31 resultados para engineering projects management
Resumo:
Excessive speed on State and County highways is recognized as a serious problem by many Iowans. Speed increases both the risk and severity of accidents. Studies conducted by the FHWA and NHTSA have concluded that if average speeds were increased by five MPH, fatalities would increase by at least 2,200 annually. Along with the safety problems associated with excessive speed are important energy considerations. When the national speed limit was lowered to 55 MPH in 1974, a tremendous savings in fuel was realized. The estimated actual savings for automobiles amounted to 2.2 billion gallons, an average of 20.75 gallons for each of the 106 million automobiles registered in 1975. These benefits prompted the Federal-Aid Amendment of 1974 requiring annual State enforcement certification as a prerequisite for approval of Federal-aid highway projects. In 1978, the United States D.O.T. recommended to Congress significant changes in speed limit legislation designed to increase compliance with the national speed limit. The Highway Safety Act of 1978 provides for both withholding Federal-aid highway funds and awarding incentive grants based on speed compliance data submitted annually. The objective of this study was to develop and make operational, an automatic speed monitoring system which would have flexible capabilities of collecting accurate speed data on all road systems in Iowa. It was concluded that the Automatic Speed Monitoring Program in Iowa has been successful and needed data is being collected in the most economical manner possible.
Resumo:
The Iowa Department of Transportation (DOT) is continually improving the pavement management program and striving to reduce maintenance needs. Through a 1979 pavement management study, the Iowa DOT became a participant in a five state Federal Highway Administration (FHWA) study of "Transverse Cracking of Asphalt Pavements". There were numerous conclusions and recommendations but no agreement as to the major factors contributing to transverse cracking or methods of preventing or reducing the occurrence of transverse cracking. The project did focus attention on the problem and generated ideas for research. This project is one of two state funded research projects that were a direct result of the FHWA project. Iowa DOT personnel had been monitoring temperature susceptibility of asphalt cements by the Norman McLeod Modified Penetration Index. Even though there are many variables from one asphalt mix to another, the trend seemed to indicate that the frequency of transverse cracking was highly dependent on the temperature susceptibility. Research project HR-217 "Reducing the Adverse Effects of Transverse Cracking" was initiated to verify the concept. A final report has been published after a four-year evaluation. The crack frequency with the high temperature susceptible asphalt cement was substantially greater than for the low temperature susceptible asphalt cement. An increased asphalt cement content in the asphalt treated base also reduced the crack frequency. This research on prevention of transverse cracking with fabric supports the following conclusions: 1. Engineering fabric does not prevent transverse cracking of asphalt cement concrete. 2. Engineering fabric may retard the occurrence of transverse cracking. 3. Engineering fabric does not contribute significantly to the structural capability of an asphalt concrete pavement.
Resumo:
There has been a great deal of concern by county engineers and supervisors over constrained budgets, lack of resources and a deteriorating infrastructure, as they affect the secondary road system in Iowa. In addition, public input and/or political pressure have been increasing over the years. This study was initiated to determine the most important issues facing counties and document the way in which various Iowa counties have been addressing those issues. The list of issues was developed through meetings of county engineers and supervisors in each of the Iowa Department of Transportation (DOT) regions around the state. Questionnaires were sent to all engineers and supervisors statewide asking them how the various issues (e.g. snow and ice removal policies, Level "B" roads, and so on) were handled in their respective counties. The responses were then compiled into this document. The subjects selected and used include: county policies, ordinances, resolutions; snow and ice removal policy; dust control; Level "B" roads; vacating roads; rural development; private entrance construction and maintenance; roadside management practices; right of way encroachments and easements; personnel matters, staff and organization; communicating information to citizens; supervisor/ engineer relations; and county leasing/purchasing practices.
Resumo:
The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.
