34 resultados para process specification


Relevância:

20.00% 20.00%

Publicador:

Resumo:

A statewide evaluation of the six adult and three juvenile drug courts in operation during calendar year 2003 was conducted. Completion rates, recidivism, substance abuse treatment, and supervision and placement (juveniles only) costs were examined by model (Judge and Community Panel) and by Judicial District. In addition, adult drug court participants were compared with a group of offenders who were screened and declined or were rejected by drug court in 2003 (referred) and a sample of offenders starting probation in 2003 (probationer). The adult participant and comparison groups were tracked from their entry into drug court, or the study, through December 31, 2007. This yielded an average post-program follow-up time of almost 3 years (2.9) for drug court participants. For the juvenile portion, drug court participants were compared with a group matched on several demographic and offense variables (Matched Comparison group) and juveniles referred to drug court who did not enter the program (Referred Comparison group). The juvenile participant and comparison groups were tracked from their entry into drug court, or the study, through approximately 16 quarters after program discharge with an end date of December 31, 2007.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In July of 2009, the Division of Criminal and Juvenile Justice Planning (CJJP) received Byrne Justice Assistance Grant/American Recovery and Reinvestment Act funding from the Governor’s Office of Drug Control Policy to conduct a process and outcome evaluation of the STAR (Sisters Together Achieving Recovery) program housed at the Iowa Correctional Institution for Women (ICIW) in Mitchellville, Iowa. The STAR Program is a licensed inpatient substance abuse treatment program that utilizes a Therapeutic Community model (TC). All offenders exiting the STAR program between October 1, 2004 and June 30, 2008 were included in the study (n=173). A comparison sample was drawn of offenders exiting the ICIW during the same release time frame with identified but untreated substance abuse needs (n= 173). March 31, 2010 was designated as the cut-off date for the study. This yielded an average post-program follow-up time of 3.1 years. The STAR group was further divided into two groups by time of program exit. Participants exiting the program between October 1, 2004 and June 30, 2006 were designated as STAR 1 (n=78) and those exiting the program between July 1, 2006 and June 30, 2008 were designated as STAR 2 (n=95). In order to have comparable tracking time between STAR groups, tracking time for STAR 1 concluded July 31, 2008. This yielded an average post release follow-up time of 2.4 years for both groups. Demographic, Program, Intervention, and Outcome data were examined. Comparisons were made between groups as well as categories of participation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

