66 resultados para engineering and maintenance enterprises
Resumo:
There has been a great deal of concern by county engineers and supervisors over constrained budgets, lack of resources and a deteriorating infrastructure, as they affect the secondary road system in Iowa. In addition, public input and/or political pressure have been increasing over the years. This study was initiated to determine the most important issues facing counties and document the way in which various Iowa counties have been addressing those issues. The list of issues was developed through meetings of county engineers and supervisors in each of the Iowa Department of Transportation (DOT) regions around the state. Questionnaires were sent to all engineers and supervisors statewide asking them how the various issues (e.g. snow and ice removal policies, Level "B" roads, and so on) were handled in their respective counties. The responses were then compiled into this document. The subjects selected and used include: county policies, ordinances, resolutions; snow and ice removal policy; dust control; Level "B" roads; vacating roads; rural development; private entrance construction and maintenance; roadside management practices; right of way encroachments and easements; personnel matters, staff and organization; communicating information to citizens; supervisor/ engineer relations; and county leasing/purchasing practices.
Resumo:
The SoftPlotter, a soft photogrammetric software and Silicon Graphics workstation, was used to evaluate the accuracy of soft photogrammetry and identify applications of this technology to highway engineering. A comparative study showed that SoftPlotter compares well with other software such as Socket and Integraph. The PC software TNTMips is inexpensive but needs further development to be comparable to SoftPlotter. The Campus Project showed that soft photogrammetry is accurate for traditional photogrammetric applications. It is also accurate for producing orthophoto and base maps for Geographic Information Systems (GISs). The Highway Project showed that soft photogrammetry is accurate for highway engineering and that the technical staff at the Iowa Department of Transportation (IA DOT) can be easily trained in this new technology. The research demonstrated that soft photogrammetry can be used with low-flight helicopter photography for large-scale mapping in highway engineering. The researchers recommend that research be conducted to test the use of digital cameras instead of the traditional aerial cameras in helicopter photography. Research that examines the use of soft photogrammetry with video logging imagery for inventory and GIS studies in highway maintenance is also recommended. Research is also warranted into the integration of soft photogrammetry with virtual reality, which can be used in three-dimensional designing and visualization of highways and subdivisions in real time. The IA DOT owns one analytical plotter and two analogue plotters. The analytical plotter is used for aerial triangulation, and the analogue plotters are used for plotting. However, neither is capable of producing orthophotos. Therefore, the researchers recommend that the IA DOT purchase soft photogrammetric workstations for orthophoto production, and if and when required, use it for aerial triangulation and plotting. In the future, the analogue plotters may become obsolete. At that time, the researchers recommend that the analogue plotters be phased out and replaced by soft photogrammetric workstations.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
Women in Science and Engineering (WISE) Program is to expand and improve educational and professional opportunities for women in all fields of science, technology, engineering and math (STEM) by facilitating individual, institutional, and social change.
Resumo:
The 2003 Iowa General Assembly asked the Iowa Department of Transportation (Iowa DOT) to conduct a study of Iowa public policy regarding coordination of public transit services and school transportation. This report describes the efficiencies that may be obtained by coordinating transit management and maintenance systems in the areas of school transportation, public transit, and other forms of public transportation. The Center for Transportation Research and Education (CTRE) at Iowa State University studied these issues and prepared this report for the Iowa DOT.
Resumo:
This research involved two studies: one to determine the local geoid to obtain mean sea level elevation from a global positioning system (GPS) to an accuracy of ±2 cm, and the other to determine the location of roadside features such as mile posts and stop signs for safety studies, geographic information systems (GIS), and maintenance applications, from video imageries collected by a van traveling at traffic speed.
Resumo:
The value of providing paved shoulders adjacent to many higher volume roadways has been accepted in many states across the country. Iowa’s paved shoulder policy is considerably more conservative than neighboring states, particularly on rural four-lane and high-volume two-lane highways. The objectives of this research are to examine current design criteria for shoulders employed in Iowa and surrounding states, compare benefits and costs of alternative surface types and widths, and make recommendations based on this analysis for consideration in future design policies for primary highway in Iowa. The report finds that many safety and maintenance benefits would result from enhancing Iowa’s paved shoulder and rumble strip design practices for freeways, expressways, and Super 2 highway corridors. The benefits of paved shoulders include reduced numbers of certain crashes, higher capacity potentials, reduced maintenance, enhanced opportunities for other users such as bicyclists, and even possible increased longevity of pavements. Alternative paved shoulder policies and programming strategies are also offered, with detailed assessments of the benefits, costs, and budget impacts.
Resumo:
Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.
Resumo:
Concrete curing is closely related to cement hydration, microstructure development, and concrete performance. Application of a liquid membrane-forming curing compound is among the most widely used curing methods for concrete pavements and bridge decks. Curing compounds are economical, easy to apply, and maintenance free. However, limited research has been done to investigate the effectiveness of different curing compounds and their application technologies. No reliable standard testing method is available to evaluate the effectiveness of curing, especially of the field concrete curing. The present research investigates the effects of curing compound materials and application technologies on concrete properties, especially on the properties of surface concrete. This report presents a literature review of curing technology, with an emphasis on curing compounds, and the experimental results from the first part of this research—lab investigation. In the lab investigation, three curing compounds were selected and applied to mortar specimens at three different times after casting. Two application methods, single- and double-layer applications, were employed. Moisture content, conductivity, sorptivity, and degree of hydration were measured at different depths of the specimens. Flexural and compressive strength of the specimens were also tested. Statistical analysis was conducted to examine the relationships between these material properties. The research results indicate that application of a curing compound significantly increased moisture content and degree of cement hydration and reduced sorptivity of the near-surface-area concrete. For given concrete materials and mix proportions, optimal application time of curing compounds depended primarily upon the weather condition. If a sufficient amount of a high-efficiency-index curing compound was uniformly applied, no double-layer application was necessary. Among all test methods applied, the sorptivity test is the most sensitive one to provide good indication for the subtle changes in microstructure of the near-surface-area concrete caused by different curing materials and application methods. Sorptivity measurement has a close relation with moisture content and degree of hydration. The research results have established a baseline for and provided insight into the further development of testing procedures for evaluation of curing compounds in field. Recommendations are provided for further field study.
Resumo:
Bridge approach settlement and the formation of the bump is a common problem in Iowa that draws upon considerable resources for maintenance and creates a negative perception in the minds of transportation users. This research study was undertaken to investigate bridge approach problems and develop new concepts for design, construction, and maintenance that will reduce this costly problem. As a result of the research described in this report, the following changes are suggested for implementation on a pilot test basis: • Use porous backfill behind the abutment and/or geocomposite drainage systems to improve drainage capacity and reduce erosion around the abutment. • On a pilot basis, connect the approach slab to the bridge abutment. Change the expansion joint at the bridge to a construction joint of 2 inch. Use a more effective joint sealing system at the CF joint. Change the abutment wall rebar from #5 to #7 for non-integral abutments. • For bridges with soft foundation or embankment soils, implement practices of better compaction, preloading, ground improvement, soil removal and replacement, or soil reinforcement that reduce time-dependent post construction settlements.