Resumo:
This report presents the results of a number of detailed Iowa access management case studies. Case studies were selected to provide a cross-section of locations and community sizes in Iowa as well as a variety of project types. Generally, access management projects completed during the mid-1990s were chosen as case studies. Projects ranging from driveway consolidation to full raised medians were analyzed on a before and after basis in terms of traffic safety, traffic operations, and adjacent business vitality. Sources of information used for the case study analysis included: road project files; traffic accident records; state sales tax records; and personal interviews of business owners, business customers, and local officials. The case study results from Iowa essentially confirm results of previous access management research from around the nation. Recent access in Iowa had significant, positive impacts in terms of traffic safety. The average reduction of annual accidents and accident rates on improved roadways was approximately 40%. Improvements in access management also led to significantly better roadway operations for most case studies. Although a small number of individual businesses do report sales losses and/or customer complaints once projects have been completed, access management projects in Iowa have not had an adverse impact on the majority of businesses located along them. In fact, some access management projects in Iowa seem to have contributed to an improved business environment along the corridors that have been improved. The results from the Iowa case studies presented in this report will be used to develop access management education materials for Iowa transportation professionals and other audiences interested in the impacts of access management.
Resumo:
Address sustainability in all efforts. Sustainability should be at the core of all levels of homeland security and emergency management effort in Iowa. Capabilities need to be built for the long term, and without a sustainability plan in place, projects can quickly deplete uncertain levels of funding. Utilize an all-hazards methodology. Developing capabilities that are effective during a variety of disaster and emergency scenarios represents sound planning and resource management. Enhance capabilities through joint planning, training and exercise. Effective capabilities developed through coordinated planning efforts and an ongoing joint training and exercising program to ensure sustainment of prepared response. Utilize a collaborative approach to build capability. We will utilize whatever partnerships are necessary to build capability in the most effective manner possible. Regional partnerships have been, and will continue to be, in the forefront of the State of Iowa’s efforts to build and enhance capability. Enhance statewide capabilities. Whenever possible, we will identify and augment existing resources to provide statewide capability during a disaster or terrorist attack. Awareness, outreach and education. Open communication is critical to the success of any initiative. All projects implemented will have awareness, education and outreach components to ensure that all stakeholders are informed as to their responsibilities, capabilities and access. Information sharing and a common operating picture. The timely exchange of critical/actionable information is imperative to the success of every operation. The identification of a common operating picture allows decision makers to make informed decisions based on a unified understanding of the events around them.
Resumo:
In work-zone configurations where lane drops are present, merging of traffic at the taper presents an operational concern. In addition, as flow through the work zone is reduced, the relative traffic safety of the work zone is also reduced. Improving work-zone flow-through merge points depends on the behavior of individual drivers. By better understanding driver behavior, traffic control plans, work zone policies, and countermeasures can be better targeted to reinforce desirable lane closure merging behavior, leading to both improved safety and work-zone capacity. The researchers collected data for two work-zone scenarios that included lane drops with one scenario on the Interstate and the other on an urban arterial roadway. The researchers then modeled and calibrated these scenarios in VISSIM using real-world speeds, travel times, queue lengths, and merging behaviors (percentage of vehicles merging upstream and near the merge point). Once built and calibrated, the researchers modeled strategies for various countermeasures in the two work zones. The models were then used to test and evaluate how various merging strategies affect safety and operations at the merge areas in these two work zones.
Resumo:
TPMS is proposed as a distributed, PC-based system for automating two processes required for road improvements in Iowa: a) the annual preparation, submission, and approval of road improvement programs. b) the ongoing process of developing plans and obtaining approval for projects to be let for bids.