State of Iowa Appropriations Process. Flow chart of the process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Budget Process: The Governor and the State Legislature appropriate the state resources after the revenue receipts are estimated by the Revenue Estimating Conference.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report outlines the current drugs testing practices and using these practices for testing requirements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In the United States many bridge structures have been designed without consideration for their unique construction problems. Many problems could have been avoided if construction knowledge and experience was utilized in the design process. A systematic process is needed to create and capture construction knowledge for use in the design process. This study was conducted to develop a system to capture construction considerations from field people and incorporate it into a knowledge-base for use by the bridge designers. This report presents the results of this study. As a part of this study a microcomputer-based constructability system has been developed. The system is a user-friendly microcomputer database which codifies construction knowledge, provides easy access to specifications, and provides simple design computation checks for the designer. A structure for the final database was developed and used in the prototype system. A process for collecting, developing and maintaining the database is presented and explained. The study involved a constructability survey, interviews with designers and constructors, and visits to construction sites to collect constuctability concepts. The report describes the development of the constructability system and addresses the future needs for the Iowa Department of Transportation to make the system operational. A user's manual for the system is included along with the report.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Researchers should continuously ask how to improve the models we rely on to make financial decisions in terms of the planning, design, construction, and maintenance of roadways. This project presents an alternative tool that will supplement local decision making but maintain a full appreciation of the complexity and sophistication of today’s regional model and local traffic impact study methodologies. This alternative method is tailored to the desires of local agencies, which requested a better, faster, and easier way to evaluate land uses and their impact on future traffic demands at the sub-area or project corridor levels. A particular emphasis was placed on scenario planning for currently undeveloped areas. The scenario planning tool was developed using actual land use and roadway information for the communities of Johnston and West Des Moines, Iowa. Both communities used the output from this process to make regular decisions regarding infrastructure investment, design, and land use planning. The City of Johnston case study included forecasting future traffic for the western portion of the city within a 2,600-acre area, which included 42 intersections. The City of West Des Moines case study included forecasting future traffic for the city’s western growth area covering over 30,000 acres and 331 intersections. Both studies included forecasting a.m. and p.m. peak-hour traffic volumes based upon a variety of different land use scenarios. The tool developed took goegraphic information system (GIS)-based parcel and roadway information, converted the data into a graphical spreadsheet tool, allowed the user to conduct trip generation, distribution, and assignment, and then to automatically convert the data into a Synchro roadway network which allows for capacity analysis and visualization. The operational delay outputs were converted back into a GIS thematic format for contrast and further scenario planning. This project has laid the groundwork for improving both planning and civil transportation decision making at the sub-regional, super-project level.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Quality management concrete allows the contractor to develop the mix design for the portland cement concrete. This research was initiated to gain knowledge about contractor mix designs. An experiment was done to determine the variation in cylinders, beams, and cores that could be used to test the strength of the contractor's mix. In addition, the contractor's cylinder strengths and gradations were analyzed for statistical stability and process capability. This research supports the following conclusions: (1) The mold type used to cast the concrete cylinders had an effect on the compressive strength of the concrete. The 4.5-in. by 9-in. (11.43-cm by 22.86-cm) cylinders had lower strength at a 95% confidence interval than the 4-in. by 8-in. (10.16-cm by 20.32-cm) and 6-in. by 12-in. (15.24-cm by 30.48-cm) cylinders. (2) The low vibration consolidation effort had the lowest strength of the three consolidation efforts. In particular, an interaction occurred between the low vibration effort and the 4.5-in. by 9-in. (11.43-cm by 22.86-cm) mold. This interaction produced very low compressive strengths when compared with the other consolidation efforts. (3) A correlation of 0.64 R-squared was found between the 28 day cylinder and 28 day compressive strengths. (4) The compressive strength results of the process control testing were not in statistical control. The aggregate gradations were mostly in statistical control. The gradation process was capable of meeting specification requirements. However, many of the sieves were off target. (5) The fineness modulus of the aggregate gradations did not correlate well with the strength of the concrete. However, this is not surprising considering that the gradation tests and the strength tests did not represent the same material. In addition, the concrete still has many other variables that will affect its strength that were not controlled.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Disposal of used tires has been a problem throughout the United States. The 1991 Intermodal Surface Transportation Efficiency Act (ISTEA) requires the use of recycled rubber in asphalt concrete starting in FY94. A moratorium has delayed this requirement until FY95. The Iowa DOT has researched six projects using crumb rubber modifier in asphalt concrete using the wet process. This process involves using a blender-reactor to blend the asphalt cement and crumb rubber. Using the wet process the asphalt cement has to reach a hotter temperature, than is normally required, for reaction to occur. The wet process is also much more expensive than conventional asphalt. This research deals with using a dry process to incorporate crumb rubber into the asphalt concrete mix. The project was constructed by Western Engineering of Harlan, Iowa, on IA 37 between Earling, Iowa and US 59. It was completed in September 1993. Western Engineering used a double drum mixer to produce the crumb rubber modified asphalt concrete by the dry process. The production and construction went well with minor difficulty and the dry process is a less expensive procedure for producing crumb rubber modified asphalt concrete.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation has noticed an increase in the occurrence of excessively vibrated portland cement concrete (PCC) pavements. The overconsolidation of PCC pavements can be observed in several sections of PCC highways across the state of Iowa. Also, excessive vibration is believed to be a factor in the premature deterioration of several pavements in Iowa. To address the problem of excessive vibration, a research project was conducted to document the vibratory practices of PCC slipform paving in Iowa and determine the effect of vibration on the air content of pavement. The primary factors studied were paver speed, vibrator frequency, and air content relative to the location of the vibrator. The study concluded that the Iowa Department of Transportation specification of 5000 and 8000 vibrations per minute (vpm) for slipform pavers is effective for normal paver speeds observed on the three test paving projects. Excessive vibration was clearly identified on one project where a vibrator frequency was found to be 12,000 vpm. When the paver speed was reduced to half the normal speed, hard air contents indicated that excessive vibration was beginning to occur in the localized area immediately surrounding the vibrator at a frequency of 8000 vpm. Analysis of variance testing indicated many variables and interactions to be significant at a 95% confidence level; however, the variables and interactions that were found to be significant varied from project to project. This affirms the complexity of the process for consolidating PCC.