We are depleting the once seemingly endless supply of aggregate available for concrete paving in Iowa. At the present time, some parts of our state do not have locally available aggregates of acceptable quality for portland cement concrete paving. This necessitates lengthy truck and rail hauls which frequently more than doubles the price of aggregate. In some parts of the state, the only coarse aggregates available locally are "d-cracking" in nature. Iowa's recycling projects were devised to alleviate the shortage of aggregates wherever they were found to have an economic advantage. We completed our first recycling project in 1976 on a 1.4 project in Lyon county. The data collected in this project was used to schedule two additional projects in 1977. The larger of these two projects is located in Page and Taylor county on Highway #2 and is approximately 15 miles in length. This material is to be crushed and re-used in the concrete paving, it is to be reconstructed on approximately the same alignment. The second project is part of the construction of Interstate I-680 north of council Bluffs where an existing 24 foot portland cement concrete roadway is to be recycled and used as the aggregate in the slip form econocrete subbase and the portland cement concrete shoulders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report discusses the asphalt pavement recycling project designated Project HR-188 in Kossuth County, Iowa. Specific objectives were: (a) to determine the effectiveness of drum mixing plant modifications designed to control air pollution within limits specified by the Iowa Department of Environmental Quality; (b) to assess the impact of varying the proportions of recycled and virgin aggregates, (c) to assess the impact of varying the production rate of the plant, and (d) to assess the impact of varying the mixing temperature. The discussion includes information on the proposed use of research funds, project location and description, the project planning conference, plan development, bid letting, asphalt plant configuration, actual plant operation, why this method is successful, probable process limitations, pollution results, recycled pavement test results, and the cost of virgin vs. recycled asphalt pavements.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report provides details of IADOT's experience removing and crushing asphaltic concrete and portland cement concrete for recycling. The recycled material was used on interstate highways for the subbase and shoulders. The major problem IADOT encountered on this project was the removal of reinforcing steel from the broken concrete. The contractor used hydraulic powered shears to clip off all protruding steel during the removal and loading of the concrete on the grade. This project took place in 1977.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The liquid and plastic limits of a soil are consistency limits that were arbitrarily chosen by Albert Atterberg in 1911. Their determination is by strictly empirical testing procedures. Except for the development of a liquid limit device and subsequent minor refinements the method has remained basically unchanged for over a half century. The empirical determination of an arbitrary limit would seem to be contrary to the very foundations of scientific procedures. However, the tests are relatively simple and the results are generally acceptable and valuable in almost every conceivable use of soil from an engineering standpoint. Such a great volume of information has been collected and compiled by application of these limits to cohesive soils, that it would be impractical and virtually impossible to replace the tests with a more rational testing method. Nevertheless, many believe that the present method is too time consuming and inconsistent. Research was initiated to investigate the development of a rapid and consistent method by relating the limits to soil moisture tension values determined by porous plate and pressure membrane apparatus. With the moisture tension method, hundreds of samples may be run at one time, operator variability is minimal, results are consistent, and a high degree of correlation to present liquid limit tests is possible.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximately 40,000 tons of slightly damaged asphalt concrete has been removed from Interstate 80 in Cass and stockpiled. Laboratory tests had indicated that this material had considerable value when upgraded with new aggregate and asphalt cement. This report documents the procedures used and results obtained on an experimental recycling project. It was demonstrated that present drum mixing-recycling equipment and procedures can be used to utilize this material with satisfactory results. Laboratory analyses of material components and mixtures were performed; these analyses indicate mixture can be produced that is uniform, stable, and very closely resembles mixture produced with all new material. Follow~up evaluations will be made to determine the effects of traffic and environment. Preliminary data indicate that plans should be made to incorporate the stockpiled material in projects near the stockpile site.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Columbus Laboratories of Battelle Memorial Institute is currently conducting a study of the effect of cement on moisture migration in concrete as related to the problem of D-cracking of portland cement concrete pavements. The study began on December 31, 1970, and is planned as a 3-year program. The work plan, approved by the policy committee of the members of the Iowa, Kansas, and Missouri highway departments and the Federal Highway Administration, is composed of four parts. The first phase (A) of the investigation concerned the movement of moisture into and from hardened cement pastes and the dimensional changes accompanying the moisture changes. Small slab specimens of hardened neat cement pastes were prepared from 32 different cements which were prepared at the same water/cement ratio and hydrated to the same maturity factor.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Approximately 40,000 tons of deteriorated asphalt concrete has been removed from Interstate 80 in Cass County and stockpiled. Laboratory tests indicate that this material has considerable value when upgraded with new aggregate and asphalt cement. This report documents the procedures used and results obtained on an experimental recycling project. It was demonstrated that present drum mixing-recycling equipment and procedures can be used to utilize this material with satisfactory results. Laboratory analyses of material components and mixtures were performed; these analyses indicate mixture can be produced that is uniform, stable, and very closely resembles mixture produced with all virgin material. A 1700 foot long test section was constructed on US 169 in Kossuth County wherein salvaged asphalt concrete from I-80 in Cass County was utilized. The salvaged mix was blended with virgin aggregate and recycled through a modified drum mixing plant, the reprocessed mixture was satisfactorily placed 1 1/2 inches thick as a resurfacing course on an old PCC pavement. An inspection of the test section was made in December of 1978 to evaluate the performance after one full year of service. There was no evidence of rutting or shoving from traffic. The surface does, however, have a very dry and somewhat ravelled appearance. This can be related to a low asphalt content in the mix and some temperature control problems which were difficult to get fully corrected on such a short project and with a short supply of readily available materials.