39 resultados para design recovery
Resumo:
State Highway Departments and local street and road agencies are currently faced with aging highway systems and a need to extend the life of some of the pavements. The agency engineer should have the opportunity to explore the use of multiple surface types in the selection of a preferred rehabilitation strategy. This study was designed to look at the portland cement concrete overlay alternative and especially the design of overlays for existing composite (portland cement and asphaltic cement concrete) pavements. Existing design procedures for portland cement concrete overlays deal primarily with an existing asphaltic concrete pavement with an underlying granular base or stabilized base. This study reviewed those design methods and moved to the development of a design for overlays of composite pavements. It deals directly with existing portland cement concrete pavements that have been overlaid with successive asphaltic concrete overlays and are in need of another overlay due to poor performance of the existing surface. The results of this study provide the engineer with a way to use existing deflection technology coupled with materials testing and a combination of existing overlay design methods to determine the design thickness of the portland cement concrete overlay. The design methodology provides guidance for the engineer, from the evaluation of the existing pavement condition through the construction of the overlay. It also provides a structural analysis of various joint and widening patterns on the performance of such designs. This work provides the engineer with a portland cement concrete overlay solution to composite pavements or conventional asphaltic concrete pavements that are in need of surface rehabilitation.
Resumo:
An easy-living home requires a full-sized bathroom on the main level. Family members will appreciate the extra space and guests of all ages and abilities will feel more welcome. At a minimum, you’ll need a five foot circle of open floor space for maneuvering a wheelchair between bathroom fixtures. A small powder room won’t work for guests who use walkers or wheelchairs. A shower stall—with no curb to step over—is more convenient than a tub for most guests. Make sure the doorway opening for the bathroom is at least 32 inches wide (preferably 36 inches). Universal design features, such as these, make homes better for everyone.
Resumo:
If they don’t carry the item, ask them to order it for you. Look at discount stores, such as Target, Wal-Mart, K-Mart, or Menard’s (they are more likely to carry items with universal design features). Look at the “Gadgets and Gizmos” section of the Iowa State University Extension Web site on “Universal Design & Home Accessibility.”
Resumo:
The Iowa livestock industry generates large quantities of manure and other organic residues; composed of feces, urine, bedding material, waste feed, dilution water, and mortalities. Often viewed as a waste material, little has been done to characterize and determine the usefulness of this resource. The Iowa Department of Natural Resources initiated the process to assess in detail the manure resource and the potential utilization of this resource through anaerobic digestion coupled with energy recovery. Many of the pieces required to assess the manure resource already exist, albeit in disparate forms and locations. This study began by interpreting and integrating existing Federal, State, ISU studies, and other sources of livestock numbers, housing, and management information. With these data, models were analyzed to determine energy production and economic feasibility of energy recovery using anaerobic digestion facilities on livestock faxms. Having these data individual facilities and clusters that appear economically feasible can be identified specifically through the use of a GIs system for further investigation. Also livestock facilities and clusters of facilities with high methane recovery potential can be the focus of targeted educational programs through Cooperative Extension network and other outreach networks, providing a more intensive counterpoint to broadly based educational efforts.
Resumo:
According to the 1972 Clean Water Act, the Environmental Protection Agency (EPA) established a set of regulations for the National Pollutant Discharge Elimination System (NPDES). The purpose of these regulations is to reduce pollution of the nation’s waterways. In addition to other pollutants, the NPDES regulates stormwater discharges associated with industrial activities, municipal storm sewer systems, and construction sites. Phase II of the NPDES stormwater regulations, which went into effect in Iowa in 2003, applies to construction activities that disturb more than one acre of ground. The regulations also require certain communities with Municipal Separate Storm Sewer Systems (MS4) to perform education, inspection, and regulation activities to reduce stormwater pollution within their communities. Iowa does not currently have a resource to provide guidance on the stormwater regulations to contractors, designers, engineers, and municipal staff. The Statewide Urban Design and Specifications (SUDAS) manuals are widely accepted as the statewide standard for public improvements. The SUDAS Design manual currently contains a brief chapter (Chapter 7) on erosion and sediment control; however, it is outdated, and Phase II of the NPDES stormwater regulations is not discussed. In response to the need for guidance, this chapter was completely rewritten. It now escribes the need for erosion and sediment control and explains the NPDES stormwater regulations. It provides information for the development and completion of Stormwater Pollution Prevention Plans (SWPPPs) that comply with the stormwater regulations, as well as the proper design and implementation of 28 different erosion and sediment control practices. In addition to the design chapter, this project also updated a section in the SUDAS Specifications manual (Section 9040), which describes the proper materials and methods of construction for the erosion and sediment control practices.
