23 resultados para risky asset


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Midwest Transportation Consortium (MTC) recently completed its sixth year of operation. The MTC has become an established portion of the research and educational programs at ISU and its partner universities. The MTC continues to emphasize its primary focus of developing human capital. For example, this semester, Fall, 2005, ISU has graduate scholars in its educational program. However, we also recognize that the federal grant is an opportunity to build programs at our respective universities that continue after the U.S. DOT UTCP may end. An example of building a long lasting program is the University of Missouri – St. Louis’ (UMSL) and its development of a transportation Ph.D. program in their business college. Admittedly, this program could have been started regardless, but Dr. Ray Mundy, Director of UMSL’s Transportation Scholars Program, believes that the MTC support of the transportation educational program at UMSL was the essential component in establishing a Ph.D. program. At ISU, the MTC has been instrumental in establishing two research and outreach programs, and both have themes that are related to the MTC’s theme of “Transportation System Management and Operation.” The Center for Weather Impacts on Mobility and Safety (C-WIMS) was recently established, and the Center for Road Infrastructure Management and Operations (RIMO) is in the process of being established. The MTC has a critical role in establishing each of these two programs. As part of the on-going MTC program, we have established an effective network that promotes the education of future transportation professionals and the development of new knowledge on how to manage transportation infrastructure and services in a more sustainable manner. The MTC has a track record of developing outstanding students; these students are now becoming leaders in the private sector, government, and academia. The MTC has also supported the development of an extensive research portfolio related to sustainable transportation asset management. More research projects are in the pipeline. Finally, the MTC has dedicated itself to the dissemination of asset management research results through an ongoing technology transfer program. This document provides a progress for the latest fiscal year of operation of the MTC, which ran from October 2004 through September 2005.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Geographic information systems (GIS) and artificial intelligence (AI) techniques were used to develop an intelligent snow removal asset management system (SRAMS). The system has been evaluated through a case study examining snow removal from the roads in Black Hawk County, Iowa, for which the Iowa Department of Transportation (Iowa DOT) is responsible. The SRAMS is comprised of an expert system that contains the logical rules and expertise of the Iowa DOT’s snow removal experts in Black Hawk County, and a geographic information system to access and manage road data. The system is implemented on a mid-range PC by integrating MapObjects 2.1 (a GIS package), Visual Rule Studio 2.2 (an AI shell), and Visual Basic 6.0 (a programming tool). The system could efficiently be used to generate prioritized snowplowing routes in visual format, to optimize the allocation of assets for plowing, and to track materials (e.g., salt and sand). A test of the system reveals an improvement in snowplowing time by 1.9 percent for moderate snowfall and 9.7 percent for snowstorm conditions over the current manual system.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In most highway asset management exercises, real estate used in alignments is considered to be an asset class that does not depreciate. Although the treatment of right of way assets as non-depreciable real property may be appropriate as an accounting exercise, the fact is that the real estate contained in transportation corridors can in fact lose value from a traffic service point of view. Such facilities become functionally obsolete in that they no longer serve the purpose that was intended when they were planned, designed, and built. This report is intended to begin a discussion of the topic of how highway alignments ought be valued as assets as opposed to how they generally are valued, at either book value or replacement value, given it can be shown that some highway alignments do in fact depreciate in value.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study aims to improve the accuracy and usability of Iowa Falling Weight Deflectometer (FWD) data by incorporating significant enhancements into the fully-automated software system for rapid processing of the FWD data. These enhancements include: (1) refined prediction of backcalculated pavement layer modulus through deflection basin matching/optimization, (2) temperature correction of backcalculated Hot-Mix Asphalt (HMA) layer modulus, (3) computation of 1993 AASHTO design guide related effective SN (SNeff) and effective k-value (keff ), (4) computation of Iowa DOT asphalt concrete (AC) overlay design related Structural Rating (SR) and kvalue (k), and (5) enhancement of user-friendliness of input and output from the software tool. A high-quality, easy-to-use backcalculation software package, referred to as, I-BACK: the Iowa Pavement Backcalculation Software, was developed to achieve the project goals and requirements. This report presents theoretical background behind the incorporated enhancements as well as guidance on the use of I-BACK developed in this study. The developed tool, I-BACK, provides more fine-tuned ANN pavement backcalculation results by implementation of deflection basin matching optimizer for conventional flexible, full-depth, rigid, and composite pavements. Implementation of this tool within Iowa DOT will facilitate accurate pavement structural evaluation and rehabilitation designs for pavement/asset management purposes. This research has also set the framework for the development of a simplified FWD deflection based HMA overlay design procedure which is one of the recommended areas for future research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This