Resumo:
High-speed non-contact laser profilers have become the standard testing equipment for pavement management ride quality testing. The same technology used in the high-speed profilers is now being used in lightweight profilers for construction smoothness testing. The lightweight profilers have many advantages over the California 25-ft profilograph. Despite the many advantages of the lightweight profilers, there is resistance from the contracting industry toward eliminating the 25-ft profilograph for construction ride testing. One way to reduce or overcome the resistance is to evaluate and demonstrate the advantages/disadvantages of the lightweight profiler in actual field use in Iowa. The objective of the study was to purchase a lightweight profiler and to evaluate its suitability for construction smoothness quality verification and quality acceptance on Iowa projects. A lightweight profiler, an Ames Engineering, Inc. LISA single laser unit, was received in February 2003 for the study. Based on the work done during the 2003 construction season, the following conclusions can be made: (1) For hot mix asphalt surfaces, the LISA correlated well with the contractors' profilographs; (2) LISA results are significantly affected by longitudinal tining on portland cement concrete pavements, requiring a laser system upgrade to give accurate results; (3) A significant timesaving was realized by using the LISA; (4) Increasing visibility and reducing time in the construction zone improved safety; (5) One person with limited lifting capabilities could set up and operate the LISA; and (6) With the current Iowa Department of Transportation specification, the LISA cannot totally replace the profilograph, since bridges and short segments with no adjoining pavement would still require a profilograph.
Resumo:
For well over 100 years, the Working Stress Design (WSD) approach has been the traditional basis for geotechnical design with regard to settlements or failure conditions. However, considerable effort has been put forth over the past couple of decades in relation to the adoption of the Load and Resistance Factor Design (LRFD) approach into geotechnical design. With the goal of producing engineered designs with consistent levels of reliability, the Federal Highway Administration (FHWA) issued a policy memorandum on June 28, 2000, requiring all new bridges initiated after October 1, 2007, to be designed according to the LRFD approach. Likewise, regionally calibrated LRFD resistance factors were permitted by the American Association of State Highway and Transportation Officials (AASHTO) to improve the economy of bridge foundation elements. Thus, projects TR-573, TR-583 and TR-584 were undertaken by a research team at Iowa State University’s Bridge Engineering Center with the goal of developing resistance factors for pile design using available pile static load test data. To accomplish this goal, the available data were first analyzed for reliability and then placed in a newly designed relational database management system termed PIle LOad Tests (PILOT), to which this first volume of the final report for project TR-573 is dedicated. PILOT is an amalgamated, electronic source of information consisting of both static and dynamic data for pile load tests conducted in the State of Iowa. The database, which includes historical data on pile load tests dating back to 1966, is intended for use in the establishment of LRFD resistance factors for design and construction control of driven pile foundations in Iowa. Although a considerable amount of geotechnical and pile load test data is available in literature as well as in various State Department of Transportation files, PILOT is one of the first regional databases to be exclusively used in the development of LRFD resistance factors for the design and construction control of driven pile foundations. Currently providing an electronically organized assimilation of geotechnical and pile load test data for 274 piles of various types (e.g., steel H-shaped, timber, pipe, Monotube, and concrete), PILOT (http://srg.cce.iastate.edu/lrfd/) is on par with such familiar national databases used in the calibration of LRFD resistance factors for pile foundations as the FHWA’s Deep Foundation Load Test Database. By narrowing geographical boundaries while maintaining a high number of pile load tests, PILOT exemplifies a model for effective regional LRFD calibration procedures.
Resumo:
The 2015 Corridor Management Plan for the Iowa Great River Road is modeled after similar plans for other National Scenic Byways: it is a dynamic, written document that describes the broad range of goals, objectives, policies, programs, projects and activities which can assist with protecting the intrinsic resources of a byway; interpreting the engaging stories of the byway; and promoting and presenting the byway with services and amenities to meet the needs and expectations of the traveling public.
Resumo:
With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere. The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes. The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.
Resumo:
Address sustainability in all efforts. Sustainability should be at the core of all levels of homeland security and emergency management effort in Iowa. Capabilities need to be built for the long term, and without a sustainability plan in place, projects can quickly deplete uncertain levels of funding. Utilize an all-hazards methodology. Developing capabilities that are effective during a variety of disaster and emergency scenarios represents sound planning and resource management. Enhance capabilities through joint planning, training and exercise. Effective capabilities developed through coordinated planning efforts and an ongoing joint training and exercising program to ensure substantiate of prepared response. Utilize a collaborative approach to build capability. We will utilize whatever partnerships are necessary to build capability in the most effective manner possible. Regional partnerships have been, and will continue to be, in the forefront of the State of Iowa’s efforts to build and enhance capability. Enhance statewide capabilities. Whenever possible, we will identify and augment existing resources to provide statewide capability during a disaster or terrorist attack. Awareness, outreach and education. Open communication is critical to the success of any initiative. All projects implemented will have awareness, education and outreach components to ensure that all stakeholders are informed as to their responsibilities, capabilities and access. Information sharing and a common operating picture. The timely exchange of critical/actionable information is imperative to the success of every operation. The identification of a common operating picture allows decision makers to make informed decisions based on a unified understanding of the events around them.