Resumo:
In this paper, we examine the design of permit trading programs when the objective is to minimize the cost of achieving an ex ante pollution target, that is, one that is defined in expectation rather than an ex post deterministic value. We consider two potential sources of uncertainty, the presence of either of which can make our model appropriate: incomplete information on abatement costs and uncertain delivery coefficients. In such a setting, we find three distinct features that depart from the well-established results on permit trading: (1) the regulator’s information on firms’ abatement costs can matter; (2) the optimal permit cap is not necessarily equal to the ex ante pollution target; and (3) the optimal trading ratio is not necessarily equal to the delivery coefficient even when it is known with certainty. Intuitively, since the regulator is only required to meet a pollution target on average, she can set the trading ratio and total permit cap such that there will be more pollution when abatement costs are high and less pollution when abatement costs are low. Information on firms’ abatement costs is important in order for the regulator to induce the optimal alignment between pollution level and abatement costs.
Resumo:
Water fact sheet for Iowa Department of Natural Resources and the Geological Bureau.
Validation of the New Mix Design Process for Cold In-Place Rehabilitation Using Foamed Asphalt, 2007
Resumo:
Asphalt pavement recycling has grown dramatically over the last few years as a viable technology to rehabilitate existing asphalt pavements. Iowa's current Cold In-place Recycling (CIR) practice utilizes a generic recipe specification to define the characteristics of the CIR mixture. As CIR continues to evolve, the desire to place CIR mixture with specific engineering properties requires the use of a mix design process. A new mix design procedure was developed for Cold In-place Recycling using foamed asphalt (CIR-foam) in consideration of its predicted field performance. The new laboratory mix design process was validated against various Reclaimed Asphalt Pavement (RAP) materials to determine its consistency over a wide range of RAP materials available throughout Iowa. The performance tests, which include dynamic modulus test, dynamic creep test and raveling test, were conducted to evaluate the consistency of a new CIR-foam mix design process to ensure reliable mixture performance over a wide range of traffic and climatic conditions. The “lab designed” CIR will allow the pavement designer to take the properties of the CIR into account when determining the overlay thickness.
Resumo:
Granular shoulders are an important element of the transportation system and are constantly subjected to performance problems due to wind- and water-induced erosion, rutting, edge drop-off, and slope irregularities. Such problems can directly affect drivers’ safety and often require regular maintenance. The present research study was undertaken to investigate the factors contributing to these performance problems and to propose new ideas to design and maintain granular shoulders while keeping ownership costs low. This report includes observations made during a field reconnaissance study, findings from an effort to stabilize the granular and subgrade layer at six shoulder test sections, and the results of a laboratory box study where a shoulder section overlying a soft foundation layer was simulated. Based on the research described in this report, the following changes are proposed to the construction and maintenance methods for granular shoulders: • A minimum CBR value for the granular and subgrade layer should be selected to alleviate edge drop-off and rutting formation. • For those constructing new shoulder sections, the design charts provided in this report can be used as a rapid guide based on an allowable rut depth. The charts can also be used to predict the behavior of existing shoulders. • In the case of existing shoulder sections overlying soft foundations, the use of geogrid or fly ash stabilization proved to be an effective technique for mitigating shoulder rutting.