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Portland cement concrete is an outstanding structural material but stresses and cracks often occur in large structures due to drying shrinkage. The objective of this research was to determine the change in length due to loss of moisture from placement through complete drying of portland cement concrete. The drying shrinkage was determined for four different combinations of Iowa DOT structural concrete mix proportions and materials. The two mix proportions used were an Iowa DOT D57 (bridge deck mix proportions) and a water reduced modified C4 mix. Three 4"x 4"x 18" beams were made for each mix. After moist curing for three days, all beams were maintained in laboratory dry air and the length and weight were measured at 73°F ± 3°F. The temperature was cycled on alternate days from 73°F to 90°F through four months. From four months through six months, the temperature was cycled one day at 73°F and six days at 130°F. It took approximately six months for the concrete to reach a dry condition with these temperatures. The total drying shrinkage for the four mixes varied from .0106 in. to .0133 in. with an average of .0120 in. The rate of shrinkage was approximately .014% shrinkage per 1% moisture loss for all four mixes. The rate and total shrinkage for all four mixes was very similar and did not seem to depend on the type of coarse aggregate or the use of a retarder.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pavements are subjected to different stresses during their design lives. A properly designed pavement will perform adequately during its design life, and the distresses will not exceed the allowable limits; however, there are several factors that can lead to premature pavement failure. One such factor is moisture sensitivity. AASHTO T 283 is the standard test used in the moisture susceptibility evaluation of asphalt mixtures, but the results of the test are not very representative of the expected behavior of asphalt mixtures. The dynamic modulus test measures a fundamental property of the mixture. The results of the dynamic modulus test can be used directly in the Mechanistic-Empirical Pavement Design Guide (MEPDG) and are considered a very good representation of the expected field performance of the mixture. Further research is still needed to study how the dynamic modulus results are affected by moisture. The flow number test was studied in previous research as a candidate test for moisture-susceptibility evaluation, but the results of that research were not favorable. This research has four main objectives. The first objective of this research is to evaluate the usefulness of the dynamic modulus and flow number tests in moisture-susceptibility evaluation. The second objective is to compare the results to those achieved using the AASHTO T 283 test. The third objective is to study the effect of different methods of sample conditioning and testing conditions. The fourth objective of the research is to study the variability in the test results.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The objective is to determine the optimum percentage of water needed to produce the best foam properties for a given asphalt binder. The optimum water content is determined by achieving the maximum expansion ratio and half-life of the foamed asphalt. Expansion ratio is defined as the maximum volume over its original volume and half-life is defined as the time in seconds for foam to become a half of its maximum volume.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A specification for contractor moisture quality control (QC) in roadway embankment construction has been in use for approximately 10 years in Iowa on about 190 projects. The use of this QC specification and the development of the soils certification program for the Iowa Department of Transportation (DOT) originated from Iowa Highway Research Board (IHRB) embankment quality research projects. Since this research, the Iowa DOT has applied compaction with moisture control on most embankment work under pavements. This study set out to independently evaluate the actual quality of compaction using the current specifications. Results show that Proctor tests conducted by Iowa State University (ISU) using representative material obtained from each test section where field testing was conducted had optimum moisture contents and maximum dry densities that are different from what was selected by the Iowa DOT for QC/quality assurance (QA) testing. Comparisons between the measured and selected values showed a standard error of 2.9 lb/ft3 for maximum dry density and 2.1% for optimum moisture content. The difference in optimum moisture content was as high as 4% and the difference in maximum dry density was as high as 6.5 lb/ft3 . The difference at most test locations, however, were within the allowable variation suggested in AASHTO T 99 for test results between different laboratories. The ISU testing results showed higher rates of data outside of the target limits specified based on the available contractor QC data for cohesive materials. Also, during construction observations, wet fill materials were often observed. Several test points indicated that materials were placed and accepted at wet of the target moisture contents. The statistical analysis results indicate that the results obtained from this study showed improvements over results from previous embankment quality research projects (TR-401 Phases I through III and TR-492) in terms of the percentage of data that fell within the specification limits. Although there was evidence of improvement, QC/QA results are not consistently meeting the target limits/values. Recommendations are provided in this report for Iowa DOT consideration with three proposed options for improvements to the current specifications. Option 1 provides enhancements to current specifications in terms of material-dependent control limits, training, sampling, and process control. Option 2 addresses development of alternative specifications that incorporate dynamic cone penetrometer or light weight deflectometer testing into QC/QA. Option 3 addresses incorporating calibrated intelligent compaction measurements into QC/QA.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There are still many vintage portland cement concrete (PCC) pavements, 18 ft wide (5.4 m), dating back to pre-World War II era in use today. Successive overlays have been placed to cover joints and to improve rideability. The average thickness of the existing asphalt cement concrete (ACC) along route E66 in Tama County, Iowa, was 6.13 in. (15.6 cm). The rehabilitation strategy called for widening the base using the top 3 in. (7.6 cm) of the existing ACC by a recycling process involving cold milling and mixing with additional emulsion/rejuvenator. The material was then placed into a widening trench and compacted to match the level of the milled surface. This project was undertaken to develop a rehabilitation methodology to widen these older pavements economically and to have a finished surface capable of carrying traffic with little or no additional work.