28 resultados para soft agar overlay


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pavements have been overlaid with thin bonded portland cement concrete (PCC) for several years. These projects have had traffic detoured for a period of 5-10 days. These detours are unacceptable to the traveling public and result in severe criticism. The use of thin bonded fast track overlay was promoted to allow a thin bonded PCC overlay with minimal disruption of local traffic. This project demonstrated the concept of using one lane of the roadway to maintain traffic while the overlay was placed on the other and then with the rapid strength gain of the fast track concrete, the construction and local traffic is maintained on the newly placed, thin bonded overlay. The goals of this project were: 1. Traffic usage immediately after placement and finishing. 2. Reduce traffic disruption on a single lane to less than 5 hours. 3. Reduce traffic disruption on a given section of two-lane roadway to less than 2 days. 4. The procedure must be economically viable and competitive with existing alternatives. 5. Design life for new construction equivalent to or in excess of conventional pavements. 6. A 20 year minimum design life for rehabilitated pavements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In recent years the Iowa DOT has shifted emphasis from the construction of new roads to the maintenance and preservation of existing highways. A need has developed for analyzing pavements structurally to select the correct rehabilitation strategy and to properly design a pavement overlay if necessary. This need has been fulfilled by Road Rater testing which has been used successfully on all types of pavements to evaluate pavement and subgrade conditions and to design asphaltic concrete overlays. The Iowa Road Rater Design Method has been simplified so that it may be easily understood and used by the widely diverse groups of individuals which may be involved in pavement restoration and management. Road Rater analysis techniques have worked well to date and have been verified by pavement coring, soils sampling and testing, and pavement removal by block sampling. Void detection testing has also been performed experimentally in Iowa, and results indicate that the Road Rater can be used to locate pavement voids and that Road Rater analysis techniques are reasonably accurate. The success of Road Rater research and development has made deflection test data one of the most important pavement management inputs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Greene County, Iowa, overlay project, completed in October 1973, was evaluated in October 1978, after five years in October 1983, after ten years and most recently in October 1988 after fifteen years of service. The 33 fibrous concrete sections, four CRCP sections, two mesh reinforced and two plain concrete sections with doweled reinforcement were rated relative to each other on a scale of 0 to 100. The rating was conducted by original members of the Project Planning Committee, Iowa DOT, Iowa County, Federal Highway Administration and industry representatives. In all, there were 23, 25 and 17 representatives who rated the project in 1978, 1983 and 1988 respectively. The 23, 25 or 17 values were then averaged to provide a final rating number for each section or variable. All experimental overlay sections had performed quite well in the period from five through 15 years, experiencing only limited additional deterioration.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The three miles of fibrous concrete resurfacing in Greene County, Iowa were placed in September and early October, 1973. It was recognized in advance that cracking and other performance characteristics of the fibrous concrete sections and of the control sections would be major factors in the evaluation of the project. A low level aerial survey was made of the old pavement. During construction of the resurfacing, the aerial survey was checked to insure that cracks in the old pavement were referenced to the 100 ft. station marks placed in the resurfacing. A final report for research project HR-165, based upon overall performance evaluation was published in December 1978.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Greene County, Iowa, overlay project, completed in October, 1973, was evaluated in October, 1978, after five years of service and most recently in October, 1983, after ten years of service. The 33 fibrous concrete sections, four CRCP sections, two mesh reinforced and two plain concrete sections with doweled reinforcement were rated relative to each other on a scale of 0 to 100. The rating was conducted by original members of the Project Planning Committee, Iowa DOT, Iowa County, Federal Highway Administration, University of Illinois and industry representatives. In all, there were 23 and 24 representatives who rated the project in 1978 and 1983 respectively. The 23 or 24 values were then averaged to provide a final rating number for each section or variable. All experimental overlay sections had performed quite well in the period from five through 10 years, experiencing only limited additional deterioration. Based upon this relatively good performance through 10 years, the sections will be maintained for further research with another evaluation at 15 years. The 4" thick nonfibrous mesh reinforced continuous reinforced concrete pavement overlay sections provided the best performance in this research project. Another nonfibrous 5" thick bar reinforced overlay section performed almost as well. The best performance of a fibrous reinforced concrete section was obtained with 160 pounds of fiber per cubic yard.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa DOT has been using the "Iowa Method" thin bonded low-slump dense Portland Cement Concrete (PCC) bridge deck overlay for rehabilitation of delaminated decks since 1963. In time, continued use of studded tires will wear away the transverse grooved texture. The objective of this research was to evaluate the benefit of incorporating a hard durable aggregate into a dense PCC overlay to provide frictional property longevity. The project included three overlays on I-35 near Ankeny. The texture and friction properties of two overlays, one constructed with crushed granite and the other with crushed quartzite coarse aggregate, were compared to an overlay constructed with locally available crushed limestone. There were no construction problems resulting from the use of crushed granite or quartzite. There was no significant frictional property benefit from the crushed granite or crushed quartzite through six years.