20 resultados para contract award procedure
Resumo:
For the past several year Kossuth County has had a scheduled maintenance program of bituminous seal coating. This program has been used to maintain the 467 miles of asphaltic concrete surfaced roads in Kossuth County. Since most of the experience that Kossuth County had in seal coating was with cutback asphalt, it was decided to include the use of emulsified asphalt in Kossuth County's 1980 seal coat program. Federal Demonstration Project Funds were requested from the Federal Highway Administration to study the use of emulsified asphalt and funding was granted under Demonstration Project No. 55,:Asphalt Emulsions for Highway Construction." Items studied were design and construction procedure cost of alternate material, energy consumption and environmental considerations. A construction contract was awarded to Everds Brothers, Inc. of Algona, Iowa, on July 1, 1980. There were four bidders on the 54.5 miles of seal coating that was let. A map showing the location of the seal coating projects is shown in Appendix A, and a copy of the contract is shown in Appendix B. The contractor started the project on July 11, 1980 and completed the project on August 1, 1980. Construction inspection and follow-up inspections of the project were conducted by personnel of the Kossuth County Engineer's Office and testing of the materials, friction testing and road rater testing were conducted by the Material's Department of the Iowa Department of Transportation.
Resumo:
The objective is to determine the optimum percentage of water needed to produce the best foam properties for a given asphalt binder. The optimum water content is determined by achieving the maximum expansion ratio and half-life of the foamed asphalt. Expansion ratio is defined as the maximum volume over its original volume and half-life is defined as the time in seconds for foam to become a half of its maximum volume.
Resumo:
The Iowa Department of Natural Resources uses benthic macroinvertebrate and fish sampling data to assess stream biological condition and the support status of designated aquatic life uses (Wilton 2004; IDNR 2013). Stream physical habitat data assist with the interpretation of biological sampling results by quantifying important physical characteristics that influence a stream’s ability to support a healthy aquatic community (Heitke et al., 2006; Rowe et al. 2009; Sindt et al., 2012). This document describes aquatic community sampling and physical habitat assessment procedures currently followed in the Iowa stream biological assessment program. Standardized biological sampling and physical habitat assessment procedures were first established following a pilot sampling study in 1994 (IDNR 1994a, 1994b). The procedure documents were last updated in 2001 (IDNR 2001a; 2001b). The biological sampling and physical habitat assessment procedures described below are evaluated on a continual basis. Revision of this working document will occur periodically to reflect additional changes.
Resumo:
Iowa Department of Public Health SFY 2015 Annual County Service Contract Listing. This publication strives to identify all service contracts administered by the Iowa Department of Public Health during the period of July 1, 2014 through June 30, 2015. Contracts may have been increased or decreased, and contract titles changed during the published period. Contracts listed in this summary are shown in alphabetical order by contractor within the county. Interdepartmental Agreements with state government agencies are at the back of the listing. Each page is divided into eight columns which identify the following: column 1: the county of the contractor; column 2: the contractor; column 3: the contract number; column 4: the contract title; column 5: the contract amount; column 6: the funding source; column 7: the start date of the contract and column 8: the end date of the contract.
Resumo:
This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.