Resumo:
Eighty-five of 99 Iowa counties were declared Presidential Disaster Areas for Public Assistance and/orIndividual Assistance as a result of the tornadoes, storms, and floods over the incident period May 25 through August 13, 2008. Response dominated the state’s attention for weeks, with a transition to recovery as the local situations warranted. The widespread damage and severity of the impact on Iowans and their communities required a statewide effort to continue moving forward despite being surrounded by adversity. By all accounts, it will require years for the state to recover from these disasters. With an eye toward the future, recovery is underway across Iowa. As part of the Rebuild Iowa efforts, the Long Term Recovery Planning Task Force was charged with responsibilities somewhat different from other topical Task Force assignments. Rather than assess damage and report on how the state might address immediate needs, the Long Term Recovery Planning Task Force is directed to discuss and discern the best approach to the lengthy recovery process. Certainly, the Governor and Lieutenant Governor expect the task to be difficult; when planning around so many critical issues and overwhelming needs, it is challenging to think to the future, rather than to rise to the current day’s needs.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. A major component of the 2010-2014 Program is the full integration of funding allocated to the Iowa DOT from the American Recovery and Reinvestment Act of 2009 (Recovery Act). To date, the Recovery Act has provided over $400 million of additional federal funding for transportation in Iowa, including funding that is allocated to local governments and entities. Recovery Act funding will result in a record year for transportation construction in Iowa and the creation and retention of jobs. Opportunities for additionalRecovery Act transportation funding remain and will be pursued as they becomeavailable. While Recovery Act funding will make a one-time significant impact in addressing Iowa’s backlog of needs, it is important to note that there remains a large shortfall in sustained annual transportation investment to meet Iowa’s current and future critical transportation needs. In recognition of this shortfall, Governor Culver introduced and the legislature passed an I-JOBS proposal. I-JOBS will result in an additional $50 million of state funding to reduce structurally deficient and functionally obsolete bridges on the primary road system and approximately $10 million in funding for other modes of transportation including $3 million of new funding to support the expansion of passenger rail service in Iowa. I-JOBS, and the continuing gradual increase in funding due to TIME-21, will complement and extend the benefits of Recovery Act funding and set the stage for addressing the shortfall in annual funding in the next few years. Iowa’s transportation system is multi-modal; therefore, the Program encompasses investments in aviation, transit, railroads, trails, and highways. A major component of the Program is the highway section. The FY2010-2014 highway section is financially balanced and was developed to achieve several objectives. The Commission’s primary highway investment objective is stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. The highway section includes an annual average of $104 million for preserving the interstate system; an annual average of $78 million for non-interstate pavement preservation; an annual average of $36 million for non-interstate bridges; and an annual average of $14 million for safety projects. Another objective is to maintain the scheduled completion of interstate and non-interstate capacity and economic development projects that were identified in the previous Program and this Program does so. The final Commission objective is to further address capacity and economic development needs and the Commission has done so by adding several such projects to the Program. Construction improvements are partially funded through the current federal transportation act, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The act will expire September 30, 2009. With the expiration of SAFETEA-LU, there is significant uncertainty in the forecast of federal revenues in the out-years of this Program. The Commission and Iowa DOT will monitor federal actions closely and make adjustments to the Program as necessary. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter, or through participation in the Commission’s regular meetings or public input meetings held around the state each year are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change. You are invited to visit the Iowa DOT’s Web site at iowadot.gov for additional and regular updates about the department’s programs and activities.
Resumo:
Federal agencies will shortly begin distributing funding from the American Recovery and Reinvestment Act of 2009 (Recovery Act). They must do so in accordance with all nondiscrimination and equal opportunity statutes, regulations, and Executive Orders that apply to the distribution of funds under the Recovery Act. Agencies that grant funds also must ensure that their recipients and sub recipients comply with Title VI of the Civil Rights Act of 1964 (prohibiting race, color, and national origin discrimination including language access for limited English proficient persons), Section 504 of the rehabilitation Act of 1973 (prohibiting disability discrimination), Title IX of the Education Amendments of 1972 (prohibiting sex discrimination in education and training programs), the Age Discrimination Act of 1975 (prohibiting age discrimination in the provision of services), and a variety of program-specific statutes with nondiscrimination requirements.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.
Resumo:
Safeguard Iowa Partnership launched a survey to the business community to capture the impact from the 2008 disasters. Five hundred eighty surveys were completed and compiled for the report submitted to the Rebuild Iowa Office Economic and Workforce Development Task Force on August 20, 2008.