity for crossing consolidation to decision makers and stakeholders. It may also be used to quickly investigate the feasibility of a possible consolidation. Independently computed crossing risk and relative impact of consolidation may be integrated and compared to develop the most appropriate treatment strategies or alternatives for a highway-rail grade crossing. A crossing with limited- or low-consolidation impact but a high safety risk may be a prime candidate for consolidation. Similarly, a crossing with potentially high-consolidation impact as well as high risk may be an excellent candidate for crossing improvements or grade separation. The results of the highway-rail grade crossing prioritization represent a consistent and quantitative, yet preliminary, assessment. The results may serve as the foundation for more rigorous or detailed analysis and feasibility studies. Other pertinent site-specific factors, such as safety, maintenance costs, economic impacts, and location-specific access and characteristics should be considered.
Resumo:
It is generally accepted that high density polyethylene pipe (HDPE) performs well under live loads with shallow cover, provided the backfill is well compacted. Although industry standards require carefully compacted backfill, poor inspection and/or faulty construction may result in soils that provide inadequate restraint at the springlines of the pipes thereby causing failure. The objectives of this study were: 1) to experimentally define a lower limit of compaction under which the pipes perform satisfactorily, 2) to quantify the increase in soil support as compaction effort increases, 3) to evaluate pipe response for loads applied near the ends of the buried pipes, 4) to determine minimum depths of cover for a variety of pipes and soil conditions by analytically expanding the experimental results through the use of the finite element program CANDE. The test procedures used here are conservative especially for low-density fills loaded to high contact stresses. The failures observed in these tests were the combined effect of soil bearing capacity at the soil surface and localized wall bending of the pipes. Under a pavement system, the pipes' performance would be expected to be considerably better. With those caveats, the following conclusions are drawn from this study. Glacial till compacted to 50% and 80% provides insufficient support; pipe failureoccurs at surface contact stresses lower than those induced by highway trucks. On the other hand, sand backfill compacted to more than 110 pcf (17.3 kN/m3) is satisfactory. The failure mode for all pipes with all backfills is localized wall bending. At moderate tire pressures, i.e. contact stresses, deflections are reduced significantly when backfill density is increased from about 50 pcf (7.9 kN/m^3) to 90 pcf (14.1 kN/m^3). Above that unit weight, little improvement in the soil-pipe system is observed. Although pipe stiffness may vary as much as 16%, analyses show that backfill density is more important than pipe stiffness in controlling both deflections at low pipe stresses and at the ultimate capacity of the soil-pipe system. The rate of increase in ultimate strength of the system increases nearly linearly with increasing backfill density. When loads equivalent to moderate tire pressures are applied near the ends of the pipes, pipe deflections are slighly higher than when loaded at the center. Except for low density glacial till, the deflections near the ends are not excessive and the pipes perform satisfactorily. For contact stresses near the upper limit of truck tire pressures and when loaded near the end, pipes fail with localized wall bending. For flowable fill backfill, the ultimate capacity of the pipes is nearly doubled and at the upper limit of highway truck tire pressures, deflections are negligible. All pipe specimens tested at ambient laboratory room temperatures satisfied AASHTO minimum pipe stiffness requirements at 5% deflection. However, nearly all specimens tested at elevated pipe surface temperatures, approximately 122°F (50°C), failed to meet these requirements. Some HDPE pipe installations may not meet AASHTO minimum pipe stiffness requirements when installed in the summer months (i.e. if pipe surface temperatures are allowed to attain temperatures similar to those tested here). Heating of any portion of the pipe circumference reduced the load carrying capacity of specimens. The minimum soil cover depths, determined from the CANOE analysis, are controlled by the 5% deflection criterion. The minimum soil cover height is 12 in. (305 mm). Pipes with the poor silt and clay backfills with less than 85% compaction require a minimum soil cover height of 24 in. (610 mm). For the sand at 80% compaction, the A36 HDPE pipe with the lowest moment of inertia requires a minimum of 24 in. (610 mm) soil cover. The C48 HDPE pipe with the largest moment of inertia and all other pipes require a 12 in. (305 mm) minimum soil cover.
Resumo:
An initial feasibility study indicated that the "Purdue Accelerated Polishing Method" gave repeatable results when testing the skid resistance of laboratory specimens. The results also showed a rough correlation with the field performance of the same aggregate sources. The research was then expanded to include all available asphalt aggregates. The results of the expanded study indicated that the method is not presently capable of developing and measuring the full skid potential of the various aggregate sources. Further research in the area of polishing times and/or pressures is needed.