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Quality granular materials suitable for building all-weather roads are not uniformly distributed throughout the state of Iowa. For this reason the Iowa Highway Research Board has sponsored a number of research programs for the purpose of developing new and effective methods for making use of whatever materials are locally available. This need is ever more pressing today due to the decreasing availability of road funds and quality materials, and the increasing costs of energy and all types of binder materials. In the 1950s, Professor L. H. Csanyi of Iowa State University had demonstrated both in the laboratory and in the field, in Iowa and in a number of foreign countries, the effectiveness of preparing low cost mixes by stabilizing ungraded local aggregates such as gravel, sand and loess with asphalt cements using the foamed asphalt process. In this process controlled foam was produced by introducing saturated steam at about 40 psi into heated asphalt cement at about 25 psi through a specially designed and properly adjusted nozzle. The reduced viscosity and the increased volume and surface energy in the foamed asphalt allowed intimate coating and mixing of cold, wet aggregates or soils. Through the use of asphalt cements in a foamed state, materials normally considered unsuitable could be used in the preparation of mixes for stabilized bases and surfaces for low traffic road construction. By attaching the desired number of foam nozzles, the foamed asphalt can be used in conjunction with any type of mixing plant, either stationary or mobile, batch or continuous, central plant or in-place soil stabilization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This issue review provides a review of Iowa's expenditure law and recent statutory and session-law changes that have changed the process. This issue review also includes examples from the fiscal year 2013 budget enacted during the 2012 legislative session to help explain how the various aspects of the expenditure limitation law are applied to legislative decision making. At the end of this issue review is a schematic showing the distribution of fiscal year 2012 general fund surplus revenues when the expenditure limitation provisions are applied.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Minimizing infiltration of water in pavement structures has long been a priority of pavement designers. Incorporation of subsurface edgedrains is frequently an integral part of an pavement drainage system. In order for such a system to be effective however, it must be properly installed and maintained. With advances in video technology, inspection of edgedrain systems can now be conducted quite efficiently. This report documents the results of 287 video inspections of highway edgedrain systems in 29 states. These inspections were conducted to both demonstrate the capabilities of the technology as well as demonstrating some of the common problems associated with the performance of edgedrain systems. Findings indicated not only that the equipment was quite effective in identifying edgedrain performance concerns, but also how widespread the concerns of edgedrain performance are. Almost one third of the systems inspected had nonfunctional outlets, another third were either found to have non-functional mainlines or the mainlines could not be inspected due to physical obstructions. Only one third of the systems inspected were found to be performing as intended. Recommendations are provided for edgedrain design improvements to facilitate performance of the system and their inspections as well as recommendations to improve quality control during construction. Suggestions are also provided for maintenance procedures to address concerns identified in the inspection process. A Draft Guide Specification For Video Edgedrain Inspection and Acceptance is also provided as an Appendix.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In 1990, early distress had shown up on US 20 in Hamilton/Webster counties, three years after paving. Since that time, over a dozen more projects, constructed between 1984 and 1994, have been found to exhibit similar early distress. Several changes to the concrete and Portland cement specifications occurred in 1994 and 1996. This study was undertaken to investigate in place concrete pavements before and after specification changes were implemented. The objective of this research is to evaluate the impact of Portland cement and concrete specification changes made in 1994 and 1996 on PCC durability. Cores were obtained in 1998 and 2003 from projects constructed in 1992, before specification changes, and 1997 after specification changes. The following is a brief summary of the conclusions: 1. The pavements in the study constructed under the new specifications are performing much better after 5 years of service than the pavements constructed under the old specifications. 2. According to ISU, micro-cracking is evident in all concrete that has been in service, due to thermal stresses and loading stresses. Also, the low vacuum SEM will desiccate the concrete enough to cause micro-cracking. The SEM should not be used as a tool to indicate micro-cracking. 3. Use of Type II cement (C3A <8%) and a 3.0% SO3 limit does not completely eliminate ettringite infilling in air voids, as indicated in the bottom of the 1997 cores. 4. In areas of high moisture (bottom of the core), infilling is present in most of the 1997 cores. 5. Low air content and high spacing factor in the top of 1992 cores apparently causes F/T cycling cracking and then increased moisture paths from cracking causes infilling. 6. Use of ground granulated blast furnace slag (GGBFS) and fly ash reduces ettringite infilling either by diluting the aluminate (C3A) or lowering permeability, which slows ingress of moisture. 7. The specification changes that made the biggest impact on pavement durability are the limits on vibration and increase in air content in September 1994. 8. Investigations of cores from pavements placed in 2002 and 2003 indicate improved air contents and spacing factors. In-place air content and spacing factors should be monitored to determine if appropriate air void parameters are being met.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent reports indicate that of the over 25,000 bridges in Iowa, slightly over 7,000 (29%) are either structurally deficient or functionally obsolete. While many of these bridges may be strengthened or rehabilitated, some simply need to be replaced. Before implementing one of these options, one should consider performing a diagnostic load test on the structure to more accurately assess its load carrying capacity. Frequently, diagnostic load tests reveal strength and serviceability characteristics that exceed the predicted codified parameters. Usually, codified parameters are very conservative in predicting lateral load distribution characteristics and the influence of other structural attributes. As a result, the predicted rating factors are typically conservative. In cases where theoretical calculations show a structural deficiency, it may be very beneficial to apply a "tool" that utilizes a more accurate theoretical model which incorporates field-test data. At a minimum, this approach results in more accurate load ratings and many times results in increased rating factors. Bridge Diagnostics, Inc. (BDI) developed hardware and software that are specially designed for performing bridge ratings based on data obtained from physical testing. To evaluate the BDI system, the research team performed diagnostic load tests on seven "typical" bridge structures: three steel-girder bridges with concrete decks, two concrete slab bridges, and two steel-girder bridges with timber decks. In addition, a steel-girder bridge with a concrete deck previously tested and modeled by BDI was investigated for model verification purposes. The tests were performed by attaching strain transducers on the bridges at critical locations to measure strains resulting from truck loading positioned at various locations on the bridge. The field test results were used to develop and validate analytical rating models. Based on the experimental and analytical results, it was determined that bridge tests could be conducted relatively easy, that accurate models could be generated with the BDI software, and that the load ratings, in general, were greater than the ratings, obtained using the codified LFD Method (according to AASHTO Standard Specifications for Highway Bridges).