Resumo:
Bridge construction projects are becoming increasingly complex as the demand for context-sensitive solutions, aesthetic designs, and accelerated bridge construction becomes more prevalent. In addition, the Iowa Department of Transportation (Iowa DOT) is entering a phase of design and construction of large border bridges, such as the I-80 (let 2008 for $56 million) and US 34 bridges over the Missouri River and I-74 over the Mississippi River. Compared to typical construction projects, these bridges generate more contractor Requests for Information (RFIs), Value Engineering (VE) proposals, Requests for Changes (RFCs), and shop drawings. Management of these submittals is a significant challenge for Resident Construction Engineers (RCEs) and other Iowa DOT staff. In addition, some submittals require cross-departmental and project consultant reviews. Commercially available software exists for managing submittals and project collaboration teams; in-house solutions may also be possible. Implementation is intended to speed construction submittal review time, reduce incidence of delay claims, and free up Iowa DOT staff from project management administrative tasks. Researchers from Iowa State University working with the Iowa DOT conducted a multi-pronged approach to indentify a web-based collaboration solution for Iowa DOT bridge projects. An investigation was launched to determine the functional needs of the Iowa DOT. Commercially available software programs were also evaluated to find what functionality is currently available. A Request for Proposals (RFP) was written to select a commercial web-based collaboration solution for pilot testing. In the second phase of research, a solution will be selected and implemented on two pilot projects. Lessons learned from these pilot projects will assist the Iowa DOT in developing and implementing a long-term solution to improve the management of Iowa DOT bridge projects.
Resumo:
The City of Marquette lies in the 65,000 acre Mississippi River watershed, and is surrounded by steep bluffs. Though scenic, controlling water runoff during storm events presents significant challenges. Flash-flooding from the local watershed has plagued the city for decades. The people of Marquette have committed to preserve the water quality of key natural resources in the area including the Bloody Run Creek and associated wetlands by undertaking projects to control the spread of debris and sediment caused by excess runoff during area storm events. Following a July 2007 storm (over 8” of rain in 24 hours) which caused unprecedented flood damage, the City retained an engineering firm to study the area and provide recommendations to eliminate or greatly reduce uncontrolled runoff into the Bloody Run Creek wetland, infrastructure damage and personal property loss. Marquette has received Iowa Great Places designation, and has demonstrated its commitment to wetland preservation with the construction of Phase I of this water quality project. The Bench Area Storm Water Management Plan prepared by the City in 2008 made a number of recommendations to mitigate flash flooding by improving storm water conveyance paths, detention, and infrastructure within the Bench area. Due to steep slopes and rocky geography, infiltration based systems, though desirable, would not be an option over surface based systems. Runoff from the 240 acre watershed comes primarily from large, steep drainage areas to the south and west, flowing to the Bench area down three hillside routes; designated as South East, South Central and South West. Completion of Phase I, which included an increased storage capacity of the upper pond, addressed the South East and South Central areas. The increased upper pond capacity will now allow Phase II to proceed. Phase II will address runoff from the South West drainage area; which engineers have estimated to produce as much water volume as the South Central and South East areas combined. Total costs for Phase I are $1.45 million, of which Marquette has invested $775,000, and IJOBS funding contributed $677,000. Phase II costs are estimated at $617,000. WIRB funding support of $200,000 would expedite project completion, lessen the long term debt impact to the community and aid in the preservation of the Bloody Run Creek and adjoining wetlands more quickly than Marquette could accomplish on its own.