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Special Investigations Section recently completed the final evaluation of the I-80 eastbound bonded overlay placed in 1979 between the Shelby and Avoca interchanges in Pottawattamie County.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1994 the Iowa Department of Transportation constructed a 7.2-mile Portland Cement Concrete overlay project in Iowa County on Iowa Highway 21. The research work was conducted in cooperation with the Department of Civil Engineering and the Federal Highway Administration under the Iowa Highway Research Board project HR-559. The project was constructed to evaluate the performance of an ultrathin concrete overlay during a 5-year period. The experiment included variables of base surface preparation, overlay depth, joint spacing, fiber reinforcement, and the sealed or non-sealed joints. The project was instrumented to measure overlay/base interface temperatures and strains. Visual distress surveys and deflection testing were also used to monitor performance. Coring and direct shear testing was accomplished 3 times during the research period. Results of the testing and monitoring are identified in the report. The experiment was very successful and the results provide an insight into construction and design needs to be considered in tailoring a portland cement concrete overlay to a performance need. The results also indicate a method to monitor bond with nondestructive methods.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Intrusion of deicing materials and surface water into concrete bridge decks is a main contributor in deck reinforcing steel corrosion and concrete delamination. Salt, spread on bridge decks to melt ice, dissolves in water and permeates voids in the concrete deck. When the chloride content of the concrete in contact with reinforcing steel reaches a high enough concentration, the steel oxidizes. In Iowa, the method used to reduce bridge deck chloride penetration is the application of a low slump dense concrete overlay after the completion of all Class A and Class B floor repairs. A possible alternative to the use of dense concrete overlays, developed by Poly-Carb, Inc., is the MARK-163 FLEXOGRID Overlay System. FLEXOGRID is a two component system of epoxy and urethane which is applied on a bridge deck to a minimum thickness of ¼ inch. An aggregate mixture of silica quartz and aluminum oxide is broadcast onto the epoxy at a prescribed rate to provide deck protection and superior friction properties. The material is mixed on site and applied to the deck in a series of lifts (usually two) until the desired overlay thickness has been attained.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT) UTW Project (HR-559) initiated Ultra-Thin Whitetopping in Iowa. The project is located on Iowa Highway 21 between Iowa Highway 212 and U.S. Highway 6 in Iowa County, near Belle Plaine, Iowa. The above listed research project lasted for five years, and then was extended for another five year period. The new phase of the project (TR 432) was initiated by removing cracked panels existing in the 2-inch thick PCC sections and replacing them with three inches of PCC. The project extension provides an increased understanding of slab bonding conditions over a longer period, as well as knowledge regarding the behavior of the newly rehabilitated areas. This report documents the rehabilitation of the PCC patching of all fractured panels and several cracked panels, taking place in September of 2001.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, Worth, Poweshiek, and Johnson counties. The construction techniques and methods that were studied included concrete overlays and material usage. By evaluating these methods, highway agencies can explore different ways of making road construction less costly and can minimize the amount of time that the traveling public is exposed to road construction.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Certain areas of Iowa abound in loess, others contain soft limestones that are readily and cheaply available, and a large portion of the state is underlaid with sand. None of these materials is considered suitable in present practices for use in all-weather road construction. The loess is too fine and too difficult to handle; the limestones are considered too soft, and some of the harder ones unsound for this use; the sands are not naturally of the desired gradation and do not lend themselves to blending into satisfactory gradations. The purpose of this project is, therefore, to study and develop means and to determine the feasibility of using these materials, loess, fine sand, and soft limestones, either separately or in combinations in conjunction with liquid binders to produce paving mixtures applicable for all-weather road construction. Also included in the project was the development of methods of processing any of these materials, if necessary, to make them suitable for the desired purpose

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objectives of this work were to document the state-of-the-practice with respect to polymer concrete overlays, document the placement of two overlays in Iowa, monitor the field performance of the overlays over a two-year period, and relate their performance to material usage and/or workmanship. The two bridges - a Johnson County, Iowa bridge over I-80 on 12th Avenue in Coralville, and the Keg Creek Bridge on Hwy 6 in western Iowa, 10 miles east of Council Bluffs - were overlaid during the summer/fall of 2013. The process by which each bridge was overlaid was similar in many ways, although a few slight differences existed. Over time, each overlay has generally performed quite well with only a few areas of exception. It is believed that these localized areas likely underperformed due to poor deck preparation, improper polymer mixing, snowplow impact, or a combination thereof.