study aims to improve the accuracy and usability of Iowa Falling Weight Deflectometer (FWD) data by incorporating significant enhancements into the fully-automated software system for rapid processing of the FWD data. These enhancements include: (1) refined prediction of backcalculated pavement layer modulus through deflection basin matching/optimization, (2) temperature correction of backcalculated Hot-Mix Asphalt (HMA) layer modulus, (3) computation of 1993 AASHTO design guide related effective SN (SNeff) and effective k-value (keff ), (4) computation of Iowa DOT asphalt concrete (AC) overlay design related Structural Rating (SR) and kvalue (k), and (5) enhancement of user-friendliness of input and output from the software tool. A high-quality, easy-to-use backcalculation software package, referred to as, I-BACK: the Iowa Pavement Backcalculation Software, was developed to achieve the project goals and requirements. This report presents theoretical background behind the incorporated enhancements as well as guidance on the use of I-BACK developed in this study. The developed tool, I-BACK, provides more fine-tuned ANN pavement backcalculation results by implementation of deflection basin matching optimizer for conventional flexible, full-depth, rigid, and composite pavements. Implementation of this tool within Iowa DOT will facilitate accurate pavement structural evaluation and rehabilitation designs for pavement/asset management purposes. This research has also set the framework for the development of a simplified FWD deflection based HMA overlay design procedure which is one of the recommended areas for future research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The work of the Department of Natural Resources impacts the lives of all Iowans. Iowans deserve a clean environment and quality natural areas for public use and enjoyment. This report reflects the progress made during fiscal year 2013 (FY13) toward our goals and provides information regarding the condition of our state’s natural resources and the effectiveness of our programs. In FY13, we continued to improve collaboration with other executive branch agencies. The DNR and DOT work very closely on the issuance of permits needed for road and bridge constructions, but recently we have also been working together to meet the administrative needs of the agencies. The DNR is working closely with the DOT to adopt an Electronic Records Management System used by the DOT. This system will improve accessibility to public documents and reduce the amount of paper files retained in storage. The DNR also continues to improve collaboration with other agencies, such as the Iowa Economic Development Authority as we work closely with them on business development in the state. The DNR strives to continually improve our customer service and how we can meet Iowan’s needs. As an example, the online reservation system for campground reservations has grown over the past eight years so that now 88% of the camping reservations are made online. The DNR continues to improve our online presence and accessibility. In FY13 the Iowa Legislature approved paying off the State’s bond debt used to construct Honey Creek Resort State Park. By removing this debt, the DNR will be able to focus more on the future of the Resort, rather than the past debt. Finally, in August of 2012, the DNR was faced with a tragic accident, where a seasonal parks employee died after rolling a mower into a lake. This incident has caused us to establish a Safety Program at the DNR and to review all of our departmental safety trainings, programs, and equipment. By focusing on our employee’s safety and well being, it is another way that we can demonstrate that at the DNR, our employees are our greatest asset.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

According to the Centers for Disease Control and Prevention (CDC), the number of adults reporting a disability is expected to increase, along with the need for appropriate medical and public health services. People with disabilities (PWD) face many barriers to good heath, including having overall poorer health, less access toadequate health care, limited access to health insurance, skipping mediacl care because of cost, and engaging in risky health behaviors including smoking and physical inactivity. The goals of the Iowa public health needs assessment were to assess the burden of disability in Iowa counties including health risk factors such as chronic conditions, determine access to preventive health care, and determine the effect of socioeconomic conditions. The state level assessment was based on th 2009-2012 American Community Survey (ACS) and publiccally available Behavioral Risk FactorSurveillance System (BRFSS) 2011 survey. The 2001-2010 combined BRFSS data was used for county level assessment. The needs assessment led us to conclude that adult Iowans with idsabilities face several challenges compared to non-disabled adults. They are more likely to suffer from debilitating chronic conditions and social disparities. Counties with the higher levels of poverty were more likely to have PWD with higher levels of disability related disparities.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The enclosed project request for funding will address needed conservation work within the Storm Lake Watershed. The proposed conservation practices and activities have been planned for several years but due to funding limitations have not been completed. These innovative practices will address some of the remaining and hard to address problem areas of sediment and nutrient loading within the watershed. The four goals of this project are: installation of four in-stream Boulder Weirs, planting of native grasses around ten surface intakes, completion of three urban rain gardens and hiring of a part-time Iowater monitoring coordinator. Through the new Awaysis destination park project Storm Lake is truly placing a high value on our watershed and lake as a major asset to the area. Awaysis is a $30 million project that's success will hinge on maintaining the highest standards in regard to the water quality of the lake and its watershed.