Resumo:
The overarching goal of the proposed research was to provide a predictive tool for knickpoint propagation within the HCA (Hungry Canyon Alliance) territory. Knickpoints threaten the stability of bridge structures in Western Iowa. The study involved detailed field investigations over two years in order to monitor the upstream migration of a knickpoint on Mud Creek in Mills County, IA and identify the key mechanisms triggering knickpoint propagation. A state-of-the-art laser level system mounted on a movable truss provided continuous measurements of the knickpoint front for different flow conditions. A pressure transducer found in proximity of the truss provided simultaneous measurements of the flow depth. The laser and pressure transducer measurements led to the identification of the conditions at which the knickpoint migration commences. It was suggested that negative pressures developed by the reverse roller flow near the toe of the knickpoint face triggered undercutting of the knickpoint at this location. The pressure differential between the negative pressure and the atmospheric pressure also draws the impinging jet closer to the knickpoint face producing scour. In addition, the pressure differential may induce suction of sediment from the face. Other contributing factors include slump failure, seepage effects, and local fluvial erosion due to the exerted fluid shear. The prevailing flow conditions and soil information along with the channel cross-sectional geometry and gradient were used as inputs to a transcritical, one dimensional, hydraulic/geomorphic numerical model, which was used to map the flow characteristics and shear stress conditions near the knickpoint. Such detailed flow calculations do not exist in the published literature. The coupling of field and modeling work resulted in the development of a blueprint methodology, which can be adopted in different parts of the country for evaluating knickpoint evolution. This information will assist local government agencies in better understanding the principal factors that cause knickpoint propagation and help estimate the needed response time to control the propagation of a knickpoint after one has been identified.
Resumo:
The following document serves two purposes. First, the Environmental Protection Agency (EPA) requires a state to develop an approved Non-point Source Management Plan (NPSMP or Plan) that encompasses the nine key elements, described in full in Appendix A, to be eligible for federal Clean Water Act Section 319 funding. Second, the Plan serves as a representation of Iowa’s vision, goals, objectives and potential action steps to reduce non-point source pollution and improve water quality over the next five to ten years. This plan is not intended to be, nor should it be, limited to the Department of Natural Resources or Iowa’s Section 319 Program, but rather reflects the collective efforts and intents of the core partners and stakeholder groups that worked together to develop the goals identified herein and programmatic means of achieving those goals.
Resumo:
Senate File 2355, 85th General Assembly, states the Iowa Department of Transportation shall submit annual reports regarding the implementation of efficiency measures identified in the “Road Use Tax Fund Efficiency Report,” January 2012. This report shall provide details of activities undertaken in the previous year relating to one-time and long-term program efficiencies and partnership efficiencies. Issues to be covered in the reports shall include but are not limited to savings realized from the implementation of particular efficiency measures; updates concerning measures that have not been implemented; efforts involving cities, counties, other jurisdictions, or stakeholder interest groups; any new efficiency measures identified or undertaken; and identification of any legislative action that may be required to achieve efficiencies.
Resumo:
Visualization is a relatively recent tool available to engineers for enhancing transportation project design through improved communication, decision making, and stakeholder feedback. Current visualization techniques include image composites, video composites, 2D drawings, drive-through or fly-through animations, 3D rendering models, virtual reality, and 4D CAD. These methods are used mainly to communicate within the design and construction team and between the team and external stakeholders. Use of visualization improves understanding of design intent and project concepts and facilitates effective decision making. However, visualization tools are typically used for presentation only in large-scale urban projects. Visualization is not widely accepted due to a lack of demonstrated engineering benefits for typical agency projects, such as small- and medium-sized projects, rural projects, and projects where external stakeholder communication is not a major issue. Furthermore, there is a perceived high cost of investment of both financial and human capital in adopting visualization tools. The most advanced visualization technique of virtual reality has only been used in academic research settings, and 4D CAD has been used on a very limited basis for highly complicated specialty projects. However, there are a number of less intensive visualization methods available which may provide some benefit to many agency projects. In this paper, we present the results of a feasibility study examining the use of visualization and simulation applications for improving highway planning, design, construction, and safety and mobility.
Resumo:
Visualization is a relatively recent tool available to engineers for enhancing transportation project design through improved communication, decision making, and stakeholder feedback. Current visualization techniques include image composites, video composites, 2D drawings, drive-through or fly-through animations, 3D rendering models, virtual reality, and 4D CAD. These methods are used mainly to communicate within the design and construction team and between the team and external stakeholders. Use of visualization improves understanding of design intent and project concepts and facilitates effective decision making. However, visualization tools are typically used for presentation only in large-scale urban projects. Visualization is not widely accepted due to a lack of demonstrated engineering benefits for typical agency projects, such as small- and medium-sized projects, rural projects, and projects where external stakeholder communication is not a major issue. Furthermore, there is a perceived high cost of investment of both financial and human capital in adopting visualization tools. The most advanced visualization technique of virtual reality has only been used in academic research settings, and 4D CAD has been used on a very limited basis for highly complicated specialty projects. However, there are a number of less intensive visualization methods available which may provide some benefit to many agency projects. In this paper, we present the results of a feasibility study examining the use of visualization and simulation applications for improving highway planning, design, construction, and safety and mobility.
Resumo:
This report was developed by the Iowa Department of Public Health (IDPH) and it outlines consumer education and outreach research and strategies for Iowa’s Health Benefit Exchange. It reflects an initial draft plan for further discussion and amendment. Iowa’s Health Benefit Exchange will only succeed if there is stakeholder involvement in the planning process, extensive consumer education and engagement, and continued outreach.